HomeMy WebLinkAbout2018113-Freddys-Carmel, IN-P4-PLUMBING1r 1
p�p 1 1 m
1
12 22 WALK-IN COOLER EVAPORATOR
A I A FLOOR SINK, PC TO EXTEND INDIRECT WASTE DNE FROM(2)WA -N EVAPORATORS TO
WALLDRNN
F-7-1 ICE MACHINE - (BY OTHERS)
A I 1IT' FILTERED CW, 60"AFF, VERIFY ALL ROUGH -IN REQUIREMENTS
BBICE MACHINE&BIN - (BY OTHERS)
FLOOR SINK, PC TO EXTEND INDIRECT WASTE LINES FROM ICE MACHINE, ICE BIN, AND
WATER FILTER
7.2 FLOOR TROUGH - (BY OTHERS)
A 3" DIRECT WASTE, ADVANCE TABCO FTG-1236 OR APPROVED EQUAL, PC TO VERIFY ALL
MOP SINK
A
I A I
T'DIRECT WASTE, STUB UP
9.1 1
SERVICE FAUCET
A I
11T CW, WWE
9.1
FkqB
SERVICE FAUCET
1IT'HW, WARE
M10 DISHWASHER -(BY OTHERS)
A 3I4" HW(MIN. 120 DEG, F), 66"WE- VERIFY ALL
10 1 DISHWASHER
B I FLOOR SINK, PC TO EXTEND INDIRECT WASTE FROM DISHWASHER, SODA DISPENSER, AND
ICE MACHINE TO FLOOR SINK - VERIFY ALL ROUGH -IN REQUIREMENTS
P11 SOILED DISHTABLE(PRE-RINSE SINK)
A FLOOR SINK, PC TO EXTEND INDIRECT WASTE TO FLOOR SINK
F111 PRERINSEUNIT
A 1IT CW, @14"AFF
11.1 PRERINSEUNIT
B 1I2'HW, @14'AFF
14 PDT &PAN SINK
A I Z' INDIRECT WASTE TO FLOOR SINK, PER LOCAL CODES
F14_.11 PRERINSE UNIT WI ADPA-FAUCET
A 1I2'CW,14'AFF
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
CiityUG�F Cartn�ed
�VT�VI�ORMAWML
DATE: \\ 04/03/19
PLUMBING REQUIREMENTS
14.1 PRE -RINSE UNIT WIADDA-FAUCET
B 1I2'HW,1P'AFF
�M HAND SINKS
A 1I2'CIA, 14" WE TWO LOCATIONS)
[M HAND SINKS
B 111THW, 14" AFF (TWO LOCATIONS)
M HAND SINKS
C 1-1I2' DIRECT WASTE, HEWS TWO LOCATIONS)
1] BAG-N-BOX-(BY OTHERS)
A 1I2'FILTEREDCW,66'AFP VERIFYALLROUGH-IN REQUIREMENTS
[M LOAD CENTER TABLE
A I FLOOR SINK, PC TO EXTEND INDIRECT WASTE FROM COLD PAN TO FLOOR SINK
[M WORKTABLE W. SINK
A 1 2" INDIRECT WASTE TO FLOOR SINK, PER LOCAL CODES
26.1 FAUCET
A 1I2-CW, 14" WE
F28-11 FAUCET
B 1IT'HW.14"AFF
eAEWER SYSTEM
3I4" GAS (240,000 BTU), 12" AFF, 12' TO 14" W.C. RECOMMENDED AT MANIFOLD TO ENSURE T' WC,
GAS PRESSURE REQUIRED TO FRYER CONNECTION, ADAPT TO 1"GAS HOSE PROVIDED BY SEC
3_81 SODA DISPENSER -(BY OTHERS)
A I FLOOR SINK, PC TO EXTEND INDIRECT WASTE ONES FROM AND ICE BIN AND SODA DISPENSER
THROUGH WALLTO FLOOR SINK- VERIFY ROUGH -IN REQUIREMENTS WITH PURVEYOR
40 ICED TEA BREWER - (BY OTHERS)
A 1I2-FILTERED CW, 44" AFF -VERIFY ALL ROUGH -IN REQUIREMENTS
= HAND SINK
A 1-11Z' DIRECT WASTE, 14" WE
MMi
�..��-III
�I ■■ IIViI
11
F41-11 FAUCET
A 1IZ'CW,18'AFF
F41-11 FAUCET
B 1 1I2'HW, 18"AFF
AeSERVICE SINK
FLOOR SINK, PC TO EXTEND INDIRECT WASTE TO FLOOR SINK
AM-11 FAUCET
A I 1ITCIA, 18" AFF
F44-11 FAUCET
