Checklist Items
PZ18060012 DP Amend ADLS - Play School Sport Court
Project Name:
06/21/2018 4:37 PM
Workflow Started:
04/01/2019 03:08 PM
Report Generated:
Date
Permit Type
CycleComment TypeReviewer CommentApplicant ResponseStatusUpdated ByLast UpdatedCompleted?
Completed
08/29/2018
Please provide all of the following on the cover sheet: The correct information has been added to the Title Sheet for the 08/29/2018
Planning Project
1Residential-CommercialMETAlex JordanTrue
2:04 PM
Engineering firm's name, address, phone, and email addressengineer - Civil Site Group. See Sheet C0.0.2:04 PM
08/29/2018
Please provide all of the following on the cover sheet: The correct information has been added to the Title Sheet for the 08/29/2018
Planning Project
1Residential-CommercialMETAlex JordanTrue
2:04 PM
developer's name, address, phone and email addressowner/developer – The Play School. See Sheet C0.0.2:04 PM
08/29/2018
The Stormwater Management Application has been sent to the 08/29/2018
Planning Project
1Residential-CommercialPlease submit a storm water management permit applicationMETAlex JordanTrue
2:04 PM
owner for signature and will be provided to you upon receipt.2:04 PM
08/29/2018
Please stamp the plans as "Approval Pending-Not for The required language has been added to the Title Sheet over the 08/29/2018
Planning Project
1Residential-CommercialMETAlex JordanTrue
2:04 PM
Construction"Engineer’s stamp. See Sheet C0.0.2:04 PM
Email response from Chris Ellison dated 05/31/18,"Access looks
08/29/2018
Please verify with CFD that all turning radii are appropriate and OK. There is an existing hydrant at the SW area of the parking lot. 08/29/2018
Planning Project
1Residential-CommercialMETAlex JordanTrue
2:04 PM
adequate for fire trucksI will want access to it so you will need to mark a fire lane at the 2:04 PM
closest parking space to it."
The road and driveway drainage basins will be directed to the
existing storm infrastructure in Equality Blvd. Most, if not all, of the
school impervious area (building, parking lot, etc.) will be routed
through the on-site storm sewer system. There are a few areas,
08/29/2018
08/29/2018
Planning Project
1Residential-CommercialPlease verify that there are no direct discharge areassuch as the playground and greenspace behind the parking lot METAlex JordanTrue
2:04 PM
2:04 PM
curb, that will flow directly into the detention swale via overland
flow. Nevertheless, all discharge areas will be directed to the dry
detention swale just south of the subject property which agrees
with the Legacy drainage master planned.
All existing utility information, including sizes, inverts, and pipe
materials, should now be shown on the necessary plan sheets.
08/29/2018
Please verify that the locations of existing utilities with top of 08/29/2018
Planning Project
1Residential-CommercialMETAlex JordanTrue
The locations will be field verified prior to commencing with
2:04 PM
curb and invert elevations, pipe sizes, and direction are shown2:04 PM
construction. See Sheet C5.0 of the revised construction plan
documents.
All locations of the existing on-site and necessary off-site utilities
Please verify that all existing culverts, pipes, and bridges on will be field verified prior to commencing with construction. The
08/29/2018
08/29/2018
Planning Project
1Residential-Commercialexisting drives or under the roadway are shown indicating size, locations of what is being removed and what is being reused is METAlex JordanTrue
2:04 PM
2:04 PM
type, and invert elevationsshown on the Existing Conditions and Demolition Plan as well as
the Utility Plan. See Sheets C1.0 and C5.0.
All locations of the existing on-site and necessary off-site utilities
Please verify that the locations of all existing electrical power will be field verified prior to commencing with construction. The
08/29/2018
08/29/2018
Planning Project
1Residential-Commercialvaults, transformers, power lines, gas lines, television cable , locations of what is being removed and what is being reused is METAlex JordanTrue
2:04 PM
2:04 PM
and telephone lines are shownshown on the Existing Conditions and Demolition Plan as well as
the Utility Plan. See Sheets C1.0 and C5.0.
08/29/2018
Please provide all on-site and off-site flood routing through the The emergency overflow flood route/path is shown via a hatch on 08/29/2018
Planning Project
1Residential-CommercialMETAlex JordanTrue
2:04 PM
sitethe Grading & Drainage Plan. See Sheet C3.0.2:04 PM
A “Clogged Inlets” exhibit has been provided which shows that if
each inlet were to be 100% clogged that stormwater runoff would
08/29/2018
Please show the 100-year elevations of all inlets in the spill through the proposed parking lot at each overtopping 08/29/2018
Planning Project
1Residential-CommercialMETAlex JordanTrue
2:15 PM
clogged condtionselevation along the emergency overflow route. Stormwater runoff 2:15 PM
would eventually reach the existing dry detention swale just south
of the project site. See attached exhibit.
