Loading...
HomeMy WebLinkAboutCJ181033.0214DAILY SUMMARY REPORT Report Number:CJ181033.0214 Service Date:03/13/19 7770 W New York St Report Date:03/26/19 Indianapolis, IN 46214-2988 317-273-1690 Client Project Gibraltar Construction Corp West Park: The Groves Attn: Douglas Perry 3030 West 116th St. 2932 N Webster Ave Carmel, IN 46032 Indianapolis, IN 46219 Project Number: CJ181033 Services: As requested, a representative of Earth Exploration, Inc. was on-site to retrieve concrete specimens. Earth Exploration, Inc. Rep.: Lewis King Reported To:Bill with Gibraltar Construction Contractor: Report Distribution: (1) Gibraltar Construction Corp, Douglas Perry (1) City of Carmel IN, Mike Sheeks (1) Johnson Wilbur Adams, Inc., Michael Wilbur (1) Smith Group JJR, Jessie Fink Reviewed By:____________________________________ Jeremy Clem Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 FOUNDATION OBSERVATIONS All tests meet specifications See Foundation Observation Report for details Some tests do not meet specifications See Construction Observation Report All tests do not meet specifications None Performed IN-PLACE DENSITY TESTS All tests meet specifications See In-Place Density Test Report for details Some tests do not meet specifications Passing retests obtained All tests do not meet specifications None performed CONCRETE, GROUT, MORTAR SAMPLING/TESTS Tests performed:Slump Slump Entrained Air Temperature Unit Wt.Yield Number of specimens cast Total Quantity Yd3 Specimen Type:Cylinders Beams Motar Cubes Grout Prisms Other Pick Up None Performed ASPHALT SAMPLING/TESTS Tests performed:Nuclear Density Slump Slump Stability/Flow Number of Tests Total Quantity Tons Core Sampling Number of Cores Marshall Density Temperature None Performed Weather:Cloudy Low 30’s – Low 40’s See attached Daily Construction Observation Report. CONSTRUCTION OBSERVATION REPORT Report Number:CJ181033.0214 Service Date:03/13/19 7770 W New York St Report Date:03/26/19 Indianapolis, IN 46214-2988 317-273-1690 Client Project Gibraltar Construction Corp West Park: The Groves Attn: Douglas Perry 3030 West 116th St. 2932 N Webster Ave Carmel, IN 46032 Indianapolis, IN 46219 Project Number: CJ181033 Services: As requested, a representative of Earth Exploration, Inc. was on-site to retrieve concrete specimens. Earth Exploration, Inc. Rep.: Lewis King Reported To:Bill with Gibraltar Construction Contractor: Report Distribution: (1) Gibraltar Construction Corp, Douglas Perry (1) City of Carmel IN, Mike Sheeks (1) Johnson Wilbur Adams, Inc., Michael Wilbur (1) Smith Group JJR, Jessie Fink Reviewed By:____________________________________ Jeremy Clem Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 Weather: Cloudy Low 30’s – Low 40’s 1.Earth Exploration Inc., a Terracon Company (Earth), was on-site today at the request of Gibraltar Construction Corp to retrieve compressive strength test specimens cast yesterday, representing the east ½ of the drive entrance. Earth transported the specimens to our lab and logged them in for final curing in accordance with ASTM C31.