HomeMy WebLinkAboutCOMCHECKCOMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Information
Energy Cade: 90.1 (2007) Standard
Project Tee: Nail Salon
Project Type: New Construction
Construction Site: OeredAgent
DeagnedContractor:
7245 East 146th street
Sam Hurt
Carmel, IN 46033
The Engineern Collaborative
2410 Executive or #100
Indianapolis, IN 46241
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts 1112
D
Allowed Watts
(BXC)
1-Break room (Common Spam Typm Lounge/Reaealion)
226
120
271
2-Restroom(Camman Spare Types:Reatrocros)
95
0.90
86
Allowance: recreative Appearance l Fix ID: W 1
95 (a)
1.00
95 (b)
3-Beck room(Common Sgem TypeaCiice - Endowed)
54
1.10
59
Allowance: DewratiW Appearance l Fir. ID: W1
54(a)
1.00
54(b)
4-Main mam(Remil:8des Area)
1357
1.70
2307
Allowance: Decoratlwe Appearance l Fix. ID: W1
1357(a)
1.00
1357(b)
Allowance: Demodive Appearance l Fix. ID: P1A
1351(s)
1.00
1357(b)
Allowance: Decorative Appearance l Fir. ID: P1 B
1357(a)
1.00
60 (b)
Total Mowed Wage =
5646
(a) Area claimed mist not exceed the illuminated area permtled fa this allowance type.
(b) Allowance is (B x C) or the octal weasels of the eaves groan in Section 2, whichever is less.
Proposed Interior Lighting Power
A
B
C
D
E
Rectum ID : Description / lamp / Wattage Per Lamp l Ballast
tamps/
M of
Fixture
(C X D)
Fixture
Fixtures
Waft.
Umiak room(Common SpaceTyce sxe�elRecreation)
Cl: Cl: Cher:
2-Restroom (Gammon Spece Types'RestmoutO
W1: W1: Immndescem 80W:
Ck C4: Other:
3-Bark mom (Common Spece Types Office - Endowed
W1: W1: Incandescent 60W:
Cl: Cl: Other:
4-Main mom (Rela'I'Sales Areal
W1: W1: Incandescent 60W:
o.,. o.,.,_Meep .om RELEASED FOR CONSTRUCTION
Su*ctto compliance with all regulations
of State and Local Codes
City of Calmel
DATE: 03/25/19
4
29
116
2
120
240
1
12
12
2
120
240
1
29
29
12
120
1440
3
780
2340
1
60
60
0
240
240
0
120
120
Report date: 02/07/19
on MEP.cck Page Iof 12
A
B
C
D
E
Fixture ID: Description / Lamp / Wattage Per Lamp / Ballad
Lampsl
p of
Fixating
(C X D)
Fixture
Fixtures
Waft.
