HomeMy WebLinkAbout03-Carmel IN-SR1-SR1pAy®A:
SUBSURFACE 7NVESTIGATION&
'fix T Alt & Witzig Engineering, Inc.
TABLE OF CONTENTS
SUBSURFACE INVESTIGATION
GEOTECHNICAL RECOALMENDATTONS
4105 West 99th Street. Indianapolis, hidiana•46032
AND
THE Di AND DETAILS
Ph(317)875-7000• Fact(317) 876-3705
SECTION PAGE
GEOTECH[NICAL RECOMMENDATIONS
DISCLOSED HEREIN ARE THE
Ex=SeE PROPERLY OF
MINTER ARCHITECTS INC AND
INTRODUCTION.................................................................................................................................. I
]INTRODUCTION
SHALL NOT BE COPIED OR
REPRODUCED IN MOLE M
October 31, 2018
IN PART WITHOUT ITS PRIOR
DESCRIPTION OF SITE...................................................................................................................... 2
General
WRITTEN CONSENT,
ICT, LLC
Dba Freddy's Froson Custard & Steakburgers
FIELDINVESTIGATION.........................................................................................._......................... 4
DAN WINTER. ARCHITECT
E. 146a Street
This report Presents the results of a subsurface investigntion performed far the proposed Freddy's
Cannel, Indiana 46033
LABORATORY INVESTIGATIONS......................................................................._......................... 6
Frozen Custard to be constructed an North Michigan Road in Carmel, Indiana. Our investigation was
Aton: Mr. Blake Epperson
conducted for ICf, LLC dba Freddy's Frozen Custard & Steakbmgers of Carmel, Indiana.
FREDDY'SFROZBNCUSTARD
SUBSURFACE CONDITIONS ............................................................................................................ 5
CARMBL, Mil
RE: Subsurface Investigation &
Authorization to perform this investigation was in the form of a proposal prepared by Alt & Wittig,
A&WPROJECTNO. 18/1
Geotecha ical Recommendations
GEOTECHNICAL DISCUSSION AND RECOMMENDATIONS.................................................. 7
Engineering, Inc. (Alt & Wilzig Proposal: 1810G022) and was accepted by Blake Epperson ofICT,
Freddy's Frozen Custard
Q
Carmel, Indiana
CONSTRUCTION CONSIDERATIONS ..... . ................................................................................... 13
LLC ribs Freddy's From Custard & Steakburgers.
Alt &Witzig File: 18IN0662
Dear � Epperson:g
STATEMENT OF LIMITATIONS..........................................................................._....................... 15
The scope of this Investigation included a review of geological
ogi maps of the area and a review of
I
geologic and related limpurpre;areconnaissance of the intermediate site; a subsurface exploration; field
Q
In compliance with your request, we have conducted a subsurface investigation and evaluation for the
APPENDIX
end laboratory testing; and mlmesering analysis and evaluation of the materials.
above referenced project It is our pleasure in ambient herewith one (1) copy of our repom
PREPARED BY.-
Recommended Specifications for Compacted Fills and Backfills
/ /\
Al WTIZIGENGMEERING,RYG
The purpose of this subsurface investigation was on determine [be various soils profile componemts,
Excavation Details in Unstable Material
The purpose of this subsurface invedigatimwa;todetermine the various soilsprofile components,
V
GEOTECI711TCALDIIZSION
the engineering characteristics of the subsurface materials, and to provide criteria for use by the design
mgincers in assessing the site for construction, preparation of site grading plans, and determination
Site Location Map
Boring Location Plan
the engineering characteristics of the subsurface materials, and to provide criteria for use in
0
of appropriate foundation types. A detailed discussion of our subsurface investigation results and
Boring Lugs
assessing the site for construction and evaluating subsurface conditions.
w/
LL
morarumendations are presented herein.
General Notes
We appreciated the to work with on this project Often, because of design and
nPPreci opportunity Ym Proj
Seismic Design Summary
Rep County
Custom Soil Resource Report for Hamilton Cow
A Phase I Envuumment Assessment was conducted in conjunction with this investigation and is
Z ,
construction derails that occur, questions arise comceming the soils conditions. H we can give funkier
presented under a separate cover. (Alt &Witzig Project No. 1 BIN0665).
Z Z
PREPARED FOR:
service
service in these matters, please contact us at your convenience.
ICI, LLC
y
1 J
N =U
DBA FREDDYWFROZENCUSTARD&STEAKRURGERS
very tody yoms,
CARMEL,EIT11"A
,rann"'Irnrryp.
