HomeMy WebLinkAboutE-2 ELECTRICAL PLANSPOWFR PLAN
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
�; Gqqdi
DATE: 03/25/19
Style: 1/8" = 1'-V
LIGHTING PLAN
L Scale: 1/8" - V-0"
Note'
E.C. well comply wdh the IBC in regards
to fire raged membrane penetrations.
Utilize means of fire rated junction boxes,
"putty pads", fire Hocking and offsetting.
General Notes:
A. At 120 volt, 20 amp circuits over 60In length shall be
#10 AWG, over 95'shall be #8, over 145'shall be #6.
B. Contractor shall coordinate with all other trades to avoid
conflicts of space.
C. Contractor shall coordinate the exacdocatlon of all
devices with all other trades prior to rough -in. Exact
location to be determined in the field.
D. Contractor shall coordinate with the mechanical and
at undoing contractors for exact locations of equipment
prior to rough -in.
E. Refer to sheet E-3 for details and symbols.
F. Refer to sheet E-3 electrical riser diagram.
G. Refer to sheet E-3 for electrical scheduled).
H. Shared neutrals shall not be permitted.
J. Note"H" cli as are not acceptable for junction box
supporting.
x. Switches shall be a maximum +48" A.F.F. to the top of
the device unless otherwise noted.
L. Receptades, telephone outlets, and television outlets
shall be a minimum of +18" A.F.F. to the bottom of the
device unless otherwise noted.
M. Where devices are installed in fire walls, the boxes shall
be rated and sealed for installation in a fire wall.
N. Provide HACR circuit breakers for all HVAC add
refrigeration equipmem.
P. Al home runs, exposed wiring in ceilings or interior walls,
and in Landlord demising walls shall be in conduit or
EMT. MC cable Is acceptable but must be installed In
neat workmanlike manner.
Q. No card of to be supported from the turd deck.
R. Al light fixtures marked EM(Emergency) shall be on
switched circuit and have an emergency battery pack.
Plan Notes:
1O Circuit EF-1 on roof to NS-35. Connect each for anloff
control by sensor'053'. Connect and provide separate
manual override timer switches behind desk, coordinate
exact location of switch and fan prior to rough In.
YO Circuit RTU-1 on turd to NS-(38,40,42). Install GFI HVAC
receptacle nearby(circuit W NS-18), coordinate exact
location of unit and receptacle prior to rough -in.
O3 Coordinate pourer routing with furniture prior to rough -in.
Coordinate ccnnection types and locations with owner
equipment and furniture prior to rough -in.
OLighting fixture provided by owner and Installed by EC
per specifications. Confirm fixture type and exact location
prior to rough -in.
O5 Install no higher than +1W above store from windows.
Soe Lin & Associates, LLC
4340 East West Highway
Suite 105
Bethesda, Maryland
20814 USA
301.986-9300
Fax.986-0500
Notes Consultants
Dwn By
SJW
Chkd By
SLH
Job No.
18122
Project
NAIL SALON
7245 EAST146th St
CARMEL, IN 46033
ZLIMCT REAL ESTATE MGMT.
Drawing Title
ELECTRICAL PLANS
a"S"�jEL L.n'moy�ti �
a 94- 1
_* PE10100876
"� S•T.N„IE OF �%
Sheet No.
E-2