Loading...
HomeMy WebLinkAbout05-Carmel IN-SR3-SR35 Al, y-.. mlplli aN .a Mea�nA 4v Groundwater STATEMENT OF LBUTATIONS RECOMMENDED SPECIFICATIONS FOR COMPACTED FD,LS AND BACKFILL4 Groundwater levels taken during and upon Completion oftheboring operators; yielded meaMuonwr THE DESIGN AND DETAILS DISCLOSED HEREIN ARE THE as shallow as two (2) feet below the ground surface. The exact location of the water table may This report is solely fo the use of ICT, LLC dint Freddy's Frozen Ostard & Stu adrorgers, any fill shall be formed from material free of vegetable matter, rubbish, large rock, and other OF EXCLUSIVE PROPERTY INC.All ARCHITECTS C. AND fluctuate somewhat depending upon normal seasolm variations in precipitation and surface runoff reliance of this report b third es shall be at such s sole risk and ma not contain rep Y 1 lsdY' Y SHALL NOT BE COPIED OR SHALL MHOLE OR deleterious material. Prior m placement of fill, a sate le of the proposed fig material should be p p proP� INREPRODUCEDARTWT O PART ITS PRIOR sufficient information for purposes of other es fin other uses. This report shall Only be Pure parties rep Y W WRITTEN CONSRT. CONSENT. The Soil Survey ofHamdron County, fndraw indicates a seasonm high groundwater table as shallow presented in full and may not be used to support any other objectives than those set out in the scope submitted m Alt & Wilzig Engineering, Inc. for approval. The surface of each layer will he as the ground surface. Again, it should he noted that the groundwater level measurements recorded of work, except where written approved and consent are provided by ICT, LLC dba Freddy's approximately horizontal but will he provided with sufficient longitudinal and transverse slope m DAN N1NTR, MCNIIECT on the individual Boring Logs included m the appendix of this report, are accurate only for the dates Frozen Custard & Steakbmgers, and Alt & Wittig Engineering Inc. provide for nmoffof surface water from every point The fill material should be placed in layers not on which the measurements were performed. The exact location of the water table should he in exceed eight(8) inches in loose thickness and should be sprinkled with water as required to secure anticipated to fluctuate somewhat depending upon normal seasonal variations in precipitation and An inherent limitation of any geatechnical engineering study is that conclusions must be drawn on specified compactions. Each lays should be uniformly compacted by means of suitable equipment surface nmoff. the basis of data collected at a limited number of discrete locations. The geoteschnical parameters of the type required by the materials composing the fill. Under no circumstances should a bulldozer provided in this report were developed from the information obtained from the test borings that depict cor similar madedvehicles be used as compacting equipment. Material containing an excess of water Q Duemthe potential forahigh groundwater level, some difficulty during excavation and constructionnsubsurface conditions onlyatthew specific locations and onthe particular date indicated ontheboring so the speinfied compaction limits cannot be attained should be spread and driedto amoismre content of the proposed shallow mundatiors is anticipated ifconstruction praceeds during the wetter portions logs. Soil conditions a other locations may differ from conditions encountered a these boring thin will permit proper compaction. AD fill should be compacted m the specified percent of the ofthe year (typically Novemberm ApN). In addition, depending upon the weather conditions during locations and groundwater levels shell he expected m vary with time. The nature and extent of maximum density obtained in accordance with ASTM density Test D-1557 (95 percent of maximum construction, seepage from surface nmoffmay occur. Since these foundation materials tend to soften variations between the borings may not become evident until the course ofconsNmction. dry density below the base of flooding elevation, 93 percent of maximum dry density beneath Boor when exposed m free water, every effort should be made to keep the excavations dry should herein is in detail form APPENDIX slabs and pavements). Should the results of the in -place density tests indicate that the specified V groundwater be encountered A gravity drainage system, sump