Loading...
HomeMy WebLinkAboutC6.0.Street Plan & ProfileEquality Blvd. 25' R8' R5' R25'R20' R5' 24' 8' 32.7' 23' 2% MAX 2% MAX 8' 30' 7 6 3 CB 7 CB CB CB CB CB DCCBCB DC CB CB CB DC CB CBCB DC DC DC DC DC DC DC DC D D H D D DD C C D D AA A J F EXISTING BICYCLE RACKS PROPOSED SOUTH R/W OF EQUALITY BLVD. TEMPORARY END OF PAVEMENT CONSTRUCTION BY OTHERS PROPOSED NORTH R/W OF EQUALITY BLVD. 34' Equality Blvd. 2% MAX 2% MAX30' EQUALITY BLVD. PROFILE PROJECT NUMBER DRAWING NUMBER SHEET OF SCALE: DATE: DWN BY: CHKD. BY:CIVIL SITE GROUP, INC. GROUP, INC.PROF E SS ION A L E NG INEERIND IA NA PE10910647 STATE OF -o NREG I S TER E DBR IA N S CR O SSTPS.007 C6.0NOBLESVILLE, INDIANA 4606015575 STONY CREEK WAYTHE PLAY SCHOOL at LEGACY, INC.STREET PLAN & PROFILE EQUALITY BOULEVARD EXTENSION THE PLAY SCHOOL at LEGACY SPORT COURT14454 COMMUNITY DRIVECARMEL, INDIANA 4603306/22/2018 TOPOGRAPHIC & BOUNDARY NOTE UTILITY LOCATE NOTE LEGEND: PLAN NOTES: A H D C CB DC SIDEWALK NOTE ALL SIDEWALKS CONSTRUCTED WITHIN THE PUBLIC RIGHT-OF-WAY SHALL COMPLY WITH STANDARD CITY OF CARMEL DETAILS. CARMEL ENGINEERING DEPT. NOTE ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. STREET PLAN ALL INFRASTRUCTURE SHALL BE INSTALLED IN ACCORDANCE WITH THE LOCAL GOVERNING AUTHORITY'S CONSTRUCTION STANDARDS. INFRASTRUCTURE NOTE NOTE DEPENDING ON THE CONSTRUCTION SEASON, MOISTURE CONTENT AND PROPERTIES OF THE SOILS ON SITE, CHEMICAL MODIFICATIONS AND/OR LIME STABILIZATION MAY BE REQUIRED. SEE SHEET C9.0 FOR SPECIFICATIONS. GENERAL NOTES 18 " OF VERTICAL SEPARATION MUST BE MAINTAINED FOR ALL UTILITY CROSSINGS. ALL CONCRETE PIPE JOINTS SHALL BE CONTINUOUS O-RING RUBBER GASKET CONFORMING TO ASTM C 443 ALL PAVING IS TO BE DONE DURING ONE PAVING SEASON. PAVING NOTE REVISION RECORD 04/01/19