09/04/2018
09/04/2018
Planning Project
1Residential-CommercialPlease provide the City's paving policy in the setNote already on Title sheetMETAlex JordanTrue
8:49 AM
8:49 AM
Please list what ‘green’ or sustainable site or building design
None proposed with this project related to site construction. It is
aspects will implemented, similar to the LEED checklist:
11/08/2018
Rachel 11/08/2018
Planning Project
1Generalpossible that the roof membrane on the gym could be METTrue
www.usgbc.org/leed/rating-systems from the US Green
4:39 PM
Keesling4:39 PM
Thermoplastic Polyolefin (TPO), color white.
Building Council. (This is not a requirement, but the
Commission looks favorably upon this.)
11/08/2018
Submit a copy of the Adjoining Property Owners List from Rachel 11/08/2018
Planning Project
1Public NoticeList uploaded to Public Notice folder.METTrue
4:39 PM
Hamilton County.Keesling4:39 PM
Date
Permit Type
CycleComment TypeReviewer CommentApplicant ResponseStatusUpdated ByLast UpdatedCompleted?
Completed
11/08/2018
Provide the filled out and notarized affidavit of notice of public Rachel 11/08/2018
Planning Project
1Public NoticeAffidavit uploaded to Public Notice folder.METTrue
4:41 PM
hearing page of the application.Keesling4:41 PM
11/08/2018
Rachel 11/08/2018
Planning Project
1Public NoticeSubmit Proof of Publication from the newspaper.Uploaded to Public Notice folder.METTrue
4:41 PM
Keesling4:41 PM
11/08/2018
Rachel 11/08/2018
Planning Project
1Public NoticeSubmit Certificate of Mailing for proof of mailing.Uploaded to Public Notice folder.METTrue
4:41 PM
Keesling4:41 PM
11/08/2018
Rachel 11/08/2018
Planning Project
1Public NoticeSubmit a copy of the Sign Affidavit.Uploaded to Public Notice folder.METTrue
4:41 PM
Keesling4:41 PM
11/08/2018
Provide the filled out Notice of Public Hearing page of the Rachel 11/08/2018
Planning Project
1Public NoticeUploaded to Public Notice folder.METTrue
4:45 PM
application.Keesling4:45 PM
11/08/2018
Are street lights proposed with this development? If so, please Rachel 11/08/2018
Planning Project
1Site PlanNo new street lights are proposed with Equality Blvd. extension.METTrue
4:45 PM
submit their location on a Lighting Plan and on the Site Plan.Keesling4:45 PM
Please provide architectural elevations of the proposed
11/08/2018
Rachel 11/08/2018
Planning Project
1Architectural DesignDumpster Enclosure detail elevation uploaded to Project Dox.METTrue
dumpster enclosure. They must be architecturally compatible
4:45 PM
Keesling4:45 PM
with the primary building.
The parapet heights will be approximately 3’-6” at the perimeter.
This will vary somewhat based on the roof slope to the drains.
11/08/2018
Please show how rooftop equipment will be screened from Rachel 11/08/2018
Planning Project
1Architectural DesignMETTrue
The intent is that roof top units will be screened via the parapet,
4:45 PM
view, if applicableKeesling4:45 PM
and if needed, a roof mounted screen would be added around the
units as well.
Department Review Status Report
Project Name: PZ18060012 DP Amend ADLS - Play School Sport Court
Workflow Started: 06/21/2018 4:37 PM
Report Generated: 04/01/2019 03:15 PM
Reviewer CommentsApplicant Comments
CycleDepartmentReviewerEmailStatus
Since the building addition will be connected to the existing pre-
school, it probably will not need a separate address. If you wish
AddressingDave McCoyDMcCoy@carmel.in.govApproved
to have a separate address it will probably have to be an
"Equality Blvd" address.
Carmel Information
Theresa Krueskamptkrueskamp@carmel.in.govNo Comments
Systems
Pending water approvalMet with Steve Cook on 7/27/18. Revisions made and sent via email
Carmel UtilitiesLisa Kempalkempa@carmel.in.govPending
on 8/16/18.