C4: C4: Omer:
1 23 12
27e
T1 T : Wattage b rsed on current limiting device capacity
0 0 210
210
T2: T2: Wanage based an current limiting device rapacity
0 0 120
120
Total Proposed Watts=
Mn
Interior Lighting Compliance Statement
Compliance Statement The proposed interior light ng design represented in this document is consistent with the Wilding plans
specifications, and other calculators submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 90.1 (2007) Stance rd requirements In COMcheck Version 4.1.1.0 and to comply with any applicable
mandatary requirements listed in the Inspection Checklist. /l
Samuel L. Hutt, P.E. K�/'(.�p< 02/07/2019
Name - Title Signature Date
n
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and local Codes
City of Cannel
Report date: 02/07/19
on MEP.cck Page 2 of 12
DATE: 03/25/19
COMcheck Software Version 4.1.1.0
Mechanical Compliance Certificate
Project Information
Energy Cade: 90.1 (2007) Standard
Project Tee: Nail Salon
Lazlicn: Indianapolis, Indiana
Glints Zone: 5a
Project Type: New Constmcgon
Construction Site: OwnerlAgent
DesignerlCoMrect r:
7245 East 146th street
Sam Hurt
Cannel. IN 46033
The Engineem Collaborative
2410 Executive Dr #100
Indianapolis, IN 46241
Mechanical Systems List
Quantity System Type B Description
1 HVAC System I(Single Zane):
Heaeng:1 eM - Central Furnace, Gas, Capacity =168 k8tulh
Prepmed Efficiency = 80.00% Et, Required Etreierey: 81.00 % Et he 18%AFUE)
Coding: I ea& -Single Package DX Unit, Capacity= 96 kSWlh, Air -Coded Condenser
Proposed Efficiency =11.80 EER, Required ERdenci: 11.00 EER
Fen System: FAN SYSTEM 1-- Compliance (Motor nameplate HE mdbod): Passes
Fa in
FAN 1 Supply, Constant volume. 2000 GEM, 2.0 motor nameplate hp
1 Water Heater l:
Gas Instantaneous Water Heater, Capacity:0 gallons Input Riling: 199 kalulh
Proposed Efficiency: 0.99 EF, Required Efficiency: 0.67 EF
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcbeck Version 4.1.1.0 and to comply with any applicable
mandatory requirements listed In the Inspection Checklist. /1
Samuel L. Hurt, P.E. 02/07j2019
Name - Title Signature Date
n
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Carmel
Report date: 02/07/19
on MEP.cck Page 3of 12
DATE: 03/25/19
COMcheck Software Version 4.1.1.0
Inspection Checklist
Energy Code: 90.1 (2007) Standard
Requirements: 100.0% were addressed directly in the COMcheck software
Text in Me "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies Mat a code requirement will be met and how Mat is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
satlon
#
plan Review
Complies?
Comments/Assumptions
b0. .ID
4.2.2.
Plans, specifcations, and/or
1-Complies I
Requirement will be met.
6.4.2
calculations provide all information
'IODoes Not I
[PR211
with which compliance can be
IDNot Observable I
determined for the mechanical
Applicable
systems and equipment and
IDNot
document where exceptions to the
IsGndard are claimed Load
I
calculations per acceptable
engineering standards and
handbooks.
4.2.2,
Plans, specifcadons, and/or
(]Complies I
Requirement will be met.
7.4.1
calculations provide all Information
❑Does Not I
[PR371
,with which compliance can be
pNot Observable
'.determined for Me service water
❑Not Applicable li
heating systems and equipment and
document where exceptions to the
li
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
4.2.2
Plans, specifications, and/or
;OComplies
Requirement will be met.
[PR411
calculations provide all information
'IDDces Not
with which compliance can be
[]Not Observable
'determined for Me lighting and
Uhl Applicable
electrical systems and equipment and
document where exceptions to the
standard are claimed Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
6.7.2.4
Detailed instructions for HVAC
C7complies
Requirement will be met.
[12115]'
systems commissioning included on
ElDoes Not
Me plans or specifications for projects
❑Not Observable
>=50,000 R2.
ONot Applicable
8.4.1.1,
Plans, specifications, and/or
OComplies
Requirement will be met.
8.4.1.2
calculations provide all information
Codes Not
[PR672
with which compliance can be
ONot Observable
determined for Me electrical systems
ONot Applicable
and equipment and document where
exceptions are claimed Feeder
connectors sized In accordance with
approved plans and branch circuits
i i
zed for maximum drop of 3%.
Additional Commends/Assumptions:
RELEASED FOR CONSTRUCTION
Sablectto compliance with all regulations
of State and Local Codes
City of Cannel
DATE: 03/25/19
are) rr Low Impact (Tier 3)
Report date: 02/07/19
on MEP.cck Page 4of 12
Sectlon
#
Footing / Foundation Inspection
Complies? Comments/Assumptions
6 gwe.lD
6.4.3.8
1 Freeze protection and snow/ice
ucomplies 1 Requirement will be met.
