Loading...
HomeMy WebLinkAboutTPS007.C0.0.Title SheetSITE THE PLAY SCHOOL at LEGACY SPORT COURT 14454 COMMUNITY DRIVE CIVIL CONSTRUCTION PLANS PROJECT DEVELOPER: CARMEL, INDIANA 46033 C0.0 VICINITY MAP SHEET OF PROJECT NUMBER DRAWING NUMBER TPS.007 PROJECT VICINITY 160 W. Carmel Drive, Suite 240 Carmel, Indiana 46032 Phone: (317) 810-1677 Fax: (317) 810-1679 GROUP, INC 06/22/2018 THE PLAY SCHOOL at LEGACY 15575 STONY CREEK WAY NOBLESVILLE, INDIANA 46060 SURVEYOR: CONSTRUCTION PLAN INDEX LAND DESCRIPTION A PART OF THE NORTHWEST QUARTER OF SECTION 23, TOWNSHIP 18 NORTH, RANGE 4 EAST, CLAY TOWNSHIP, HAMILTON COUNTY, INDIAN, BEING MORE PARTICULARLY DESCRIBED AS BELOW: COMMENCING AT THE NORTHEAST CORNER OF SAID QUARTER SECTION; THENCE NORTH 89 DEGREES 03 MINUTES 27 SECONDS WEST ALONG THE NORTH LINE OF SAID QUARTER SECTION A DISTANCE OF 715.41 FEET TO THE PROLONGED WESTERLY RIGHT-OF-WAY LINE OF COMMUNITY DRIVE RECORDED AS INSTR NO: 2008-43636 IN THE OFFICE OF THE RECORDER OF HAMILTON COUNTY, INDIANA; THENCE SOUTH 00 DEGREES 00 MINUTES 00 SECONDS WEST 92.83 FEET ALONG SAID PROLONGED RIGHT-OF-WAY LINE TO A POINT ON THE SOUTHERLY LIMITED ACCESS RIGHT-OF-WAY LINE OF 146TH STREET; THENCE ALONG SAID WESTERLY RIGHT-OF-WAY LINE OF COMMUNITY DRIVE BY THE NEXT SEVEN (7) COURSES: 1) SOUTH 00 DEGREES 00 MINUTES 00 SECONDS WEST 223.06 FEET TO A POINT OF TANGENCY OF A CURVE CONCAVE WESTERLY, THE RADIUS POINT OF SAID CURVE BEING NORTH 90 DEGREES 00 MINUTES 00 SECONDS WEST 455.50 FEET: 2) ALONG SAID CURVE 34.64 FEET TO THE POINT OF TANGENCY OF SAID CURVE, SAID POINT BEGINNING SOUTH 85 DEGREES 38 MINUTES 33 SECONDS EAST 455.50 FEET; 3) SOUTH 04 DEGREES 21 MINUTES 27 SECONDS WEST 242.38 FEET TO THE POINT OF TANGENCY OF A CURVE CONCAVE EASTERLY, THE RADIUS POINT OF SAID CURVE BEING SOUTH 85 DEGREES 38 MINUTES 33 SECONDS EAST 544.50 FEET; 5) SOUTH 00 DEGREES 00 MINUTES 00 SECONDS EAST 88.34 FEET TO A POINT OF TANGENCY OF A CURVE CONCAVE EASTERLY, THE RADIUS POINT OF SAID CURVE BEING NORTH 90 DEGREES 00 MINUTES 00 SECONDS EAST 544.50 FEET; 6) ALONG SAID CURVE 29.30 FEET TO THE POINT OF TANGENCY OF SAID CURVE, SAID POINT BEGINNING SOUTH 85 DEGREES 38 MINUTES 33 SECONDS EAST 544.50 FEET; 7) SOUTH 03 DEGREES 04 MINUTES 59 SECONDS EAST 195.88 FEET TO THE POINT OF BEGINNING OF THIS DESCRIPTION; THENCE SOUTH 03 DEGREES 04 MINUTES 59 SECONDS EAST 243.00 FEET ALONG SAID WESTERLY RIGHT-OF-WAY LINE; THENCE NORTH 90 DEGREES 00 MINUTES 00 SECONDS WEST 376.00 FEET; THENCE NORTH 00 DEGREES 00 MINUTES 00 SECONDS EAST 234.67 FEET; THENCE NORTH 90 DEGREES 00 MINUTES 00 SECOND EAST 214.95 FEET; THENCE NORTH 86 DEGREES 54 MINUTES 50 SECONDS EAST 148.20 FEET TO SAID WESTERLY RIGHT-OF-WAY LINE AND THE PLACE OF BEGINNING, CONTAINING 2.00 ACRES MORE OR LESS.PROF E SS ION A L E NG INEERIND IA NA PE10910647 STATE OF -o NREG I S TER E DBR IA N S CR O S SREVISION RECORD DEVELOPMENT SUMMARY PROPOSED USE: SCHOOL GYMNASIUM & STEM LEARNING FACILITY TOTAL SITE AREA = 2.01± Ac. TOTAL DISTURBED AREA = 72,311± SF = 1.7± Ac PROPOSED TOTAL BUILDING COVERAGE RATIO = 39% OF SITE AREA PROPOSED IMPERVIOUS AREA SITE INCREASE = 26,400± S.F. CURRENT ZONING = PUD - THE LEGACY SETBACK DISTANCES (PROPOSED) BUILDING SETBACK DISTANCES (REQ'D) FRONT = 0' FRONT = 15' (MAX.) REAR = 9.4' (EX. BLDG.) REAR = 5' (MIN.) SIDE = 15' (EX. BLDG.) SIDE = 0' (MIN.) ANTICIPATED CONSTRUCTION START/COMPLETION DATE SEPTEMBER 3, 2018 / OCTOBER, 2019 TOTAL PARKING SPACES = 91 (INCLUDES STREET PARKING SPACES) EXISTING RIGHT-OF-WAY NOTE DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. OPERATING AUTHORITY CITY OF CARMEL DEPT. OF ENGINEERING ONE CIVIC SQUARE CARMEL, INDIANA 46032 PHONE: 317-571-2441 FAX: 317-571-2439 CARMEL ENGINEERING DEPT. NOTE ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. BENCHMARK ENGINEER: 04/01/19