B 1I2'HW, 18"AFF
46 1 CUSTARD MACHINE
A 1 1I2 CW, 24'ARE
46 CUSTARD MACHINE -(BY OTHERS)
10B INDIRECT WASTE... PLUMBING CONTRACTOR- EXTEND INDIRECT WASTE TO FLOOR SINK,
VERIFY ALL ROUGH -IN REQUIREMENTS
49 ICE MACHINE -(BY OTHERS)
A 1I2' FILTERED CW, ]2'AFF-VERIFY ALL ROUGH -IN REQUIREMENTS
4_91 ICE MACHINE -(BY OTHERS)
`BJ INDIRECT WASTE, PC TO EXTEND INDIRECT WASTE FROM ICE MACHINE AND SODA DISPENSER
THROUGH WALL TO FLOOR SINK- VERIFY ALL ROUGH -IN CONNECTIONS
F74-31 MUA UNIT (NOT SHOWN)
A 3I4"GAS (192,559 BTU), REFER TO MFR'S SHOP DRAWINGS FOR DETAILS
778 WATER FILTER
A 3I4" C.W., MNPT, S.O. 99' AFF, RUN FILTERED WATER LINE TO: (2) ICE MAKERS, (2) SODA
DISPENSERS, CARBONATOR(S), AND (1) TEA BREWER... P.C. TO PROVIDE AND INSTALL A BY
PASS VALVE ON OUTGOING SIDE OF FILTER SYSTEM - VERIFY WITH MANUFACTURER'S INSTALL
INSTRUCTIONS
PLUMBING NOTES
1. THESE DRAWIN GS ARE TO BE USED AS AN INSTRUMENT OF
REFERENCE BY ALL OTHER TRADES AND CONTRACTORS. ALL
TRADES SHALL VERIFY THE INFORMATION AS INDICATED ON THESE
PLANS,
2, DIMENSIONS AND REQUIREMENTS FOR ALL EQUIPMENT THAT IS
LISTED AS EXISTING, PROVIDED BY OTHERS OR PROVIDED BY
OWNER, MUST BE VERIFIED WITH THE APPROPRIATE PARTIES.
3, ALL LOCAL, STATE AND NATIONAL CODES SHALL APPLY.
4, THESE UTILITY REQUIREMENT DRAWINGS INDICATE THE UTILITY AND
LOCATION OF REQUIREMENTS BASED ON THE EQUIPMENT SPECIFIED.
6 ALL EQUIPMENT SHALL BE PLUMBED IN STRICT CONFORMANCE WITH
THE MANUFACTURER'S INSTRUCTIONS ANDIOR SHOP DRAWINGS.
6, UNLESS OTHERWISE NOTED, ALL DIMENSIONS SHOWN ON THIS PLAN
ARE FROM THE FINISHED FLOOR, CEILING, WALLS OR COLUMN
CENTERLINES TO THE CENTERLINE OF THE ROUGH -INS.
]. ALL PLUMBING CONNECTIONS SHALL BE EXTENDED AND
INTERCONNECTED TO CONNECTION POINTS ON THE EQUIPMENT BY
OTHERS. UNLESS SPECIFIED, ALL HARDWARE REQUIRED FOR THESE
CONNECTIONS SHALL BE SUPPLIED BY THE PLUMBING CONTRACTOR.
& SURFACE MOUNTED PIPING WILL NOT BE ALLOWED. ALL PIPING
SHALL BE EXTENDED THROUGH AND OUT OF BUILDING WALLS WHERE
POSSIBLE. MERE SURFACE MOUNTED PLUMBING IS UNAVOIDABLE,
IT MUST BE COORDINATED WITH HOCKENBERGS.
9, ROUGH -INS OUT OF FLOOR SHOULD BE STUBBED UP 4"ABOVE
FINISHED FLOOR AND BROUGHT TO THE REQUIRED HEIGHT AFTER
EQUIPMENT IS SET IN PLACE.
10, ONLY COMPONENTS SUPPLIED STANDARD BY THE MANUFACTURER
AREINCLUDED ALL HARDWARE REQUIRED FOR CONNECTIONS
SHALL BE SUPPLIED BY THE PLUMBING CONTRACTOR. SUCH
COMPONENTS INCLUDE BUT ARE NOT LIMITED TO, SHUT -OFFS,
PRESSURE REGULATORS, VACUUM BREAKERS, P-TRAPS, BACKFLOW
PREVENTERS, ETC.
