Loading...
HomeMy WebLinkAbout18662 Signed and Sealed ComcheckCOMcheck Software Version 4.0.8.2 Interior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Construction Site: 9701 N. Michigan Rd. Carmel, IN Allowed Interior Lighting Power 90.1 (2007) Standard Freddy's Frozen Custard New Construction Owner/Agent: A Area Category Designer/Contractor: BC Engineers Inc. 5720 Reeder St. Shawnee, KS 66203 B C D Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B X C) 1-Dining: Cafeteria/Fast Food 3680 1.40 5152 Proposed Interior Lighting Power A Fixture ID :Description /Lamp /Wattage Per Lamp / Ballast Total Allowed Watts = 5152 B C D E Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. 1-Dining: Cafeteria/Fast Food LED 1: A: LED Panel 55W: 1 17 54 918 LED 2: G: LED PAR 12W: 1 10 12 120 Track lighting 1: C/F: Wattage based on circuit breaker capacity (20 amps x 120 volts) 0 0 2400 2400 Total Proposed Watts = 3438 Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 90.1 (2007) Standard requirements in COMchec Versio 4.0.8.2 and to comply with any applicable mandatory requirements listed in the Inspection Chec Ocir,Itl l . Se; we Jill* MW Name - Title S a re `�� XN T. � r �zi� Date 4 PE11600694 • STATE OF °2 Project Title: Freddy's Frozen Custard Report date: 11/29/18 Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Page 1 of 12 COMcheck Software Version 4.0.8.2 Exterior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Construction Site: 9701 N. Michigan Rd, Carmel, IN Allowed Exterior Lighting Power A Area/Surface Category 90.1 (2007) Standard Freddy's Frozen Custard New Construction Owner/Agent: Designer/Contractor: BC Engineers Inc. 5720 Reeder St. Shawnee, KS 66203 B C D Quantity Allowed Tradable Watts / Unit Wattage 34739 ft2 0.15 Yes Total Tradable Watts (a) = Total Allowed Watts = Total Allowed Supplemental Watts (b) = E Allowed Watts (B X C) 5211 5211 5211 261 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces. (b) A supplemental allowance equal to 261 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID :Description /Lamp /Wattage Per Lamp /Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Parkina area(s) (34739 ft2): Tradable Wattaae LED 1: S38/S4B: LED Roadway -Parking Unit 220W: LED 2 copy 1: D2: Other: LED 2: D4: Other: LED 2 copy 1: D8: Other: LED 4: H: Other: LED 5: L: Other: LED 6: O: Other: LED 1 coov 1: SW2: LED Roadwav-Parkina Unit 220W Exterior Lighting Compliance Statement 1 5 210 1050 1 5 35 175 1 7 72 504 1 7 114 798 1 12 15 180 1 1 20 20 1 2 29 58 1 2 30 60 Total Tradable Proposed Watts = 2845 Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application The proposed exterior lighting systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck �/� n 0.8.2 and to comply with any applicable mandatory requirements listed in the Inspection Check'S P ^ Name - Title a u Date FE11600694 1 y 9 • STATE OF ; • cC Project Title: Freddy's Frozen Custard ��si��� /`CNA `E�+��C�"�` Report date: 11/29/18 Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Page 2 of 12 COMcheck Software Version 4.0.8.2 Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: 9701 N. Michigan Rd. Carmel, IN Mechanical Systems List Quantity System Type & Description 2 HVAC System 1 (Single Zone): 90.1 (2007) Standard Freddy's Frozen Custard Carmel, Indiana 5a New Construction Owner/Agent: Designer/Contractor: BC Engineers Inc. 5720 Reeder St. Shawnee, KS 66203 Heating: leach -Central Furnace, Gas, Capacity = 130 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency = 80.009/o Et Cooling: 1 each - Single Package DX Unit, Capacity = 79 kBtu/h, Air -Cooled Condenser Proposed Efficiency = 11.00 EER, Required Efficiency: 11.00 EER Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 3000 CFM, 3.0 motor nameplate hp 1 HVAC System 2 (Single Zone): Heating: leach -Central Furnace, Gas, Capacity = 180 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency = 80.00% Et Cooling: 1 each - Single Package DX Unit, Capacity = 134 kBtu/h, Air -Cooled Condenser Proposed Efficiency = 11.00 EER, Required Efficiency: 11.00 EER Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 2 Supply, Constant