HomeMy WebLinkAboutM50-1W D REF.DWVENT HOOD
65
A
B
GARAGE
LAUNDRY
WIC
LIFT
ENTRY HALL
BEDROOM 1
14"x6" 6"ø
6"ø 8"ø14"x4"
14"x12"
12"x4" 14"x10"
14"x6" RG2
4"ø
F-1-50
SR1- 50
SR1- 85
SR1- 115
6"ø 6"ø
T
6"ø
6"ø
7 8 11
2 2
12
6
2
4
2
F-1-50
65
A
B
LIVING
DINING
LIFT
BATH
KITCHEN
PANTRY
FSR1- 100
FSR1- 100
FSR1- 75
FSR1- 75
T
6"ø
9
10
FSR1- 100
EG1- 30
4"ø
8
4 2
8"ø8"ø
10"x4" SUPPLY UP
4"Ø SUPPLY UP
8
4"ø NOTFOR CONSTRUCTIONARCHITECT
BLACKLINE
1 N MERIDIAN ST, SUITE 400
INDIANAPOLIS, INDIANA 46204
BLACKLINESTUDIO.NET
317.803.790
M.E.P.
GENESIS ENGINEERING GROUP
91 SOUTH MAIN STREET, SUITE 200
ZIONSVILLE, IN 46077
GENESIS-ENGINEERING.COM
317.927.8307
STRUCTURAL
SCHWARZ ENGINEERING GROUP
WWW.SCHWARZINC.COM
317.850.5133
-
-
ALL INFORMATION CONTAINED IN THIS DOCUMENT IS
CONSIDERED TO BE BOTH CONFIDENTIAL AND
PROPRIETARY INTELLECTUAL PROPERTY OF BLACKLINE
STUDIO AND SHALL NOT BE COPIED, REPRODUCED,
DISTRIBUTED OR ASSIGNED TO A THIRD PARTY WITHOUT
PRIOR WRITTEN CONSENT OF BLACKLINE STUDIO.
UNAUTHORIZED USE OF THESE DOCUMENTS IS NOT
PERMITTED.
CERTIFICATION:
CHECKED:
DRAWN: C:\Users\jwalke\Documents\Custom Living Monon on Main Town Homes GEG R18_jwalke@genesis-engineering.com.rvt1/11/2019 9:34:19 AM M50-1COPYRIGHT 2018 MECHANICAL FIRST AND SECOND FLOOR PLANSMonon & Main Brownstones
Monon & Main St., Carmel INChecker
Author
Monon and Main Brownstone
Interior Remodel –Units 90,
60,70,50
1/11/2019
Lot 50 -BOYD RESIDENCE
1/4" = 1'-0"1 FIRST FLOOR MECHANICAL PLAN -LOT 50
1/4" = 1'-0"2 SECOND FLOOR MECHANICAL PLAN -LOT 50
PLAN NOTES
(ALL NOTES MAY NOT BE USED ON THIS SHEET)
1 GAS FLUE & COMBUSTION AIR UP.
2 12"x4" UP TO SUPPLY REGISTER IN FLOOR ABOVE.
3 12"x4" UP TO TOE KICK SUPPLY REGISTER (BY OTHERS) IN CABINET ABOVE. COORDINATE LOCATION WITH
FURNITURE PLAN.
4 12"x6" DUCT UP TO SUPPLY REGISTER IN FLOOR ABOVE.
5 12"x4" SUPPLY FROM BELOW TO TOE KICK SUPPLY REGISTER (BY OTHERS) IN CABINET ON THIS FLOOR.
COORDINATE LOCATION WITH FURNITURE PLAN.
6 4'Ø EXHAUST DOWN.
7 GAS FLUE & COMBUSTION AIR INTAKE THROUGH WALL. TERMINATE WITH CONCENTRIC VENT KIT.
8 4"Ø EXHAUST UP.
9 KITCHEN HOOD EXHAUST THROUGH WALL. TERMINATE WITH EXHAUST LOUVER SIZED FOR MINIMUM 700 FT/MIN
THROUGH OPENING.
10 KITCHEN VENT HOOD BY OTHERS. DUCT CONNECTION BY MC. DUCT SHALL BE APPROPRIATE FOR
GREASE-LADEN VAPORS.
11 4"Ø DRYER VENT THROUGH WALL. TERMINATE WITH WALL CAP.
12 4"Ø DRYER VENT DOWN TO DRYER.
13 GAS FLUE & COMBUSTION AIR INTAKE UP THROUGH ROOF. TERMINATE WITH CONCENTRIC VENT KIT.
15 FIREPLACE VENT DUCT DOWN. VERIFY DUCT CONNECTION SIZE AND LOCATION WITH MANUFACTURER.
16 FIREPLACE VENT THROUGH WALL. TERMINATE WITH WALL CAP.
17 GAS FLUE AND COMBUSTION AIR DOWN.
18 4"Ø EXHAUST DUCT FROM THIRD FLOOR, TRANSITION TO 6"x3", UP IN WALL TO EXHAUST GRILLE.
19 4"Ø DRYER VENT DOWN TO SECOND FLOOR CEILING SPACE BELOW.
20 4"Ø DRYER VENT DUCT UP TO DRYER ON THIRD FLOOR.
F-1-50
# REVISION Date
03/26/19
Mike Sheeks