Loading...
HomeMy WebLinkAboutBuilding Permit P2BUTLI?TNG PERMIT LNF032MATTON Carmol -Clay Town�2-iip Dapartxnant of CuzwnurxJ.-ty Dgvelopn-xcant CARMEL ZONING ORDINANCE Z-160, SECTION 29.4.2(3): THE BUILDING COMMIS- SIONER (DIRECTOR, DEPT. OF COMMUNITY DEVELOPMENT OR STAFF) SHALL APPROVE OR DENY THE IMPROVEMENT LOCATION PERMIT (BUILDING PERMIT) WITHIN FIVE (5) WORKING DAYS OF THE RECEIPT OF THE WRITTEN APPLICATION FORM AND ACCOMPANYING MATERIALS. THE IMPROVEMENT LOCATION PERMIT (BUILDING PERMIT) SHALL BE ISSUED WHEN THE PROPOSED STRUCTURE, IMPROVEMENT OR USE AND ITS LOCATION CONFORM IN ALL RESPECTS TO THIS ORDINANCE. The following must be received by the Department of Community Develop- ment before_any building or remodeling permit can be reviewed or issued by _staff: 1. A completed Improvement Location Permit (Building Permit) application. 2. Two (2) complete sets of construction plans. In compliance with the State Energy Code, must list R -values on walls, ceilings, etc. If a commercial construction, plans must be Cate total height of build - g on plans. 3. A copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton Western Utilities, whichever applies), or septic permit (Hamilton County Health Department). 4. One (1) copy of plot plan from subdivision development plan 5. 'Three (3) copies of a site plan or plot plan shooing the ,l,..-.,..,, REQUIRED information (can be obtained from the L1.111Vniuy z_-_-_ landowner or developer): --Lot drawn to scale -- all dimensions --Scale and north arrow --All roads, alleys, rights-of-way, etc. �,�'`' --All other utilities and drainage rights -of ,w6�"`' �tl�l',99so tent --Any applicable flood plain area , .- ;'� i `` i c� "� 0" --Building pad elevation and lot corn r-%gi�v4tions`_+ - --All accessorybuildings -- existi �. , y �9:� �o'Y , �bpp4ad` glG� . --All sidewalks and driveways --Sewer and water lines, septics system bpd`-wa,j?`�l�dyaE'i�i��`33 --Drainage flow arrows --All drainage swales and subsurface; Aadi' *`itieV (\,mention/ detention areas, etc. )� \�.�kA --Dimensional cross sections of 4A:� drainmliAwales --Sump pump (sump pump pits) shdwing discharge locations --Geothermal heat pump discharge locations Drainage Swales: All required drainage swales must be shown on the plot plan and constructed in all subdivisions prior to the Department of Community Development performing a final inspec- tion of any structure per plans on file or per the following: Constructed swales shall be a minimum of 1'6" deep with side slopes of not less than 4 to 1. If this information is not submitted, it will extend the time it takes to get an approved building permit. I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURATELY ON THE ATTACHED PLOT OR SITE PLAN AS SUBMITTED WITH A BUILDING PERMIT APPLICATION TO THE CARMEL-CLAY DEPARTMENT OF COMMUNITY DEVELOPMENT. SIGNATURE ADDRESS: NAME OF P VALID STATE PLUMBING LICENSE NUMBER: r U ) D / 0 j 11