Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
18662P-P1
PLUMBING SYMBOLS 7]IWTirFIZrF7B49Ira [ar9 44NalIII 7J•]= Waaaaaaa SOIL AND WASTE PIPING ABOVE GRADE —IGId-H SOIL AND WASTE PIPING TO 6RB45E INTERCEPTOR Q —F5T-H STORM PIPING BELOW GRADE Q STORM PIPING ABOVE GRADE —�� STORM OVERFLOW PIPING ABOVE GRADE ky rr —V — SANITARY VENT PIPING ABOVE GRADE I --V -- SANITARY VENT PIPING BELOW GRADE I -- DOMESTIC GOLD WATER PIPING ll� 24"m 11 Y SAMPLE ---- DOMESTIC HOT WATER PIPING `MANHOLE —D— EQUIPMENT DRAIN LINE INV. EL. = 51,150' ` —6— &A5 PIPING \ INV. EL. = 580.SO —F— FIRE LINE YYY�. 2 6" —G— POWER WASHER CONDUIT P6G0 —G-- POWER WASHER CONDUIT UNDERFLOOR ! D PIPING TURNING DOWN C _V 2-1PING �0 PITURNIN6 UP 1T TEE TOP CONNECTION 61 bIH— UNION 1,5006AL. BACKFLOW FREVENTER C 1 FCC 12 FLOOR GLEAN OUT WCO r— WALL GLEAN OUT FPO FLOOR DRAIN 6' INV. FIL = 551.00 ~ VALVE 6G0 6R� SOLENOID VALVE 4 PRESSURE REGULATOR 3 CHECK VALVE ® MATCH MARKS ON FLUMBIN6 RISER DIAGRAM I.E. INVERT ELEVATION OF PIPE ALL TURNS IN PVC CONDUIT SHALL BE "SWEEPING ELBOWS^ WITH NO LE55 THAN 24" RADIUS. f2L4'MINILING LINEL — SODA CHASE PROVIDED AND INSTALLED BY — PLUMBIN6 CONTRACTOR, OTHER TRADES TO PROVIDE SODA LINES FOR INSTALLATION OF SODA SYSTEM BY PURVEYOR, COORDINATE EXACT SIZE AND LOCATION OF GEILIN6 EASIW45H PENETRATIONS AND CHASE REQUIREMENTS WITH CABINET PURVEYOR. SODA CHASE DETAIL CO L SCALE: NONE PLUMBING PLAN NOTES: 0 5EE CIVIL PLAN FOR CONTINUATION OF 4" 5ANITARY SEWER MAINTAIN MIN 56' COVER, 2O 4" WASTE LINE BELOW GRADE. MAINTAIN A MIN. OF 36" COVER. O4" GREASE WASTE LINE BELOW GRADE. MAINTAIN A MIN. OF 56" COVER. O PROVIDE VENT THROUGH ROOF. EXTEND UP TO PARAPET HEIGHT. FLASH AS REQUIRED TO 5EAL PENETRATION WEATHER TIGHT. VERIFY 10'-0" GLEARANGE FROM ALL OUTDOOR AIR INTAKES. O CONNECT (3) 2" COFFER DRAINS FROM 3-COMPARTMENT SINK AND ROUTE TO FLOOR SINK WITH AN AIR 6AP. LOCATE FLOOR SINK IN ACCESSIBLE LOCATION. SEE DETAIL ON PS. 6O ROUTE DRAIN FROM ICE MACHINE TO TRENCH DRAIN WITH AIR AN 6AP, AND PER THE MANUFACTURERS REQUIREMENTS. OPROVIDE 1" COPPER CONDENSATE DRAIN WITH AIR 6AP FROM WALK-IN COOLER/FREEZER COIL TO GDB A5 DETAILED AND A5 REQUIRED BY WALK IN COOLER/FREEZER MANUFACTURER. COORDINATE WITH EC, FOR HEAT TRACING, OPROVIDE 3" FVG CHASE WITH LONG SWEEP ELBOWS FOR REFRIGERATION LINES IN WALL. ROUTE