Loading...
HomeMy WebLinkAboutE50-1W D A/S KPDKPDKPDKPDWP W D TV+44" +44"WP+44" J W D SD CO SD SD CO WAP DCSKPCO HD D DCSMDMDWS CENTER S PSTV2 S LEFTSPSS RIGHTS PSSLRSPSSLRSPSS LR S LR OHD WS WDB VISTADSC ELEV AR A2 A2 A2 A2 A2 A2 A2 A2 A2 A2 A2 A2 A1 A1 A2 A1 A1A1 A2 A1A1 A1 A1 A1 A1 E E E DF1 B2 B2 LIFT 106 ENTRY HALL 101 GARAGE 107 MECH 104 LAUNDRY 105 WIC 103 BEDROOM 1 102 1 APD APD APD AS 39 X 7 PROVIDE LIFT HOISTWAY LIGHT SWITCH. VERIFY EXACT LOCATION WITH LIFT SUPPLIER. LOT50 GARAGE 107 MECH 104 LAUNDRY 105 WIC 103 LIFT 106 ENTRY HALL 101 BEDROOM 1 102 1 LV PANEL 20 DATA RACK TESLA OUTLET LOCATION. CONFIRM EXACT TYPE, CIRCUIT AND LOCATION WITH CUSTOM LIVING PRIOR TO ROUGH-IN. 15 18 19 GARAGE 107 2423 2627 F20 F30 F30 DWH-1 DWS-1 28 T LIFT+44" 39 SWITCH FOR FURNACE POWER CIRCUIT F-1-50 1 31 32 32 BEDROOM 1 102 LTG CONTROL CAM-D/I GARAGE 107 MECH 104 WIC 103 LAUNDRY 105 ENTRY HALL 101 LIFT 106 18 35 36 NOTES: 1. CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THE LIGHTING FIXTURES, LIGHTING CONTROL, ALL OTHER LIGHTING REQUIREMENTS, LOW VOLTAGE EQUIPMENT, LOW VOLTAGE DEVICES, WIRING AND ALL OTHER LOW VOLTAGE REQUIREMENTS WITH PREIMIER AND CUSTOM LIVING PRIOR TO INSTALLATION. CONTRACTOR SHALL INCLUDE ALL MATERIAL AND LABOR NECESSARY TO COMPLETE INSTALLATION IN ACCORDANCE WITH REQUIREMENTS WHETHER THEY ARE SHOWN OR NOT SHOWN ON THE DRAWINGS. THE REQUIREMENTS SHALL TAKE PRECEDENCE OVER THE DRAWINGS. 2. ALL ELECTRICAL ROUGH-INS SHALL BE INSTALLED PRIOR TO ANY WIRE INSTALLATION FOR OWNER WALK THROUGH AND SIGN OFF. PREMIER LUXURY ELECTRONIC LIFESTYLES JASON BARTH OFFICE: 317.281.7451 JASON.B@PREMIER-GROUP.COM CUSTOM LIVING TOM LAZZARA OFFICE: 317.289.5990 TOM@CUSTOMLIVINGUSA.COM NOTFOR CONSTRUCTIONARCHITECT BLACKLINE 1 N MERIDIAN ST, SUITE 400 INDIANAPOLIS, INDIANA 46204 BLACKLINESTUDIO.NET 317.803.790 M.E.P. GENESIS ENGINEERING GROUP 91 SOUTH MAIN STREET, SUITE 200 ZIONSVILLE, IN 46077 GENESIS-ENGINEERING.COM 317.927.8307 STRUCTURAL SCHWARZ ENGINEERING GROUP WWW.SCHWARZINC.COM 317.850.5133 - - ALL INFORMATION CONTAINED IN THIS DOCUMENT IS CONSIDERED TO BE BOTH CONFIDENTIAL AND PROPRIETARY INTELLECTUAL PROPERTY OF BLACKLINE STUDIO AND SHALL NOT BE COPIED, REPRODUCED, DISTRIBUTED OR ASSIGNED TO A THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF BLACKLINE STUDIO. UNAUTHORIZED USE OF THESE DOCUMENTS IS NOT PERMITTED. CERTIFICATION: CHECKED: DRAWN: C:\Users\jwalke\Documents\Custom Living Monon on Main Town Homes GEG R18_jwalke@genesis-engineering.com.rvt11/21/2018 8:51:55 AM E50-1COPYRIGHT 2018 ELECTRICAL FIRST FLOOR PLANSMonon & Main Brownstones Monon & Main St., Carmel INJAWJAW CDs - PERMIT SET 7/24/2018 Lot 50 -BOYD RESIDENCE 1/4" = 1'-0"1 FIRST FLOOR LIGHTING PLAN - LOT 50 1/4" = 1'-0"2 FIRST FLOOR POWER PLAN - LOT 50 1/4" = 1'-0"3 FIRST FLOOR SYSTEMS PLAN -LOT 50 PLAN NOTES (NOT ALL NOTES MAY BE USED ON THIS SHEET) 1 DO NOT ROUTE ANY WIRING, PIPING, DUCTWORK, ETC., THROUGH LIFT SHAFT. 