Loading...
HomeMy WebLinkAboutC2.0.Site Plan15' F.F.E. = 755.70 (NAVD 88 DATUM) Equality Blvd.Community DriveN 00°00'00" W 234.67'N 90°00'00" W 376.00'S 03°04'59" E 243.00'N 90°00'00" E 214.95' A/C A/C 25'5'36' 25' 3' 24' 91' 29' 18' 30' R10' R5' 9' 9' 9' 25' R8' R5' R25'R20' 9' R5'154.3'PROPOSED GYM & LEARNING CENTER 13,000± S.F. F.F.E. = 755.70 (NAVD 88 DATUM) F.F.E. = 755.70 (NAVD 88 DATUM) 24' 8' 32.7' 23' N 86°54'50" E 148.20' 5' EXISTING SCHOOL BUILDING EXISTING UTILITYESMT. TO BE VACATEDEXISTING DRAINAGEESMT. TO BE VACATED8' 53.8' 30' DRAINAGE ESMT.PERVIOUS PAVERS ARE TO BE PROTECTED DURING CONSTRUCTION (NO CONSTRUCTION TRAFFIC)EXISTING PLAYGROUND FENCE 14 5 EXISTING STORM WATER SWALE / DETENTION EXISTING GAS MAIN29 12 7 EXISTING PARKING SPACES6 EXISTING PLAYGROUND 3 4 CB EXISTING SCHOOL BUILDING K NO PARKING FIRE LANE 7 NEW 5' SIDEWALKCB CB CB CB CB DCCBCB DC CB CB CB DC CB CBCB DC DC DC DC DC DC DC DC D D H D D D D C C C C C C C C C C C DD D D D D D T A A A A A A A A A A A A A A A A J F G D D D D D K C D REFER TO ARCHITECTURAL PLANS FOR BLDG. DIMENSIONS EXISTING BICYCLE RACKS (QTY. 2, 4 SPACES) PER CARMEL UDO 5.29 PK-02.8 A 5' D D 6' 6.3' D 8' 8' 5' 5'5' 8' 8' D D 30' 3 3 3 3 3 PROJECT NUMBER DRAWING NUMBER SHEET OF SCALE: DATE: DWN BY: CHKD. BY:CIVIL SITE GROUP, INC. GROUP, INC.PROF E SS ION A L E NG INEERIND IA NA PE10910647 STATE OF -o NREG I STER E DBR IA N S CR O SSTPS.007 C2.0NOBLESVILLE, INDIANA 4606015575 STONY CREEK WAYTHE PLAY SCHOOL at LEGACY, INC.SITE PLANTHE PLAY SCHOOL at LEGACY SPORT COURT14454 COMMUNITY DRIVECARMEL, INDIANA 46033REVISION RECORD 06/22/2018 CONTRACTOR NOTE NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. DEVELOPMENT SUMMARY PROPOSED BUILDING = 13,000 G.S.F.± TOTAL SITE AREA = 2.0 AC+/- CURRENT ZONING = PUD GREENSPACE AREA = 29% (25,691 / 87,345) TOTAL DISTURBED AREA = 72,311 SF ± = 1.7 Ac +/- ANTICIPATED CONSTRUCTION START/COMPLETION DATE NOVEMBER, 2018 / JULY, 2019 TOTAL PARKING SPACES = 87 (INCLUDES STREET SPACES) TOTAL PARKING SPACES REQ'D = 59 (1 SPACE/EMPLOYEE + 1 SPACE/6 STUDENTS) TOPOGRAPHIC & BOUNDARY NOTE BUILDING NOTE REFER TO ARCHITECTURAL & FOUNDATION PLANS FOR ALL BUILDING DIMENSIONS. SITE LAYOUT NOTES UTILITY LOCATE NOTE LEGEND: PLAN NOTES: A H T D F G J C DW CB DC HANDICAP RAMP NOTE ALL HANDICAP RAMPS CONSTRUCTED WITHIN THE PUBLIC RIGHT-OF-WAY SHALL COMPLY WITH STANDARD I.N.D.O.T. DETAILS. SIDEWALK NOTE ALL SIDEWALKS CONSTRUCTED WITHIN THE PUBLIC RIGHT-OF-WAY SHALL COMPLY WITH STANDARD CITY OF CARMEL DETAILS. K UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPER'S RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OR THE PROPOSED RIGHT-OF-WAY LINE. CARMEL ENGINEERING DEPT. NOTE ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. 03/29/19