Volume, 5000 CFM, 5.0 motor nameplate hp 1 Water Heater 1: Gas Storage Water Heater, Capacity: 50 gallons, Input Rating: 75 kBtu/h w/ Circulation Pump Proposed Efficiency: 0.60 EF, Required Efficiency: 0.58 EF Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.0.8.2 and comply with any applicable mandatory requirements listed in the Inspection Checklist. `�OS1f1E1 Name - Title Signature®� w -'� Dat N 0. FE11400i05 Project Title: Freddy's Frozen Custard Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Report date: 11/29/18 Page 3 of 12 OMcheck oftware Version1' nspection Checklist nergy••- 91 11 •. • Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & RegaD 4.2.21 Plans, specifications, and/or ❑Complies _ Requirement will be met. 6.4.2 calculations provide all information ❑Does Not [PR2]1 with which compliance can be ❑Not Observable determined for the mechanical systems and equipment and ❑Not Applicable document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. 4.2.2? Plans, specifications, and/or ❑Complies Requirement will be met. 7.4.1 calculations provide all information ❑Does Not [PR3]1 with which compliance can be ❑Not Observable determined for the service water ❑Not heating systems and equipment and Applicable document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. 4.2.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR4]1 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the lighting and electrical systems and equipment and❑Not Applicable document where exceptions to the standard are claimed. Information ( provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. 6.7.2.4 Detailed instructions for HVAC ❑Complies Exception: Requirement does not apply. [PR5]1 systems commissioning included on ❑Does Not the plans or specifications for projects ❑Not Observable' >=50,000 ft2. ❑Not Applicable 8AblA, Plans, specifications, and/or ❑Complies Requirement will be met. 8.4.1.2 -'calculations provide all information ❑Does Not [PR6]2 with which compliance can be Observable' determined for the electrical systems❑Not and equipment and document where ❑Not Applicable exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. Additional Comments/Assumptions: _1 :High Impact (Tier 1) Medium Impact (Tier 2) �_3 Low Impact (Tier 3) Project Title: Freddy's Frozen Custard Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Report date: 11/29/18 Page 4 of 12 Section # Footing ! Foundation Inspection Complies?Comments/Assumptions & Req.ID 6.4.3.8 Freeze protection and snow/ice ❑Complies Requirement will be met. [FO9]3'' melting system sensors for future ❑Does Not connection to controls. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) � Project Title: Freddy's Frozen Custard Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Report date: 11/29/18 Page 5 of 12 section # Plumbing Rough -in Inspection Complies? Comments/Assumptions & Req.ID 7,A3 Service hot-water piping systems ❑Complies Requirement will be met. [PLl]z insulated. Where piping is installed in ❑Does Not or under a slab, verification may need to occur during Foundation Inspection.:❑Not Observable ❑Not Applicable 7AA 1 Temperature controls installed on ❑Complies Requirement will be met. [PL2]3 service water heating systems ❑Does Not (<=1209F to maximum temperature for intended use). ❑Not Observable',' ❑Not Applicable ------------------------------------------ —--------------- --- 7AA,2 Automatic time switches installed to ❑Complies Requirement will be met. [PL3]1 automatically switch off the ❑Does Not recirculating hot-water system or heat ❑ trace. Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 ;High Impact (Tier 1) 2 Medium Impact (Tier 2) i 3 Low Impact (Tier 3) Project Title: Freddy's Frozen Custard Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Report date: 11/29/18 Page 6 of 12 Section # Mechanical Rough -in Plans Verified Field Verified ., Complies. Comments/Assumptions & Req.l Inspection Value Value T^ 6.4.1,41 HVAC equipment efficiency Efficiency: Efficiency: ❑Complies see the Mechanical systems list 6.4.1.5 verified. Non-NAECA HVAC a❑Does Not ' for values. [ME1]2 equipment labeled as meeting ❑ Not Observable � 90.1. ❑Not Applicable 6.4,3.4;1 Stair and elevator shaft vents ❑Complies Exception: Requirement [ME3]3 have motorized dampers that ❑Does Not does not apply. automatically close. ❑Not Observable ❑Not Applicable 6.4.3.4,21 Outdoor air and exhaust systems ❑Complies Requirement will be met. 6.4.3.4,3, ! have motorized dampers that IDDoes Not 6.4.3.4.4 'automatically shut when not in ❑Not Observable [ME4]3 use and meet maximum leakage rates. Check gravity dampers '❑Not Applicable where allowed. 