UP TO THROUGH ROOF AND EXIT THROU6H PARAFET WALL WHERE LOCATED ON EXTERIOR WALL SEAL PENETRATION WEATHER TIGHT. SEE SHEET Al FOR DETAIL. O ROUTE DRAIN FROM RPZ BFP TO FLOOR SINK WITH AIR 6AP. 10 PROVIDE 1" DRAIN PIPE FROM DRINK STATIONS THROUGH WALL TO FLOOR SINK. THERE ARE TO BE NO JOINTS INSIDE THE WALL. 11 ROUTE DRAIN FROM WATER FILTER TO FLOOR SINK WITH AN AIR 6AP AS REQUIRED. 12 ROUTE HER D15CHAR6E PIPING TO FLOOR SINK AND DISCHARGE WITH AIR 6AP AS REQUIRED. 13 ROUTE 1-y" DRAIN FROM SINK TO FLOOR SINK WITH AN AIR 6AP. 14 6"d) SCHEDULE 40 PVC PIPE ABOVE GEILIN6 FOR THE SODA LINES. PROVIDE 1-01,1651"k ELBOWS WITH 24" RADIUS. REFER TO DETAIL. 15 PROVIDE 3" P/G FLUE AND COMBUSTION AIR INTAKE PIPE FOR HOT WATER HEATER THROUGH ROOF. PROVIDE MANUFACTURER'S TERMINATION KIT. SEAL PENETRATION WFATHERTI6HT. VERIFY 10'-O" CLEARANCE FROM ALL OUTDOOR AIR INTAKES. 16 ROUTE 2" DRAIN FROM PRE RINSE SINK TO FLOOR SINK AND DISCHARGE WITH AIR 6AP AS REQUIRED. 3 CONNECT WASTE AND VENT PIPING TO 6REA5E INTERCEPTOR A5 DETAILED AND A5 REQUIRED BY LOCAL JURISDICTION, LOCATE IN 6RA55Y AREA BEHIND BUILDIN6. SEE CIVIL DRAWINGS FOR DETAIL5 AND l LOCATION. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Camel dVT� lmnrJnelJAl_ DATE: \\ 04/03/19 n FRE ER mililmIx OFFICE L1 HVIC. �v C HALL n Cn FCC C 4" All14 C 4 I �. t STORAGE FS n L 1 1 __ - 1 L 1 145 PLUMBING PLAN NOTES (CONT.): 18 PROVIDE A 2"(1) SCHEDULE 40 Il ELECTRICAL CONDUIT FROM THE PRESSURE WASHER UP ABOVE THE GEI1-I1,16, ALONG THE STRUCTURE TO THE OUTLET BOX AS REQUIRED BY THE MANUFACTURER. UTILIZE LONG SWEEP q00 ELBOWS. COORDINATE WITH EASIWASH SUPPLIER FOR EXACT LOCATION. 19 CONNECT DRAIN TO DIPPER WELL AND ROUTE TO FLOOR SINK WITH AN AIR 6AP, IF DIPPER WELL IS REQUIRED. ©0 CENTER OF HAND SINK TO BE 10" FROM CORNER OF WALL. 21 PROVIDE A 2"0 SCHEDULE 40 PVG ELECTRICAL CONDUIT UNDERFLOOR FROM THE PRESSURE WASHER AREA TO THE OUTLET BOX AS DETAILED AND AS REQUIRED BY THE MANFUAGTURER. UTILIZE L01,16 SWEEP q00 ELBOWS. COORDINATE WITH EA51WA5H SUPPLIER FOR EXACT LOCATION. 22 ROUTE 3/" GALVANIZED PIPE DOWN WALL AND STUB 12" AFF FOR FRYER. COORDINATE CONNECTION WITH EQUIPMENT MANUFACTURER. ROUTE PIPING WITH SLOPE DOWN TOWARD OIL TANK. ?3 ROUTE 3/" GALVANIZED PIPE DOWN FROM GEILIN6 SPACE AND STUB 12" BELOW GEILIN6 FOR OIL easiwasf7 Bring 2" Schedule 40 roLE<�„ErEMs . 