[FO913
melting system sensors for future
1113ces Not
connection to controls.
,ONot Observable',
CJNot Applicable,
Additional Comments/Assumptions:
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Cannel
DATE: 03/25/19
at2) rr Low Impact (Tier 3)
Report date: 02/07/19
on MEP.cck Page 5of 12
Sectlon
#
Plumbing Rough -In Impection
Complies? Comments/Assumptions
6 Ree.ID
7.4.3
Service hot-water piping systems
Ocomplies Requirement will be met.
[PLI]r
insulated Where piping is installed in
ODces Not
or under slab, verification may need
1ONot Observable',
to occur during Foundation Inspection.
IONot Applicable
Additional Comments/Assumptions:
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Carmel
DATE: 03/25/19
ar2) rr Low Impact (Tier 3)
Report date: 02/07/19
on MEP.cck Page 6of 12
Section
Mechanical Rough -In
Plans Verified Field Verified
Complies?
comments/Assumptions
6 Req.ID
Inspection
Value Value
6.4.1.5
HVACd.
Efficiency:— Efficiency:_
[]Complies
See Me MecNnica15y4ems list
NomNAECA HVAC
NAECAMVAc
[]Wes Not
rorvaiues.
[MEl]2
[MEI]5
equipment
equipment labeletl as meeting
;[]Not Observable
90.1.
;ONM Applicable
,
6.4.3.4.1
Stair and elevator shaft vents
OComplies
Requirement will be met.
[ME3]3
have motorized dampers that
[]goes Not
automatically close.
[]Not Observable
ONot Applicable
6.4.3.4.2,
Outdoor air and exhaust systems
[]Complies
Requirement will be met.
6.4.3.4.3,
have motorized dampers that
I]Does Not
6.4.3.4.4
automatically shut when not in
[]Not Observable'
[ME4]°
use and meet maximum leakage
[]Not Applicable
Irates. Check gravity dampen
i
where allowed.
6.4.3.4.5
Ventilation fans hphave
[]Complies
Requirement will be met.
[ME5]3
automatic controls to shut off fan
Dpiles NOl
when not required.
[]Not Observable
'i
[]Not Applicable
'�i
6.4.3.9
Demand control ventilation
[]Complies
Requirement will be met.
[ME673
provided for spaces R2 and
[]Does Not
>40 people/1000 ft2 occupant
[]Not Observable'i
density and served by systems
[]Not Applicable
with air side economizer, auto
modulating outside air damper
control, or design airflow >3,000
Cho
6.4.4.1.1
Insulation exposed to weather
[]Complies
Requirement will be met.
[ME7]3
protected from damage.
[]Does Not
Insulation outside of the
[]Not Observable
',
conditioned space and associated
[]Not Applicable
with cooling systems is vapor
retardant.
6.4.4.1.2
HVAC ducts and plenums
1 R- R-
;[]Complies
Requirement will be met.
[ME8]2
insulated
:[]Does Not
[]Not Observable
[]Not Applicable
6.4.4.1.3
HVAC piping insulation thickness.)
in. in.
[]Complies
Requirement will be met.
[ME9)s
[]Does Not
[]Not Observable
[]Not Applicable
6.4.4.2.1
Ducts and plenums sealed base tl
[]complies
Requirement will be met.
[ME10]2
on static pressure and location.
[]Does Not
❑Not Observable
[]Not Applicable,
Dudworequire
DuctworBjUireSair >akaFi.g waterJ
[]Complies
Requirement will be me[.
[M.4.2.
[ME12.2
column air leakage
[]Does Not
testing.
[]Not Observable
[]Not Applicable
i
6.5.2.3
Dehumidification controls
[]Complies
I Requirement will be met.
