HomeMy WebLinkAboutC2.0.Site Plan15'
F.F.E. = 755.70
(NAVD 88 DATUM)
Equality Blvd.Community DriveN 00°00'00" W 234.67'N 90°00'00" W 376.00'S 03°04'59" E 243.00'N 90°00'00" E 214.95'
A/C A/C
25'5'36' 25' 3'
24'
91'
29'
18'
30'
R10'
R5'
9'
9'
9'
25'
R8'
R5'
R25'R20'
9'
R5'154.3'PROPOSED GYM &
LEARNING CENTER
13,000± S.F.
F.F.E. = 755.70
(NAVD 88 DATUM)
F.F.E. = 755.70
(NAVD 88 DATUM)
24'
8'
32.7'
23'
N 86°54'50" E 148.20'
5'
EXISTING SCHOOL
BUILDING
EXISTING UTILITYESMT. TO BE VACATEDEXISTING DRAINAGEESMT. TO BE VACATED8'
53.8' 30' DRAINAGE ESMT.PERVIOUS PAVERS ARE TO BE PROTECTED DURING
CONSTRUCTION (NO CONSTRUCTION TRAFFIC)EXISTING PLAYGROUND FENCE
14
5
EXISTING STORM WATER
SWALE / DETENTION EXISTING GAS MAIN29
12
7
EXISTING PARKING SPACES6
EXISTING PLAYGROUND
3
4
CB
EXISTING SCHOOL
BUILDING
K
NO PARKING
FIRE LANE
7 NEW 5' SIDEWALKCB
CB
CB CB CB
DCCBCB
DC
CB
CB
CB
DC
CB CBCB
DC DC
DC DC DC DC
DC DC
D D H D D D D
C
C
C
C
C
C
C
C
C C C
DD
D
D
D
D
D
T
A A
A
A
A
A
A
A
A
A A A A A A
A
J
F
G
D
D
D
D
D
K
C D
REFER TO
ARCHITECTURAL PLANS
FOR BLDG. DIMENSIONS
EXISTING BICYCLE RACKS
(QTY. 2, 4 SPACES)
PER CARMEL UDO 5.29 PK-02.8
A
5'
D
D
6'
6.3'
D
8'
8' 5'
5'5'
8' 8'
D D
30'
3
3
3
3
3
PROJECT NUMBER
DRAWING NUMBER
SHEET OF
SCALE:
DATE:
DWN BY:
CHKD. BY:CIVIL SITE GROUP, INC.
GROUP, INC.PROF
E
SS
ION A L E NG INEERIND
IA NA
PE10910647
STATE OF
-o NREG I STER
E
DBR IA N S CR
O
SSTPS.007
C2.0NOBLESVILLE, INDIANA 4606015575 STONY CREEK WAYTHE PLAY SCHOOL at LEGACY, INC.SITE PLANTHE PLAY SCHOOL at LEGACY SPORT COURT14454 COMMUNITY DRIVECARMEL, INDIANA 46033REVISION RECORD
06/22/2018
CONTRACTOR NOTE
NO EARTH DISTURBING ACTIVITY MAY COMMENCE
WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT.
DEVELOPMENT SUMMARY
PROPOSED BUILDING = 13,000 G.S.F.±
TOTAL SITE AREA = 2.0 AC+/-
CURRENT ZONING = PUD
GREENSPACE AREA = 29% (25,691 / 87,345)
TOTAL DISTURBED AREA = 72,311 SF ± = 1.7 Ac +/-
ANTICIPATED CONSTRUCTION START/COMPLETION DATE
NOVEMBER, 2018 / JULY, 2019
TOTAL PARKING SPACES = 87 (INCLUDES STREET SPACES)
TOTAL PARKING SPACES REQ'D = 59
(1 SPACE/EMPLOYEE + 1 SPACE/6 STUDENTS)
TOPOGRAPHIC & BOUNDARY NOTE BUILDING NOTE
REFER TO ARCHITECTURAL &
FOUNDATION PLANS FOR ALL
BUILDING DIMENSIONS.
SITE LAYOUT NOTES
UTILITY LOCATE NOTE
LEGEND:
PLAN NOTES:
A
H
T
D
F
G
J
C
DW
CB
DC
HANDICAP RAMP NOTE
ALL HANDICAP RAMPS CONSTRUCTED
WITHIN THE PUBLIC RIGHT-OF-WAY SHALL
COMPLY WITH STANDARD I.N.D.O.T. DETAILS.
SIDEWALK NOTE
ALL SIDEWALKS CONSTRUCTED WITHIN THE
PUBLIC RIGHT-OF-WAY SHALL COMPLY WITH
STANDARD CITY OF CARMEL DETAILS.
K
UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE
THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE
RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT
IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE
DEVELOPER'S RESPONSIBILITY TO RESOLVE WITH THE UTILITY.
EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN
ONE FOOT OR THE PROPOSED RIGHT-OF-WAY LINE.
CARMEL ENGINEERING DEPT. NOTE
ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE
REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE
DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE
DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED
INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE
DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY.
03/29/19