pumps, in other conventional minor The exploration and analysis reported considered sufficient and scope in a compaction limes are not obtained, the areas repmesemed by such tests should be reworked and dewatering procedures should be sufficient for this purpose. It is also recommended that all concrete reasonable basis for final design. The recemmundations submitted are based on the available soil rotested as required until the specified limits are reached. = 0 for footings be placed the same day that the individual foundatim excavations are made. information and assumed design details enumerated in this report. If actual design details differ ! , Fly v LL rm from those specified in this report, this information should be brought to attention of Alt & The groundwater may else cause pumping of the subgmde during the wet season. Therefore, Wittig Engineering, Inc. so that it may be determined if changes in the foundation �J concocting the water control system (ditches and/or underdmins) as early as possible in the mco mmmdatiom are required Ifdevintions from the noted subsurface conditions are encountered ` Q Z construction sequence and limiting construction traffic in specific areas across the site will help in during contraction, they should also be brought to the attention of Alt & Wilzig Engineering, Inc. W V mivimiu problems within the building pad and roadway areas. 'V A 1 T Jw i U � Q U. z U ( o 14 15 Q Alt&Wildg File: 181N0662 Ali Wildg File: 181N0662 LU BORING LOG SITE LOCATION MAP Lim A91fa M1YdagEnpirlasirl¢far CUENT ICT. LLC der FraddYs Frown Custard B SrYmul a NOR B4 UNDERCUT EXCAVATION FOR ISOLATED FOOTINGS IN UNSTABLE MATERIALS j - £U' % 'J + p p _ --. .. <` _ 1 - T _ PROJECT NAME Fracases Frown Custard ALTSWMGMLES 1eINOW muI arum "� r1�� (•- `\ PROJECTLorcus Cemel.IN �) 1 f. I t• —� .-> ~ DRILLING and SAMPLING INFORIMnON rmaia ``\ oNe wedid 1D/1i Hammer Wr 140 w.Cl-k Q,jml f/i0/Vj®?� T��,<•"'irt`�'g ur.mMmr wi NW! Mimi ��� ^ �� ~+ ~ O j _ — i� •BI wJ� 1 • \\ nets CanMaled 1NigNg Hemmer pop 901n. TEST DATA Bodrg Metlmd NSA Sporn Sampler OD 2 In. jQ y�'�N iwiRLL wwsr.s V order C. Pelemmn RgTypde CME453a1d AR19 DO —I—� \\ 555 R g s8 ;TA E elwsF� Ph w-wc.a,a ar6c`�If 'r5r ', i.. y - — — ... - 0.. • \ .. \\ STRATA MLa lRGnoN a !i 9C. udsa bAh H11=5y,0 .� ��. r Z as m \ soy `, yp 15 HEV. a11RFOLE EIEVATON {y5� 55gg F�. $-Ei E3 �syy {33,%y yj 2. �ry ��. l9l alit]e' •Y i USGS Tonootaphic Mao: �p }6 d� di d O Ot5 ¢G T aL OA Carmel Quadrangle -, Township: T 17 N. \ `\ WINTER ,} ♦ Range: R 3 E s P.ARCHITECTS TS- \ SS a 03 ties 1 n 41 WE aura. wi � V tl \ K'a� r o Addition Iz - Section:\I wE, 1024 EAST - _ aTg \ ,� Brown and Grey Silly Remy CLAY FIRST STREET MASS EXCAVATION FOR FOOTINGS IN UNSTABLE MATERIALS WIC p rule _ \\ G \ W t _ \\ I s BB n z WICHITA, KS. 67214 2 y 7.0 PH. 316-267-7142 3 SS 9 05 12.0 PROJECT ...a —'WE on WILL _ F - - �� "�a T n 1g as n za 122 ARCHITECT: a VUEi-- -\ RODGER BAKER g _. ••• , TY�- - Brown Siaya YxiNaerdaeem `°`l' Y ,wnw..p,awa.awc,wa.,n,. SOIL Ptri, REPORT IS. 1 .� - •1 \ •� t6 88 30 5 w • n + I .- e,o6n. w•tsANO Hen DATE Eta of Boring M fared -RA�. I ...a •L m' s, 11/7/2018 wno.mwwr.uaoa a� 77' SmIs1iM=1,00DaM• "- e'7• Undercut Detail for Footing Excavation in Unstable Material PROJECT: Freddy's Frozen Custard 4W BORING LOCATION PLAN LOCATION: Carmel, Indiana CLIENT: ICT,LLC Alf& W'1dg EE ores W. WShm fredd1'LOCATION: PROJECT: Freddy's Frozen Custard PROJECT NAME: Fr 's Frozen Custard I1Nanalm w Carmel, Indiana Alt& tinodg EngineedngIna FIA No.: 181N0882 rSEane7s2es EA LOCATION: Carmel, lntliana ommeraw Alt&Wirzig P.ngirsering,Iw. samdM rope Gwmwater eanm MrnmA6W DRAWN BY: CLIENT: ICT,LLC etas W, yY Lren Cwmd,, rN 46632 TEL ol»s75-Ids-FAX nun 876-3705 a^""'°Lnan PREPARED FOR: ICT, LLC owmar.o 4105wur99m Sew-CurEcLm46032 Sus -Owen able Sram 0Dulre DduYlg 9L N&1-mew Sam Assers ST- Provided Sway rum VAtcayun 5a cFA-Camnuos"gint 848 RMW A&W File No.: 18IND662 mwaldm3 PROJECT NO: 181N0862 T°°rhef' 675-T0m•P¢I317)976-3005 CA- Cmfinuous Flight Mpp DO-DIiK19Ceeng RC-Rocscoe MD -Mud Dlrng Lawlixised. 7171018 MarM CHECKED BY: CU -Carboni D W leaf Mpolflm: 1tl31120fa 11:49 AM CT - culdii Tum Page 1 M 1 RELEASED FOR CONSTRUCTION SHEET N0. Subject to compliance with all regulations of State and [Deal Codes S R 3 City of Carmel �vm�tlDwmktDAaL DATE: \ 04/03/19