HomeMy WebLinkAboutMinutes BZA 02-25-19 • They agreed to provide Staff with a landscape plan and additional ROW with a 10' wide multi-use path
• They agreed not to park any of their automobiles on the sidewalk
IBoard Comments:
Sue: If approved tonight,what happens after one year? Angie: After a year,they would have to come back for another
UV or for an ADLS review. Sue: What's the harm for leaving the vacant lot as gravel? Angie: They want to pave it for
the customer's sake. Staff is fine with leaving it as gravel for one year. Sue: Would they defer installing the multi-use
path for a year? Angie: Yes. The City is planning to build a roundabout for this intersection in the future,so they are
dedicating the ROW.
Brad: Who is responsible for the maintenance of the alley located north of this property? Dave Coots: The City
probably inherited that. It is a dedicated alley. Angie: It was recently part of the annex and the City is now responsible
Leo: When is this roundabout going to be built? It is on the one year plan? Angie: No. It's currently not on the
thoroughfare plan so I do not know the time frame for it.
Jim: What's the difference between the one year and two year timeline allowance? Dave Coots: The petitioner would
prefer a two year plan. The owners have plans to expand their business and two years gives us more time to work out the
future development plans of this site. Jim: I agree that a time limit is needed. Leo: I would agree for five years,but if
the Petitioner is happy with two years, let's make it that.
On a Motion made by Leo and seconded by Jim to approve Docket No. 18120010 UV with the Condition of a two
(2)year time limit.
Approved 5-0
WITHDRAWN-(UV) Cohen Office.
i ! : • • • :. . - ! ! - .k
A. • • • • •'
.. 1
(V) Van Schaak Residence,Side Yard Setback.
The applicant seeks the following variance approval for a cantilevered fireplace with built-ins:
Docket No. 19010011 V PUD Ordinance Z-553-11,Section 6.1 Min.5-ft side yard building setback
required,3-ft requested. The site is located at 528 Terhune Ln. at Jackson's Grant, Section 5,Lot 274. It is
zoned Silvara PUD/Planned Unit Development.Filed by Matt Huffman of The Old Town Design Group LLC,on
behalf of Kenneth&Nancy Van Schaack,owners.
Petitioner: Justin Moffett,Old Town Design Group:
• It's an unfortunate situation that we are here,but hopefully we can find a solution that meets everyone's needs
• We designed the home for the Van Schaack's,and the cantilever fireplace is within the 5' side yard setback
• The fireplace total area is 7' wide,and the built in cabinets are 4' each,with a total width of 15-16'
• The built-in cabinetry are met to be flush with the fireplace, so it's purely a design detail
• We were required to submit our plans to the Architecture Review Committee of Jackson's Grant. Republic Land
Development approved these plans.
• We applied for building permits through Department of Community Services and they were approved
• Construction was started and it was then brought to our attention that this was not in compliance with the PUD or
the underlie zoning
• Presented rear, side, and front yard elevations
• Zoning allows up to 7' of a chimney/firebox to protrude in the side yard setback
• The problem is the cantilever area width is 15' 9"and the extra 4' per side is a common design feature
• We believe the additional 4' to each side does not create any hardships
3
Minutes Board of Zoning Appeals 2-25-19