Loading...
HomeMy WebLinkAboutC5 Utility PlanSEA Group, Land Surveyors SEA Group, Land Surveyors SEA Group, Land Surveyors SEA Group, Land Surveyors SEA Group, Land Surveyors TOWN E MEADO W DRIV E UNIVERSITY COURT JASMINE DRIVETOWNE ROADSUTTON AVENUE 888 887 886 885 884 887 886 885 884 888 887 886 885 884 888 SEA Group,LandSurveyors Know what's below. before you dig.Call R N PROJECT NUMBER DRAWING NUMBER SHEET OF SCALE: DWN BY: CHKD. BY:REVISIONSDATE:619 N. PENNSYLVANIA STREETINDIANAPOLIS, INDIANA 46204Ph: +1.317.423.0690info@williamscreek.net WILLIAMS CREEKCONSULTINGa V3 CompanyLEGEND EXISTING SANITARY MANHOLE UTILITY PLAN C5.0 3 5PITTMAN PARTNERS11711 NORTH PENNSYLVANIA AVENUE, SUITE 260CARMEL, INDIANA, 46032THE PARKS AT TOWNE MEADOW116TH STREET & TOWNE ROADCARMEL, INDIANA, 4604418186 PLD JOR 1"=100' 06/22/2018 PROPOSED SANITARY MANHOLE EXISTING STORM STRUCTURE PROPOSED STORM STRUCTURE PROPOSED FIRE HYDRANT BUILDING SETBACK LINE/EASEMENT PROPOSED WATER LINE PROPOSED SIDEWALK/EDGE OF CONCRETE PROPOSED EDGE OF ASPHALT PROPOSED PROPERTY LINE/LOT LINE PROPOSED SANITARY MAIN PROPOSED STREET CENTERLINE EXISTING GAS LINE EXISTING CONTOUR EXISTING GAS EASEMENT EXISTING STORMWATER PIPE PROPOSED STORMWATER PIPE EXISTING GAS MARKER SURVEY MONUMENT SET SURVEY MARKER FOUND SURVEY BENCHMARK SPRINGHILL RUN LEGAL DRAIN EXTENTS RIGHT-OF-WAY PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR 888 890 EXISTING OVERHEAD POWER LINE EXISTING WETLAND BOUNDARY EXISTING EDGE OF PAVEMENT EXISTING COMMUNICATION LINE EXISTING SANITARY LINE EXISTING COMMUNICATION EQUIPMENT EXISTING UTILITY POLE EXISTING WATER STRUCTURES COMMON AREA #1 COMMON AREA #2 COMMON AREA #3 NORTHWEST BASIN BOTTOM: 884.00 10-YEAR: 885.87 100-YEAR: 887.43 SOUTHWEST BASIN BOTTOM: 884.00 10-YEAR: 885.87 100-YEAR: 887.43 SOUTHEAST BASIN BOTTOM: 884.00 10-YEAR: 885.87 100-YEAR: 887.43 EMERGENCY OVERFLOW ROUTETYPICAL SWALE CROSS SECTION PROPOSED LIGHTS TO BE MOUNTED TO HOMES AND ENTRY SIGN. NOTES FLOWTHROUGH BMPS WILL BE CONSTRUCTED IN THE BOTTOM OF EACH BASIN. PROPOSED SWALE TYPICAL LOT DRAINAGE 09/21/2018PRIMARY PLAT REVISIONS 1 03/25/19