Drainage review is currently ongoing and comment letter will be Resubmitted revisions to Crossroad via email 08/16/18.
CrossRoad EngineersWillie Hallwhall@crossroadengineers.comRevisions Requested
issued via e-mail by the end of the week.
Revisions completed.
EngineeringAlex Jordanajordan@carmel.in.govRevisions Requested
1. Provide an additional hydrant have it placed adjacent to the 1) Hydrant added next to FDC. 2)Noted. Contractor to be notified.
new FDC or move the FDC out to the curb adjacent to the exiting 3)Noted. Working with Steve Cook at Carmel Water.
hydrant in the no parking fire lane zone. All FDC s and hydrants
to supply them should always be on the same side of a fire
department access road and never over 100 feet apart from each
other along the route of the Approved fire department vehicle
access routing.
Revisions Requested but
FireCarmel Firecfdinspections@carmel.in.gov
Released for Public Hearing
2. All required exiting for the existing building shall not be
obstructed during construction.
3. The Required fire alarm and fire sprinkler system shut down
shall only occur when the provider is not open and operating
1
and/or occupied.
My main concern is the gym portion of the new building and how Curran Architecture has provided revisions to address comments.
Revisions Requested but
Planning & ZoningRachel Keeslingrkeesling@carmel.in.gov
to add more detail into its design, as well as address the scale of
Released for Public Hearing
it in comparison to the existing building.
PoliceTeresa Andersontanderson@carmel.in.govApproved
Revisions made.
Urban ForestryDaren Mindhamdmindham@carmel.in.govRevisions Requested
Vectren does not have any objections to your building addition as Service relocation may be required due to building addition hallway
it does not conflict with our existing main or service line to your to be constructed over existing service.
building. Will this add additional load? We need to make sure
the existing meter can handle any additional load if any. Please
call our New Service Center at 1-800-990-1930 to advise them of
the new addition if there will be additional load.
Vectren EnergyJoanie Clarkjlclark@vectren.comApproved
Thank you,
Joanie Clark
Vectren Energy Delivery
317-776-5532
please contact for meeting Met with Steve Cook on 7/27/18. Revisions made and sent via email
Carmel Water OperationsSteve Cookscook@carmel.in.govRevisions Requested
on 8/16/18.
Revisions Requested but
Responses provided on PD.
Transportation SystemsDavid Littlejohndlittlejohn@carmel.in.gov
Released for Public Hearing
Carmel Wastewater
At this time we have no questions or concerns. All items are to
Carmel SewerJFaucett@carmel.in.govApproved
Operations
Carmel collection system standards. JS 05July18
Please send two sets of paper plans. Thank you.
Carmel UtilitiesLisa Kempalkempa@carmel.in.govRevisions Requested
CRC letter issued via e-mail on 8/21/2018.
CrossRoad EngineersWillie Hallwhall@crossroadengineers.comApproved
2
Reviewer CommentsApplicant Comments
CycleDepartmentReviewerEmailStatus
We have reviewed the plans and have no further comments.
Before we can issue a storm water management permit, the
following items will need to be submitted:
1. 9 final sets and one digital copy
2. A signed storm water management permit application
3. One digital copy of plans sent to Steve Cook with Utilities
4. An erosion control engineers estimate
5. An erosion control performance bond in the amount of the
EngineeringAlex Jordanajordan@carmel.in.govApproved
engineers estimate once it is approved
6. A right-of-way improvement engineers estimate
7. A right-of-way improvement performance bond in the
2
amount of the engineers estimate once it is approved
8. A right-of-way permit application and $5,000 license and
permit bond
9. All applicable Utility fees paid
Approved with
All previous comments for this project stay the same. No
FireCarmel Firecfdinspections@carmel.in.gov
Conditions/Commitments
additional comments at this time.
All of my comments have been addressed. Thank you.
Planning & ZoningRachel Keeslingrkeesling@carmel.in.govApproved
Urban ForestryDaren Mindhamdmindham@carmel.in.govApproved
Plan Revisions addressed w/ 11/12/18 Utility Plan Revision. Alternate
Carmel Water OperationsSteve Cookscook@carmel.in.govRevisions Requested
Sanitary Lateral revision made 02/01/19.
Transportation SystemsDavid Littlejohndlittlejohn@carmel.in.govApproved
Carmel UtilitiesLisa Kempalkempa@carmel.in.govApproved
Carmel Water OperationsSteve Cookscook@carmel.in.govApproved
3
Transportation SystemsDavid Littlejohndlittlejohn@carmel.in.govApproved