HomeMy WebLinkAboutMEP-1 MEP UNDERGROUND PLANLBMH
50 J Floor at 0'0'
PVC coated shee
metal duct !
6x10ductfrot `
floor (See plans). '
��10'tlia
4 Under round Ductwork from Pedicure Chair
Not to Scale
12' do duct as close Ductwork to
to wall as possible ,ceiling.
10,
table
Floor at 0' 0'
:1:10-ductfrom
pedicure chairs
iiiiUnder Ductwork
Not to Scale
"1 I InrlarriInd Electrical Plan
RELEASED FOR CONSTRUCTION Scale: W= 1'-0"
Subject to Compliance with all regulations
of State and Local Codes
City of Camel
DATE: 03/25/19
Finished
Hub Drain Detail
Not to Scale
Underground HVAC Plan
2 Scale: 118" - V-0"
Min.
Plumbing Fixture Schedule
Mark
No.
Description
Pipe Connections fin)
Model Numbers
Acceptable Manufacturers
HW
CW
W
V
CO -A
FLOOR CLEAN OUT- Cast iron body, round scodated nickel
bronze top, bronze plug.
-
-
4
-
ZURN#ZN1400-aZ1-BP
J.R. SM ITH, JOSAM, M IFAB, WATTS
HD -A
HUB DRAIN - Deep seal p-trap with trap seal.
2
-
SURE SEAL#SS2009V
J.R. SMITH, ZURN
Underground Plumbing Plan
U Scale: VS" = T-or
General Notes:
1. These plans are diagrammatic in nature, and do not
represent every necessary offset and fitting. Contractor
shall install his work in a manner that will conform with
the structure. Contractor shall avoid obstructions,
preserve head roan and maintain maximum clearance
without additional cost to the owner.
2. Keep all ductwork, duct system and equipment openings
covered with adhesive duct protective wrap Ilke
Venture -rape 1512, until system start-up. This is to
prevent Intrusion of construction dirt and debris Into the
duct system, and HVAC equipment.
3. If any questions arise concerning the HVAC
requirements of these documents, please contact The
Engineering Collaborative at (317) 636-3941, prior to
bidding, fabrication or installation of equipment.
4. Sheet metal transitions by Sheet Metal Contractor.
5. All work shall comply win all national, state, local codes
and ordinances pertaining to the work in this project.
6. DO NOT USE CELLULAR CORE PVC.
Plan Notes:
E1 Double gang flush floor box for future quad receptacle.
E2 Double gang flush floor box win divider for future duplex
receplade and low voltage.
E3 9' conduit, turn vertical in wall. Provide pullwire.
8 Connect new waste line to nearest active waste line of
equal or larger size. Field verify exact size, direction of
flow, elevation, location, material and condition of
existing waste line; prior to start of work.
P2 Provide 3'W up to water closet.
5 Provide 2'W up.
Transition from 10' Oductto10x 10 duct, above
ceiling; and connect to Exhaust Fan on roof.
Soe Lin & Associates, LLC
4340 East West Highway
Suite 105
Bethesda, Maryland
20814 USA
301.986-9300
Fax.986-0500
Notes Consultants
Dwn By
AK/GMH/GJR
Chkd By
SLH
Job No.
18122
Project
NAIL SALON
7245 EAST146th St
CARMEL, IN 46033
ZLIMCT REAL ESTATE MGMT.
Drawing Title
MEP UNDERGROUND
PLAN
L.,"umua
@��'offv�
c"��''
Sheet No.
MEP-1