[ME39]3
provided to prevent reheating,
[]Does Not
retooling, mixing of hot and cold
V
[]Not Observable
'i
airstreams or concurrent heating
...w ..e e.m...e
[]Not Applicable
OR FAWII wirrmu
„rn�,�FD
L
ANP
Subject to compliance with all regulations
of State and Local Codes
City of Cartel
DATE: 03/25/19
ar 2) rr Low Impact (Tier 3)
Report date: 02/07/19
on MEP.cck Page 2of 12
Section
Mechanical Rough -In
Plans Verified
Field Verified
Oomplies?
CommeMs3Assumptions
6 Req.ID
Inspection
Value
Value
6.5.4.1
1 HVAC pumping systems hp
OComplies
Requirement will be met.
[ME2513
designed for variable Fluid Flow.
0Wes Not
(
,(]Not Observable
[]Not Applicable
6.5.6.1
Exhaust air energy recovery on
[]Complies
Exception: Systems
[ME3o13
:systems>=5,000 cfm and 20%
[]Wes Not
exhausting toxic, Flammable,
!of design supply air.
ONO( Observable
Paint or corrosive fumes or
ONot Applicable
tlust.
6.5.7.1
kitchen hoods>5,000 cfm have
OComplies
Requirement will be met.
[ME32]2
make up alr>=50%of exhaust
ODges Not
air volume.
ONot Observable
ONot Applicable
6.5.7.2
Fume hoods exhaust systems
OComplies
Exception: Requirement
[ME33]'
>=15,000 cfm have VAV hood
Oboes Not
does not apply.
exhaust and supply systems,
ONot Observable
direct make-up air or heat
ONot Applicable
recovery.
6.5.8.1
Unenclosed spaces Mat are
OComplies
Requirement will be met.
[ME34]3
heated use only radiant heat.
Oboes Net
ONct Observable
ONot Applicable
11
6.5.9
Hot gas bypass limited to:<-240
OCorrplies
Requirement will be met.
[ME3573
1 kBfu/h - 50%>240 kBfu/h - 25%
ODaes Not
ONot Observable
ONot Applicable
,
7.4.2
Service water heating equipment
OComplies
[ME 36)T
meets ef0clency requirements.
[]goes Not
[]Not Observable
[]Not Applicable,
Additional Commen s/Assumptions:
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Centel
DATE: 03/25/19
are) rrLow Impact (Tier 3)
Report date: 02/07/19
on MEP.cck Page 8of 12
Section
#
Rough -In Electrical Inspection
Complies?
Comments/Assumptions
6 An"AD
9.4.1.1
Automatic controlsto shutoff all []Complies
Requirement will be met.
[EL112
building lighting installed in buildings []Does Not
>5,000 ft2. ❑Not Observable
[]Not Applicable
9.4.1.2
Independent lighting controls installed []Complies
Requirement will be met.
C012
per approved lighting plans and all []Does Not
vival controls readily accessible and
[]Not Observable
sible to occupants.
[]Not Applicable
9.4.1.4
Separate lighting control devices for []Complies
I Requirement will be met.
IEL411
specific uses lnsta lied per approved ODces Not
lighting plans. []Not Observable
[]Not Applicable
9.4.2
Ballasted one and three lamp fixtures OComplies
Requirement will be met.
[El-513
with>30 W/lamp have two lamp []Does Not
tandem wired ballasts when >=2 []Not Observable
fixtures in same space on same
control. []Not Applicable
9.4.3
Exit signs do not exceed 5 watts per []Complies
Requirement will be met.
[EL61'
face. []Does Not
❑Not Observable
[]Not Applicable
9.6.2
Additional interior lighting power OComplies
Requirement will be met.
[EL8]3
allowed for special functions per the []Dces Not
approved lighting plans and is ''[]Not
automatically controlled and Observable
ONot Applicable
sepa rated from general lighting.
10.4.1
Electric motors meet requirements ',[]Complies
Requirement will be met.