6.4.3.4.5 Ventilation fans >0.75 hp have ❑Complies Requirement will be met. f [ME5]3 automatic controls to shut off fan ❑Does Not when not required. ❑Not Observable ❑Not Applicable 6.4.3.9 Demand control ventilation ❑Complies Exception: Systems with a [ME6]1 provided for spaces >500 ft2 and ❑Does Not design outdoor airflow less >40 people/1000 ft2 occupant ❑Not Observable than 1200 cfm, density and served by systems with air side economizer, auto ❑Not Applicable modulating outside air damper control, or design airflow >3,000 cfm. 6.4.4.1.1 f Insulation exposed to weather ❑Complies Requirement will be met. [ME7]3 protected from damage. ❑Does Not Insulation outside of the ❑Not Observable conditioned space and associated ❑Not Applicable with cooling systems is vapor retardant. _.. 6.4.4.1.2 HVAC ducts and plenums R- - .....:..M R ❑Complies Requirement will be met. [ME8]2 insulated. ❑Does Not I ❑Not Observable j ❑Not Applicable ... 6.4.4.1.3 ...... ........ ........ ............. HVAC piping insulation thickness ..a..... ....... ........ in. ....... ....... ......_.. ... ..... .. in. ❑Complies .......... a a a.... ...... Requirement will be met. [ME9]2 ❑Does Not ❑Not Observable ❑Not Applicable ..... ..... 6.4.4.2.1 .._.... ....... _.-.... ......... Ducts and plenums sealed based _._... ....._.._ a.,_._... ____ _ .__ ___. .. ... a.. .........; ❑Complies Requirement will be met. [ME10]2 on static pressure and location. ❑Does Not ❑Not Observable ❑Not Applicable ................. ..._.... 6.4.4.2.2 Ductwork operating >3 in. water ;. _ add . _. __ aO Fa OF_ F,,.. . ..a ._ _..._....... ....._...... add _..... ................_ ❑Complies : . FFFFFFF#v....... .. ...... a., Exception: Requirement [ME11]3 column requires air leakage ❑Does Not does not apply. testing. ❑Not Observable ❑Not Applicable ... 6.4.4.2.2 ..... Ductwork operating >3 in. water __,.._ _ .._ ., . _ _ ,. .. ..... _: , _ _..... ... ...... ❑Complies ..... .. .... ..._............... Exception: Requirement [ME11]3 column requires air leakage ❑Does Not does not apply. [ testing. '❑Not Observable ❑Not Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) � 3 Low Impact (Tier 3) Project Title: Freddy's Frozen Custard Report date: 11/29/18 Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Page 7 of 12 Section �# Mechanical Rough -In ' Plans Verified Field Verifined , Complies. Comments/Assumptions & Fteq.1 Inspection Value Value 6.5.2.3 Dehumidification controls :❑Complies Requirement will be met. [ME19]3 provided to prevent reheating, ❑Does Not retooling, mixing of hot and cold ❑Not Observable airstreams or concurrent heating ❑Not Applicable and cooling of the same airstream. 6.5.4.1 HVAC pumping systems >10 hp ❑Complies Exception: Minimum flow is [ME25]3 designed for variable fluid flow. ❑Does Not less than required for proper ❑Not Observable 'operation and pump power =75 hp. ❑Not Applicable 6.5.6.1 Exhaust air energy recovery on ❑Complies Exception: Requirement [ME30]1 systems >=5,000 cfm and 70% ❑Does Not does not apply. of design supply air. ❑Not Observable ❑Not Applicable 6.53A Kitchen hoods >5,000 cfm have ❑Complies Exception: Requirement [M,E32]2 make up air >=50% of exhaust -]Does Not does not apply. air volume. ,❑Not Observable ❑Not Applicable 6.5.7.2 Fume hoods exhaust systems ❑Complies Exception: Requirement [ME33]1 >=15,000 cfm have VAV hood ❑Does Not does not apply. exhaust and supply systems, ❑Not Observable direct make-up air or heat ❑Not Applicable recovery. 