11. PLUMBING CONTRACTOR TO VERIFY THAT ALL APPLIANCES ARE
SUPPLIED WITH APPROPRIATE GAS PRESSURE AND THAT ANY
VARIANCES IN GAS PRESSURE BE CLEARLY IDENTIFIED AND
BROUGHT TO THE IMMEDIATE ATTENTION OF HOCKENBERGS.
12, ALL INDIRECT WASTE AND CONDENSATE DRAIN LINES SHALL BE
EXTENDED FROM EQUIPMENT FITTINGS TO APPROPRIATE DRAINS AS
CODES REQUIRE, BY OTHERS.
13. UNLESS OTHERWISE SPECIFIED, HOT WATER SUPPLIED TO BOOSTER
HEATER SHALL BE A MINIMUM TEMPERATURE OF 140' F.
14, PLUMBING CONTRACTOR TO VERIFY WATER TEMPERATURE
REQUIREMENTS FOR EACH PIECE OF EQUIPMENT. ANY
DISCREPANCY BETWEEN MANUFACTURER'S REQUIREMENTS AND
TEMPERATURES PROVIDED SHALL BE CLEARLY IDENTIFIED AND
BROUGHT TO THE IMMEDIATE ATTENTION OF HOCKENBERGS.
15. PLUMBING CONTRACTOR TO PROVIDE INSULATED HOT WATER
CONNECTIONS BETWEEN BOOSTER HEATER AND DISHMACHINE.
16. UNLESS OTHERWISE SPECIFIED BY CODE, ALL DRAIN LINES FOR
DI SPOSERS SHALL BY-PASS GREASE INTERCEPTORS.
17, NO GENERAL PURPOSE FLOOR MAINS ARE SHOWN ON THESE
PLANS. THE SPECIFICATION OF THOSE DRAINS, AS WELL AS THE
DESIGN FOR REQUIRED SLOPES IN THE FLOOR TO THOSE MAINS,
SHALL BE THE RESPONSIBILITY OF THE ARCHITECT ANDIOR
ENGINEERS.
PLUMBING SYMBOLS
HEM NUMIRR PLUMBIN G ROU GH-IN NOTE
ei CONNECHONNUMBEA (SEE SCHEDULE)
T
•
COLD WATER CONNECTION
HOT WATER CONNECTION
HOT WATER CONNECTION -140°MINIMUM
FLOOR SINK
®
FLOOR SINK-H&F COVER
FLOOR MAIN
®
FUNNEL FLOOR DRAIN
4
FILTERED COLD WATER
�----
INDIRECT MAIN
0
DIRECT DRAIN
0
GAS
ELECT. OUTLET FOR
DRAIN LINE HEAT
TAPE (FREEZERS
ONLY), MOUNTED
COOLERFREEZER
INSIDEOF WALWIN
COIL
(BY EG.). SEE SHEET
K2 FOR LOCATION
1I2' SLOPE PER FOOT (MIN.),
RUN TIGHT TO WALL & SECURE
LOCATE "P" TRAP
TO WALL
OUTSIDE
HEATER TAPE WRAPPED AROUND
WALKJNEBOX
DEAIN(WALK-IN FREEZER ONLY)
(FREEZERS ONLY) ELEC. HEAT
TAPE SPIRALED AND TAPED ON
FREEZER MAIN LINE BEFORE
VAIR GAP ��
'
APPLYING INSULATION BY OTHERS
LL
FLOOR SINK OR FLOOR OF
WIFUNNEL (PER LOCAL CODE)
WALK-IN DRAIN
LINE DETAIL
NOT TO SCALE
Wpu ThMark
Foodsacice Equipment, Supplies and Drsign
HOCKENBERGS
14603 W 112th Street
Lenexa, KS 66215
P 866.445.4999
tdmarkusa.com
This document contains
confidential information, is an
instrument of aprofessional
service, and the company of
Tril It shall not he used on
otter projects orfor the extension
of this project without TriMarOs
written approval.
Owner and all Contractors to
check and verify existing
dimensions and conditions in
the field before starling
construction and to notify
TriMark of any material or detail
changes.
REVISIONS
DATE NO. DESCRIPTION MADE
_V
0
f�
V )
U
Z
LU
O
I. L
N
L
LL
(D
L.I.
Q
V/
Z
LU
LU
'LU
00
100
LL
0
U
PLUMBING
REQUIREMENTS
PLAN
SHEET NUMBER'.
PM4
THIS WCUMENT WAS ORIGINALLY PRINTED ON A2P x36' SIM SHEET