/SSA Aft & Wh* Enghtesuft Ac.
I xrt3aozrz ��
LiSrATEOF ¢s
n Nicholas K. Hayes, Project Engineer
LL Z U
dial, p�vx'
�N �SA"ONAL
OCTOBER 31, 2018
Brian A Way P.E.
all
O� Subsurface 1wrimmisidon and Foundation Engineemg
clas®ni•eH,00su.•aNm ceio Conmurnon MaYn'a4 restingendingrecffon
1
Ah&WitzigFt1e:187N066I
Q
Ev®arise. Ft Wayne•rndimepolie.lereyeR. MvmaviWaw9A amQ loGuu EpVlranpenfalSerelee!
MW
Errs
Lim
DESCRIPTION OF SITE
Site IHstory
FIELD INVESTIGATION
Ground Surface Elevation
the southwest comerail
of the site was previously occupied by a single residence with a gravel
General
Ground surface elevations were not avoidable at the time of this report. All depths reported on the
Site Location
driveway. This simcturc was pension on the site until 2013. The atrial photograph below from
Boring logs are from the existing ground surface at the time of the drilling operations.
The site is located at 9701 North Michigan Road in Carmel, Indiana. The area may be located
Field investigations to determine the engineering characteristics ofthesubsurface materials included
usingthe Carmel, Indiana 7Ya Minute Topographic M in Section 7, Township 17 North and
Map P
2005 shows the location of the former structure.
a recomtaissance of the project site and performing eight 8 boring; located approximately as shown
Proj P B !;b () Bs nPPro Y
Range 3 East. The general vicinity of the site is indicated in the Site Location Map included in the
Fi 2: 2005 Aerial Photo ah
an the Baring Location Plan, performing standard penetration tests, and obtaining soil samples
,��ae
vs" pVfdOraad®
MD
Appendix of this report. An aerial photograph of the site from 2018 is presented below.
s�
spilt-spoom sampler for further laboratory testing. Thea apparent groundwater
remimed in the standard s ry & PP @o
�',rAq,
z'pIST
; ' E Fq '' f"it
Fr e1: 20lSAerial Photo a h
\\\
level at each boring location was also determined.
Sae AR19 00
Drilling and Semolina Procedures
�Srypr <"
5
\
The soil borings were drilled using struck -mounted drilling rig equipped with a rotary heed
Hollow -stem augers were used to advance the holes. The advancement of the borings was
temporarily stopped at regular intervals in order to perform standard penetration testa in
WINTER
Y
accordance with ASTM Procedure D-1586.
ARCHITECTS
t'
wad'
The standard penetration test involves driving a split spoon soil sampler into the ground by dropping
1024 EAST
FIRST STREET
a 140-pond hammer, thirty (30) inches. The member of hemmer drops required inadvance the
W I C H ITA, KS.
split -spoon sampler one (1) foot unto the and is defined as the standard penetration value. The soil
67214
samples retained in the split -spoor sampling device as a result of the penetration tests were obtained,
PH. 316-267-7142
1
classified, and labeled for further laboratory investigation.
PROJECT
ARCHITECT:
Lzj -
Water Level Measurements
RODGER BAKER
The apparent groundwater level at each boring location was measured during and upon completion
of the drilling operations.
SOIL
REPORT
t
These water level measurements consisted of observing the depth at which water was encomtered on
the drilling mds during the soil sampling procedure and measuring the depth to the top of any water
DATE
Site Description
following removal of the hollow stem augers. It should be noted that the groundwater level
11/7/2018
measuemen6 recorded m the individual Boring Lags in the Appendix of this report are accurate Only
The site is relatively flat with an estimated relief of less than two (2) feet across the site. Drainage
for the specific dates on which the measurements were performed It most be understood that the
is primarily to storm servers. The ground surface across the site during boring operations consisted of
groundwater levels will fluctuate throughout the year and the Boring Logs do not indicate these
gross. The approximate elevation of the site ranges between 883 feet in 885 feet.
fluctuations.
DRAWN BY:
RMW
2
3
4
5
Alt&Mali Fie: 18MW2
Alt& Mang Fie: I81N0662
Alt&Maig Fie: 18MW2
Alt& Wim'g Fie: I8M0662
DIN
RELEASE. FOR ............
SHEET NO.
Subject to compliance with all regulations
of State and local Codes
S R 1
City of Camel
yVT�tax�0pldsL
DATE: \\ 04/03/19