[EL912
where applicable. 'i[]Dces Not
',[]Not Observable
ONot Applicable
Additional Comments/Assumptions:
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Centel
DATE: 03/25/19
ar2) rr Low Impact (Tier 3)
Report date: 02/07/19
on MEP.cck Page 9of 12
8ectlon
# Final Inspection Complies? Comments/Aswmptions
& Req.ID
6.4.3.1.1 Heating and cooling to each zone is IDComplies I Requirement will be met.
[F12]' controlled by a thermostat control. 11113ces Not
lONot Observable
IONot Applicable
6.4.3.1.2, Thermostatic controls have a 5°F IDComplies Requirement will be met.
6.4.3.2, deadband. jODces Not
6.4.3.3, IDNot Observable
6.4.3.3.1,
6.4.3.3.2 1ONot Applicable
[F13]3
6.4.3.7 When humidification and DComplies Requirement will be met.
[F1613 dehumidification are provided to a ODces Not
zone, simultaneous operation is ONot Observable
prohibited ONot Applicable
6.7.2.1 Furnished HVAC as -built drawings OComplles Requirement will be met.
[F1773 submitted within 90 days of system DDces Not
acceptance. ONot Observable
ONot Applicable
6.7.2.2 Furnished 0&M manuals for HVAC OComplies Requirement will be met.
[FI81' systems within 90 days of system DDces Not
acceptance.
DNot Observable
ONot Applicable
6.7.2.3 An air and/or hydronic system DComplies Requirement will be met.
[Figp balancing report is provided for HVAC 'DDces Not
systems serving zones >5,000 ft2 of ONot Observable
conditioned area.
DNot Applicable
6.7.2.4 HVAC control systems have been OComplles Requirement will be met.
[FI10]1 tested to ensure proper operation, DDces Not
calibration and adjustment of controls. ONot Observable
ONot Applicable
7.4.4.3 Public lavatory faucet water OComplies Requirement will be met.
[Fill]' temperature <=130°F. DDces Not
DNot Observable
Duct Applicable
8.7.1 Furnished as -built drawings for DComplies Requirement will be met.
[FI3613 electric power systems within 30 days IDDces Not
of system acceptance. ONot Observable
DNot Applicable
8.7.2 Furnished O&M instructions for OComplles Requirement will be met.
[F117]3 systems and equipment to the DDces Not
building owner or designated DNot Observable
representative.
ONo[Applicable
9.2.2.3 Interior installed lamp and fixture DComplies See the lntMm Lightln9 fl)ture scheoue Air values.
[FI38]' lighting power is consistent with what ODces Not
is shown on the approved lighting i
ONo[Observable',
plans, demonstrating proposed watts I
!are less than or equal to allowed
DNot Applicable
wa
6.4.3.2 Temperature controls have setpoint IDComplies l Requirement will be met.
RELEASED FOR CONSTRUCTION
Askk Subject to compliance with all regulations
of State and Local Codes
City of Camel at 2) rr Low Impact (Tier 3)
Report date: 02/01/19
4m{VlD cu"vsw^^r� on MEP.cck Page 10 of 12
a DATE: \ 03/25/19
Sectlon
#
6 aeq.ID
Final Inspection Complies?
Comments/Assumptions
6.4.3.3.1
HVAC systems equipped with at least OComplies
Requirement will be no et.
[FI21]1
one automatic shutdown control j171Does Not
jONot Observable
IONot Applicable
6.4.3.3.2
Setback controls allow automatic JOComplies
Requirement will be met.
[FI22]1
restart and temporary operation as 11013ces Not
required for maintenance. jONot Observable
I,ONot Applicable
Additional Comments/Assumptions:
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Control
DATE: 03/25/19
ar2) rr low Impact (Tier 3)
Report date: 02/07/19
on MEP.cck Page 11 of 12
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
9 /�7 Report date: 02/07/19
4m{1lD on MEP.cck Page 12 of 12
DATE: \ 03/25/19