6.5.8.1 Unenclosed spaces that are ❑Complies Exception: Requirement [ME34]3 heated use only radiant heat. ❑Does Not does not apply. ❑Not Observable ❑Not Applicable 6.5.9 Hot gas bypass limited to: <=240 ❑Complies Requirement will be met. [ME35]1 kBtu/h - 50% >240 kBtu/h - 25% ❑Does Not ❑Not Observable ❑Not Applicable 6.5.9 Hot gas bypass limited to: <=240 ❑Complies Requirement will be met. I [ME35]1 kBtu/h - 50% >240 kBtu/h - 25% ❑Does Not ❑Not Observable ❑Not Applicable 7.4.2 Service water heating equipment ❑Complies I[ME36]2 meets efficiency requirements. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 ;High Impact (Tier 1) ; 2' Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Freddy's Frozen Custard Report date: 1129/18 Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Page 8 of 12 Section— # Rough In Electrical Inspection Complies' Comments/Assumptions & Req.1 [3 — 9AAA Automatic controls to shut off all ---- ❑Complies - -- -- - -- Requirement will be met. [EL1]2 building lighting installed in buildings❑Does Not >5,000 ft2. '❑Not Observable' ❑Not Applicable 9.4.1.2 Independent lighting controls installed ❑Complies Requirement will be met. [EL2]2 per approved lighting plans and all ❑Does Not manual controls readily accessible and '❑Not Observable'. visible to occupants. ❑Not Applicable 9AJ 3 Automatic lighting controls for exterior ❑Complies Requirement will be met. [EL3]2 lighting installed. ❑Does Not ❑Not Observable ❑Not Applicable 9.4.1.4 Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 specific uses installed per approved ❑Does Not lighting plans. ',❑Not Observable: ❑Not Applicable 9.4.2 Ballasted one and three lamp fixtures❑Complies Requirement will be met. [EL5]3 with >30 W/lamp have two lamp ❑Does Not tandem wired ballasts when >=2 ❑Not Observable fixtures in same space on same ❑Not Applicable control. .... am .............................. 9.4.3 .............. a ............. a....... ... ... Exit signs do not exceed 5 watts per ........ ................... ............ ..............._...... ❑Complies ............. ............_.................................................................... _............... ......... .......... _......... ............. ............. ......................... ........._..................... ................. .......... Requirement will be met. [EL6]1 face. !❑Does Not ❑Not Observable ❑Not Applicable 9.4.4 ................... ...................._....................................................... Exterior grounds lighting over 100 W _................................................................................................................................................................................................................................. ❑Complies OFF ....................................................-............................................... a.......... Requirement will be met. [EL7]1 provides >60 Im/W unless on motion ❑Does Not sensor or fixture is exempt from scope :[:]Not Observable' of code or from external LPD. ❑Not Applicable 9.6.2 Additional interior lighting power ❑Complies Requirement will be met. [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is ❑Not Observable' automatically controlled and separated from general lighting. ❑Not Applicable ..........._._.........__.........................._...................._................................_................................................_..._....._............................................................................. 10.4.1 Electric motors meet requirements ❑Complies a Requirement will be met. [EL9]2 where applicable. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) �2 Medium Impact (Tier 2) � 3 Low Impact (Tier 3) Project Title: Freddy's Frozen Custard Report date: 11/29/18 Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Page 9 of 12 Section # & Req.I D Final Inspection Complies Comments/Assumptions — _ 6.4.3.11 — ---- --- Heating and cooling to each zone is --- ❑Complies Requirement will be met. [FI2]2 controlled by a thermostat control. ❑Does Not ❑Not Observable ❑Not Applicable — --- 6.4.3.1.2, <Thermostatic - ---- — --- — --- — --- --- controls have a 5 OF -- — — — -- ❑Complies ------..