2 INSTALL LIGHT FIXTURE ABOVE VANITY MIRROR AT HEIGHT DETERMINED BY CUSTOM LIVING. 3 SURFACE MOUNT / SUSPEND LIGHT FIXTURE TO HEIGHT DETERMINED BY CUSTOM LIVING. 4 LIGHT FIXTURE(S) INSTALLED IN CASEWORK. COORDINATE LOCATION WITH CUSTOM LIVING PRIOR TO INSTALLATION. 5 INSTALL CEILING FAN CENTERED IN CEILING SPACE OF ROOM. PROVIDE U.L. LISTED CEILING FAN OUTLET KIT RATED FOR FANS UP TO 70 POUNDS. 6 CENTER LIGHT FIXTURE WITHIN STAIRCASE CEILING SPACE. 7 LIGHT FIXTURE PROVIDED IN CORE AND SHELL PACKAGE. 8 INSTALL LIGHT FIXTURE AT HEIGHT DETERMINED BY CUSTOM LIVING. 9 CONNECT ALL LIGHTING ON THIS FLOOR TO A DEDICATED 120V, 20A, 1P CIRCUIT, UNLESS OTHERWISE NOTED.. 10 DEVICE(S) INSTALLED IN CASEWORK. COORDINATE LOCATION WITH CUSTOM LIVING PRIOR TO INSTALLATION. 11 NEMA 14-50R RECEPTACLE FOR RANGE. RECEPTACLE TO BE FLUSH MOUNTED OR OTHERWISE AS REQUIRED TO ALLOW BACK OF RANGE TO BE PLACED FLUSH AGAINST WALL BEHIND THE RANGE. INSTALL RANGE RECEPTACLE IN LOCATION AND ORIENTATION AS REQUIRED BY AND IN ACCORDANCE WITH THE SUPPLIED RANGE MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONTRACTOR SHALL VERIFY RECEPTACLE CONFIGURATION, CIRCUIT SIZE, AND MOUNTING HEIGHT WITH DRYER MANUFACTURER PRIOR TO INSTALLATION. 12 RECEPTACLE / CIRCUIT CONNECTION TO HOOD. VERIFY EXACT LOCATION WITH CUSTOM LIVING PRIOR TO INSTALLATION. PROVIDE DEDICATED 120V,20A,1P CIRCUIT. 13 RECEPTACLE / CIRCUIT CONNECTION TO DISHWASHER. VERIFY EXACT LOCATION WITH CUSTOM LIVING PRIOR TO INSTALLATION. PROVIDE DEDICATED 120V,20A,1P CIRCUIT. 14 GARBAGE DISPOSAL. CONFIRM IF SWITCH IS TO BE INSTALLED OVER COUNTERTOP AT +2" ABOVE BACKSPLASH TO BOTTOM OF DEVICE OR AIR SWITCH IS TO BE USED. COORDINATE EXACT REQUIREMENTS WITH CUSTOM LIVING PRIOR TO INSTALLATION. PROVIDE DEDICATED 120V,20A,1P CIRCUIT. 15 PROVIDE THE FOLLOWING FOR LOW VOLTAGE EQUIPMENT: (1) 120V,20A,1P CIRCUIT FOR ALARM PANEL. (2) 120V,20A,1P CIRCUITS AT EQUIPMENT RACK. (1) 120V,20A,1P CIRCUIT FOR LOW VOLTAGE PANEL. CONFIRM ALL QUANTITIES AND LOCATIONS WITH OWNER PRIOR TO ROUGH-IN. 16 RECEPTACLE FOR REFRIGERATOR / FREEZER. PROVIDE DEDICATED 120V,20A,1P CIRCUIT. 17 RECEPTACLE / CIRCUIT CONNECTION TO MICROWAVE. VERIFY EXACT LOCATION WTIH CUSTOM LIVING PRIOR TO INSTALLATION. PROVIDE DEDICATED 120V,20A,1P CIRCUIT. 18 RECEPTACLE / TELECOM FOR WALL MOUNTED TELEVISION INSTALLED INSIDE RECESSED FLAT PANEL DISPLAY BOX. COORDINATE EXACT LOCATION AND MOUNTING HEIGHT WITH CUSTOM LIVING. CIRCUIT SHALL BE SEPARATE FROM MECHANICALS AND APPLIANCES. 19 FLUSH MOUNTED ELECTRICAL PANEL. INSTALLATION SHALL MAINTAIN ANY FIRE RATING OF WALL. REFER TO ELECTRICAL RISER DIAGRAM FOR ADDITIONAL INFORMATION. 20 RECEPTACLE IN CEILING FOR GARAGE DOOR OPENER. OPENER AND ASSOCIATED DEVICES PROVIDED BY OTHERS. PROVIDE DEDICATED 120V,20A,1P CIRCUIT. 21 EXHAUST FAN. VERY EXACT LOCATION WITH CUSTOM LIVING PRIOR TO INSTALLATION. CONNECT TO 120V,20A,1P GFCI PROTECTED CIRCUIT. 