2"x6" or 2"x8' througgh ceiling mounted flush to the inside wall Stud and stop at the top of the box Underground w/Stainless Steel Enclosure Preplumb Instructions ----- --Hole for control cable X "u,",; ,s em-- an^ or - - -Hole for pressure hose e "�-''m°°= r•W. tal Installer will "fish" hose and control cable thru the holes and connect with 90 deg �. elbow ;AW""As"a ,,,randar l ..ap seek Bring 2" Schedule 40 from under round with under onl one elbow anrYstopatthegbottom the box of J DINING VEST@ it it it it ih ih ih it it it it i4 i4 i4 n n n a n ih ih ih n it it it it ih ih ih n II II II II PI PI PI �IJ it it it yl it it it iy a a n yl it it it li ql II T�� it Iu I it Iu I n Iu I it IuI IrJ III II _J II ' A be -- ALL FLUMBIN6 VENTS ON ROOF SHALL EXTEND TO TOP OF PARAPET. an iq— a CUSTARD \ FP 3 FGO 6RY--II.r.l_II IL 0 0 0 µ i0 II � _dull li ` - °tiININ SERVICE J PLAN ;, PLUMBING WASTE AND VENT FLOOR PLAN \ _ SCALE: 1/4" = 1'-0" FFE = 555 CO FINISHED CEILING PVC CONDUIT TO EXTEND ABOVE FFINISHED CEILING WITH NO ADDITIONAL FITTINGS AT TOP 45' ELBOW AT EXIT - FROM WALL FOR ALL PVC CONDUIT REFRIGERATION AND SODA CONDUIT IN WALL DETAIL NO SCALE PLUMBING GENERAL NOTES: 1. INSTALL ALL PIPE, ETC. AS HIGH AS POSSIBLE. 2. COORDINATE ALL WORK WITH OTHER TRADES AND EXISTING CONDITIONS AS REQUIRED TO PROPERLY INSTALL ALL SYSTEMS AS INTENDED, WITHIN THE CONFINES OF THE SPACES AVAILABLE, AND WITHOUT INTERFERENCES. 3. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS AND MOUNTING HEIGHTS OF FIXTURES. 4. REFER TO ARGHITEGTURAL S STRUCTURAL DRAWINGS FOR REQUIREMENT5 FOR SUPPORTING PIPING, EQUIPMENT, ETC. FROM THE STRUCTURE. PROVIDE ADDITIONAL STEEL AS REQUIRED TO PROPERLY SUPPORT SYSTEMS FROM THE STRUCTURE, 5. PROVIDE 1" SCHEDULE 40 PVC CONDENSATE DRAIN PIPE FOR EACH ROOFTOP UNIT LAID DIRECTLY ON ROOF TO NEAREST ROOF DRAIN. PROVIDE WATER TRAP AND GLEAN OUTS AS DETAILED, SECURE PVC PIPE TO DRAIN WITH NYLON STRAP, 6. NO PIPING SHALL BE ROUTED OVER THE TOP OF ELECTRICAL PANELS. nA .nq ads been dawned p he rti an total d Wayne byte Wool N red and is all Wr use an to added Won Purtan, RENGINEERS INCORPORATED 5720 Reeder Shawn ee, ass. 66203 (913)262-17M W 00 N :E z OC C ww/ z � ti U W UL WINTER ARCHITECTS 1024 EAST FIRST STREET WICHITA, KS. 67214 PH. 316-267-7142 DATE m SHEET NO. P1