Loading...
HomeMy WebLinkAboutC4.0.SWPP PlanF.F.E. = 755.70 (NAVD 88 DATUM) Equality Blvd.Community DriveA/C A/C PROPOSED GYM & LEARNING CENTER 13,000± S.F. F.F.E. = 755.70 (NAVD 88 DATUM) F.F.E. = 755.70 (NAVD 88 DATUM) EXISTING SCHOOL BUILDING EXISTING SANITARY MANHOLE T.C. = 757.45 INV. = 739.24± (EX. 8" PVC - W) INV. = 739.29± (EX. 8" PVC - E) CONCRETE WASHOUT BMP 30 CY ROLLOFF PROVIDED BY REPUBLIC WASTE SERVICES OR SEE DETAIL 04/C4.1 CONTRACTOR RESPONSIBLE TO K E E P R O A D & P A R K I N G SPACES FREE OF DUST/DEBRIS/ M U D A T A L L T I M E S EXISTING STORM WATER SWALE / DETENTION CONSTRUCTION LIMITS TO MATCH SOUTH PROPERTY LINE CONTRACTOR RESPONSIBLE TO KEEP DETENTION FACILITY FREE OF DUST/DEBRIS/MUD AT ALL TIMES PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS EB PS EB EB PS EB PS EB PS EB CONSTRUCTION LIMITS = 1.7 Ac± TEMPORARY CONSTRUCTION ENTRANCE REMOVE CHECK DAM UPON FINAL INSPECTION BY CITY. PROVIDE PERMANENT RESTORATION TO SWALE PS PS PS PS PS PS PS PS PS PS PS PS PS PS EB EB EB EB EB EB PS PS EB EB EB EB EB PS PS PS PS PSPS PS PS PS PS PS PS PS PS PS PS OcA OcA OcA OcA OcA OcA OcA OcA Equality Blvd.Community DrivePROJECT NUMBER DRAWING NUMBER SHEET OF SCALE: DATE: DWN BY: CHKD. BY:CIVIL SITE GROUP, INC. GROUP, INC.PROF E SS ION A L E NG INEERIND IA NA PE10910647 STATE OF -o NREG I S TER E DBR IA N S CR O S STPS.007 C4.0CARMEL, INDIANA 4603314454 COMMUNITY DRIVETHE PLAY SCHOOL at LEGACY, INC.STORMWATER POLLUTION PREVENTION PLANTHE PLAY SCHOOL at LEGACY SPORT COURT14454 COMMUNITY DRIVECARMEL, INDIANA 46033REVISION RECORD 06/22/2018 TOPOGRAPHIC & BOUNDARY NOTE LEGEND: GENERAL NOTES CONTRACTOR TO KEEP EXISTING PAVEMENT SURROUNDING THE SITE (I.E. COMMUNITY DRIVE & EQUALITY BLVD.) "BROOM CLEAN" AND FREE OF SOIL OR AGGREGATE THAT MIGHT BE BROUGHT OFF-SITE. DEPENDING ON THE CONSTRUCTION SEASON, MOISTURE CONTENT AND PROPERTIES OF THE SOILS ON SITE, CHEMICAL MODIFICATIONS AND/OR LIME STABILIZATION MAY BE REQUIRED. SEE SHEET C9.0 FOR SPECIFICATIONS. ALL CONCRETE PIPE JOINTS SHALL BE CONTINUOUS O-RING RUBBER GASKET CONFORMING TO ASTM C 443 CONTRACTOR (NOT THE PROJECT SITE OWNER) WILL BE RESPONSIBLE FOR THE DISPOSAL OF ANY SOIL, MATERIALS, ETC. NO OFF-SITE BORROWS OR STOCKPILES WILL BE NEEDED FOR THIS PROJECT. CONTRACTOR NOTE NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. STORM SEWER SYSTEM NOTE ALL STORM SEWER INFRASTRUCTURE TO BE CONSTRUCTED WITH THIS PROJECT SHALL BE PRIVATELY OWNED AND MAINTAINED BY THE PLAY SCHOOL AT LEGACY, INC. DEVELOPMENT SUMMARY TOTAL SITE AREA = 2.01 ACRES +/- TOTAL DISTURBED AREA = 1.7 ACRES +/- GRADING NOTES GENERAL NOTES ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR PS EB NS EROSION CONTROL NOTES TS TS MULCHING NOTE FERTILIZER NOTE SEEDING NOTE 1. EROSION CONTROL PLAN MUST BE EXECUTED BEFORE COMMENCING WITH CONSTRUCTION. 2. ALL EROSION CONTROL MATERIAL NEEDS TO BE APPROVED BY THE CITY INSPECTORS PRIOR TO INSTALLATION. EROSION CONTROL NOTES SCALE: 1" = 100' SOILS MAP CONTROL CONTACT: EROSION SOILS DESCRIPTIONS & LIMITATIONS 04/01/19