22 2P-60A, 240V NEMA 3R FUSIBLE DISCONNECT SWITCH. FUSE THE DISCONNECT SWITCH PER EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. 23 RECEPTACLE FOR WASHER. PROVIDE DEDICATED 120V,20A,1P CIRCUIT. 24 NEMA 14-30R RECEPTACLE FOR CLOTHES DRYER. CONTRACTOR SHALL VERIFY RECEPTACLE CONFIGURATION, CIRCUIT SIZE, AND MOUNTING HEIGHT WITH DRYER MANUFACTURER PRIOR TO INSTALLATION. 25 BATHROOM RECEPTACLE. CONFIRM EXACT LOCATION WITH CUSTOM LIVING PRIOR TO ROUGH-IN. PROVIDE DEDICATED 120V,20A,1P CIRCUIT. 26 2P-30A, 240V FUSIBLE DISCONNECT FUSED PER LIFT MANUFACTURER'S RECOMMENDATIONS. DISCONNECT SHALL BE LOCKABLE WITH INTERLOCKING COVER AND AUXILIARY CONTACT. PROVIDE CONNECTION TO LIFT EQUIPMENT AS REQUIRED. COORDINATE EQUIPMENT LOCATION WITH LIFT SUPPLIER. CONNECT TO SHUNT TRIP BREAKER IN UNIT PANEL. 27 2P-30A, 240V FUSIBLE DISCONNECT FUSED PER LIFT MANUFACTURER'S RECOMMENDATIONS. PROVIDE CONNECTION TO LIFT LIGHTING AND CONTROL AS REQUIRED. COORDINATE EQUIPMENT LOCATION WITH LIFT SUPPLIER. 28 WATER HEATER. PROVIDE DEDICATED 120V,20A,1P CIRCUIT. PROVIDE TOGGLE SWITCH DISCONNECT. 29 SUMP PUMP. PROVIDE (2) DEDICATED 120V,20A,1P CIRCUITS TO A SPLIT WIRE RECEPTACLE. PROVIDE 2-POLE TOGGLE SWITCH DISCONNECT. 31 SMOKE DETECTOR SHALL BE STAND-ALONE PHOTOELECTRIC TYPE WITH 120V WITH BATTERY BACKUP. DETECTORS WITHIN EACH UNIT SHALL BE INTERCONNECTED TOGETHER SO THAT ALL DETECTORS ALARM IN THE UNIT. 32 SMOKE DETECTOR SHALL BE COMBINATION STAND-ALONE COMBINATION PHOTOELECTRIC AND CARBON MONOXIDE TYPE WITH 120V WITH BATTERY BACKUP. DETECTORS WITHIN EACH UNIT SHALL BE INTERCONNECTED TOGETHER SO THAT ALL DETECTORS ALARM IN THE UNIT. 33 HEAT DETECTOR INSTALLED AT TOP OF LIFT SHAFT. COORDINATE LOCATION WITH LIFT SUPPLIER. 34 SMOKE DETECTOR INSTALLED AT TOP OF LIFT SHAFT. COORDINATE LOCATION WITH LIFT SUPPLIER. 35 TELEPHONE CONNECTION TO ELEVATOR CONTROLLER. PROVIDE (2) CAT5E CABLES IN 1" CONDUIT FROM CONTROLLER TO UNIT LOW VOLTAGE PANEL. 36 PROVIDE FIRE ALARM ADDRESSABLE RELAY FOR LIFT. RELAY SHALL SHUNT-TRIP LIFT CIRCUIT BREAKER TO SHUT DOWN LIFT PRIOR TO SPRINKLER SYSTEM RELEASE. INTERLOCK LIFT WITH FIRE ALARM SYSTEM AS REQUIRED. PROVIDE CONTROL WIRING IN CONDUITS AS REQUIRED 37 HALF-SWITCHED RECEPTACLE. SWITCHED HAVE CONTROLLED BY ELECTRONIC EQUIPMENT PROVIDED UNDER PREMIER SYSTEM. VERIFY CONTROL AND WIRING WITH PREMIER ELECTRONIC LIFESTYLES. 38 CONNECT ALL EXTERIOR ROOF DECK LIGHTING FIXTURES TO DEDICATED GFCI-PROTECTED 120V/20A/1P CIRCUIT. 39 PROVIDE FUSIBLE TOGGLE SWITCH FOR FURNACE POWER CIRCUIT. CONNECT CIRCUIT TO FURNACE THROUGH FUSED SWITCH. FUSE THE SWITCH AS RECOMMENDED BY FURNACE MANUFACTURER'S INSTALLATION INSTRUCTIONS. COORDINATE LOCATION OF SWITCH WITH MECHANICAL CONTRACTOR AND FURNACE INSTALLATION INSTRUCTIONS. # REVISION Date Monon and Main Brownstone Interior Remodel – Units 90, 60,70,50 1/11/2019 03/26/19 Mike Sheeks