Loading...
HomeMy WebLinkAboutC1.0.Demolition PlanEquality Blvd.Community DriveA/C A/C 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 45 6 6 6 7 77 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 3 8 8 8 3 TEMPORARY CONSTRUCTION ENTRANCE EXISTING FIRE SERVICE LINE TO BE LOWERED 9 10 10 10 10 PROTECT STORM INLET UNTIL IT IS REMOVED 10 10 REMOVE EXISTING SCREEN WALL 2 2 2 PROJECT NUMBER DRAWING NUMBER SHEET OF SCALE: DATE: DWN BY: CHKD. BY:CIVIL SITE GROUP, INC. GROUP, INC.PROF E SS ION A L E NG INEERIND IA NA PE10910647 STATE OF -o NREG I S TER E DBR IA N S CR O S STPS.007 C1.0CARMEL, INDIANA 4603314454 COMMUNITY DRIVETHE PLAY SCHOOL at LEGACY, INC.EXISTING CONDITIONS & DEMOLITION PLANTHE PLAY SCHOOL at LEGACY SPORT COURT14454 COMMUNITY DRIVECARMEL, INDIANA 46033REVISION RECORD 06/22/2018 CONTRACTOR NOTE NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. TOPOGRAPHIC & BOUNDARY NOTE UTILITY LOCATE NOTE LEGEND: 1. EROSION CONTROL PLAN MUST BE EXECUTED BEFORE COMMENCING WITH CONSTRUCTION. 2. ALL EROSION CONTROL MATERIAL NEEDS TO BE APPROVED BY THE CITY INSPECTORS PRIOR TO INSTALLATION. EROSION CONTROL NOTES UTILITY VALVE NOTE UTILITY CROSSING NOTE CONTRACTOR TO FIELD VERIFY SIZE, DEPTH, AND MATERIAL OF ALL EXISTING UNDERGROUND UTILITIES AT EACH PROPOSED CROSSING PRIOR TO COMMENCING WITH CONSTRUCTION. RELOCATION OF EXISTING UTILITIES MAY BE REQUIRED. PAVEMENT NOTE ANY EXISTING ON-SITE PAVEMENT REMOVED SHALL BE SAWCUT, FULL DEPTH AND RESTORED TO MATCH THE EXISTING PAVEMENT CROSS SECTION WITH THE FOLLOWING CROSS SECTION AS A MINIMUM: 1-INCHES BITUMINOUS WEARING COURSE-TYPE B 9.5mm 3-INCHES BITUMINOUS LEVELING/BINDER COURSE-TYPE B 12.5 mm 6-INCHES #53 COMPACTED AGGREGATE BASE ALL JOINTS BETWEEN EXISTING AND NEW PAVEMENT TO BE FILLED WITH HOT POURED RUBBER JOINT SEALER PRODUCT. HOT POURED RUBBER JOINT SEALER SHALL BE ONE OF THE FOLLOWING (OR APPROVED EQUAL): · ROADSAVER 221; CRAFCO INC. · PRODUCT #9905 or #9030; KOCH MATERIAL COMPANY · SEALTIGHT HI-SPEC; W.R. MEADOWS, INC. DEMOLITION NOTES PLAN NOTES: 1 2 ALL PROPERTY CORNER MONUMENTS SHOULD BE MARKED PRIOR TO COMMENCING WITH CONSTRUCTION AND PROTECTED DURING ALL CONSTRUCTION ACTIVITY. PROPERTY CORNER MONUMENTS NOTE 3 4 5 6 7 8 9 10 04/01/19