— . Requirement will be met. 6.4.3.2, deadband. ❑Does Not 6.4,3.3, ❑Not Observable 6.4.3.3,1, 6.4.3.3.2 i' ❑Not Applicable [F 3]2 6.4.3.7 When humidification and ❑Complies Requirement will be met. [FI6]3 dehumidification are provided to a ❑Does Not zone, simultaneous operation is ❑Not Observable prohibited. ❑Not Applicable 6.7.2.1 Furnished HVAC as -built drawings ❑Complies Requirement will be met. [F1713 submitted within 90 days of system ❑Does Not acceptance. ',❑Not Observable i ❑Not Applicable 6.7.2.2 Furnished O&M manuals for HVAC ❑Complies Requirement will be met. [F1813 systems within 90 days of system ❑Does Not acceptance. ❑Not Observable ❑Not Applicable 6.7.2.3 An air and/or hydronic system ❑Complies Exception: Requirement does not apply. [F19]1 balancing report is provided for HVAC ❑Does Not [ systems serving zones >5,000 ft2 of ❑Not Observable conditioned area. ❑Not Applicable 6.7.2.4 -- ....---- - - HVAC control systems have been -- ❑Complies ----- — ---- -- — -- -- --- Requirement will be met. [FI10]1 tested to ensure proper operation, ❑Does Not calibration and adjustment of controls. ❑Not Observable ❑Not Applicable 7.4.4.3 Public lavatory faucet water ❑Complies Requirement will be met. [FI11]3 - temperature <=110°F. ❑Does Not ❑Not Observable ❑Not Applicable 7AAA Controls are installed that limit the ❑Complies Requirement will be met. [F112]3 operation of a recirculation pump ❑Does Not j installed to maintain temperature of a ❑Not Observable ( storage tank. I ❑Not Applicable '— — —— 8.7.1 -- --- ---- — — ----- Furnished as -built drawings for - - - — --- -- — ❑Complies — - — ---- --- --- --------- --- - — --- Requirement will be met. [FI16]3 electric power systems within 30 days ❑Does Not of system acceptance. ❑Not Observable ❑Not Applicable --�_..- 8.7.2 ——----- ------- - --- - --- — --- -- Furnished O&M instructions for - — -- ----- --- ❑Complies ------- ----- - --- — -- - -- - — Requirement will be met. [FI17]3 systems and equipment to the ❑Does Not building owner or designated ❑Not Observable representative. , ❑Not Applicable - ----- 9.2.2.3 - - -- --- -- - - — -- — -- --- - .... -= Interior installed lamp and fixture - - - — -------------- ❑Complies — ------ -- — — — --- ---- See the interior Lighting fixture schedule for values. [17118]1 lighting power is consistent with what❑Does Not is shown on the approved lighting ❑Not Observable plans, demonstrating proposed watts are less than or equal to allowed ❑Not Applicable watts. 1 ;Nigh Impact (Tier 1) �2 Medium Impact (Tier 2) �3 Low -Impact (Tier 3) j Project Title: Freddy's Frozen Custard Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Report date: 11/29/18 Page 10 of 12 Section # Final Inspection Complies? Comments/Assumptions & Rea.l® 9.4.5 Exterior lighting power is consistent ❑Complies [FI19]1 with what is shown on the approved ❑Does Not lighting plans, demonstrating proposed watts are less than or equal ❑Not Observable to allowed watts. ❑Not Applicable 6.4.3.2 Temperature controls have setpplies [1`120]1 overlap restrictions. ❑Does Not ❑Not Observable ❑Not Applicable See the Exterior Lighting fixture schedule for values. Requirement will be met. 6.4.3.3.1 HVAC systems equipped with at least ❑Complies Requirement will be met. [FI21]1 one automatic shutdown control. ❑Does Not ❑Not Observable'. ❑Not Applicable .... __...._...._................ .......... ................ ............ ...................... ............................ ................ .......... ........ .............. .::......._............................................. ._............... _.;........... ............ ............. ...... ................ .......... ._........................ ........... 6.4.3.3.2 Setback controls allow automatic ❑Complies Requirement will be met. [F122]1 restart and temporary operation as ❑Does Not required for maintenance. '❑Not Observable' ❑Not Applicable Additional Comments/Assumptions: 1 :High Impact (Tier 1) ; 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Freddy's Frozen Custard Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Report date: 11/29/18 Page 11 of 12 Project Title: Freddy's Frozen Custard Data filename: N:\2018\18662\Energy Report\18662 comcheck.cck Report date: 11/29/18 Page 12 of 12