HomeMy WebLinkAbout36-Carmel IN-A11-A11BOTTOM SIDE CE IP^n
PLYWOOD DECK
II
II I
NEW 2x8 JETS 0 16"
O.C. MAX w/SIMPSON
LUS28 EA. END
?HE-FAB WOOD
TRUSSES —
5/8" GYP. BD.
TYPE FIN.
PER PLAN AND
HEADER REF.
SCHEDL.
STRUCTURAL
COME 2x8 LEDGER
w/(4) 16d 0 EA.
CONT CAULK,
STUD.
TYP. AT WOW
PERIMETER
DARK BRONZE ALUM. STOREFRONT
CONTINUOUS
FRAMES w/ THERMAL BREAK & 1"
FIRE BLOCKING -
INSET LOW "E" GLAZING W/ GREY
TINTED EXTERIOR PANE (CENTER
WOW. FRAME IN CENTER OF METAL
STUD WALL BELOW)
VESTIBULE
DINING
OCOOLER
CONT CAULK, TYP. AT
WDW INTERIOR PERIMETER
SOLID SURFACE
05/8" GYP.
BOARD FINISH
ix WO. TRIM PLO. P-3
PER PLAN AND
SCHEDULET.O
WALL A
EL =1p4-O Y
EL.
5/B° GYP.
5/8" GYP. BOARD FINISH
NO WALL
FINISH
BOARD FINISH
r PER PLAN AND SCHEDULE
PER PLAN AND
SCHEDULE
I
AXE WOOD STUDS
0 16" O.C.
FOR WALLS RUNNING
- - - - - - - - T_r—
PARALLEL WITH TRUSSES,
BOTTOM SIDE OF ROOF
ATTACH TOP TRACK TO L BOTTOM SIDE OF ROOF
PLYWOOD DECK
2x BLOCKING AT PLYWOOD DECK
\
SIMPSON HTZ TRUSS CLIP ®
MAXIMUM 32" ON
48" O.C. MAX.
CENTER I I
PRF.-FAB WOOD
HOLD CONTINUOUS DBL. TOP
BOTTOM CHORDS OF SIMPSON HTZ TRUSS CLI
�P ®
TRUSSES —
PLATE DOWN (1 1/4' MAX.)
TRUSSES 48" O.C. MAX.
-
PRE-FAJ
WOOD TRUSSES
SUSPENDED 2'x4',
WSBAR GRID x4',
r SUSIF-BAR GRID x4
T-BAR GRID
SUSPENDED ACOUSTICAL
CEILING TILE - SEE
R.C.P. AND FINISH
SCHEDULE - INSTALL
PER ASTM C 635 &
ASTM C 636
2X4 WOOD STUDS
® 16" O.C.
HOLD CONTINUOUS
DBL. TOP PLATE
DOWN (1 1/4" MAX.)
CONTINUOUS
FIRE BLOCKING
OFFICE
5/8" GYP.
BOARD FINISH
PER PLAN AND
SCHEDULE —
SUSPENDED ACOUSTICAL SUSPENDED
CEILING TILE - SEE R.C.P. ACOUSTICAL
AND FINISH SCHEDULE - CEILING TILE -
INSTALL PER ASTM C 635 SEE R.C.P. AND
& ASTM C 636 FINISH SCHEDULE r
- INSTALL PER
ASTM C 635 & I
ASTM C 636
KITCHEN
2%8 WOOD
STUDS®
0 16" O.C.
2X6 WOOD
STUDS
01C O.C.
KITCHEN
BOTTOM SIDE OF
ROOF PLYWOOD HE
SUPTRACK SYSTEM
SUSPENDED 2'x4', 'REF
'T'-BAR GRID TRUS
I
I
SEE HOOD;
DRAW NGS '
SUSPENDED ACOUSTICAL
CONTI
CEILING TILE - SEE
FRE I
R.C.P. AND FINISH
SCHEDULE - INSTALL
PER ASTM C 635 &
ASTM C 636
KITCHEN
3 5/8" MR.
STUDS 0 16" or
R-19 BATT
INSULATION
5,
BI
PI
S(
R-19 BATT.
R-19 BATT.
w
R-19 BATT. o
w
o
INSULATION
INSULATION
mcc
NSULATION
m
\
Ln
\
\
T.O. FINISHED FL^(_'^
T.O. FINISHED FLOOR
T.O. FINISHED FLOOR,
FL-100-0 w`
eWALL PARTITON
WALL PARTI110N
EL =100-0
o WALL PARTITION
Lt. 100-0
WALL PARTITION
P8
�c
BOTTOM SIDE OF ROOF
PLYWOOD DECK
SIMPSON HTZ TRUSS CLII
48" O.C. MAX.
HOLD CONTINUOUS DBL.
PLATE DOWN (1 1/4" MP
AB WOOD
S
SEE RC=
HEE 14/
SUSPENDEL
IT -BAR E
SUSPENDED ACCUSED
CEILING TILE - SEE R.
AND FINISH SCHEDULE
INSTALL PER ASTIIC
ASTM C 636 �)
HIGHS&
LOCKING
LOCKING
m
DINING
KITCHEN PB
8" GYP.
ARE FINISH
R PLAN AND
HEDULE
NO WALL FIN S-®
2X4 WOOD STUDS
® 16" O.C.
R-13 BATT.
INSULATION
DON'T. TREATED WD.
ANCHORED TO SLAB
X U27 P8 0 48" 0.(
®&
m
� FLOORING - REF. A1.3
ITI
TO. FINISHED FLOOR
EL.=100 -0 0.
P8 WALL
PARTITION
P@ PI1 P1 Oa O 1'-0" a
SCALE: 3/4" = l'-G SCALE: 3/4" - 1' 0" SCALE: 3/4" = V-0" SCALE: 3/4" -
V,
VV A A VV FOR WALLS RUNNING W FOR WALLS RUNNING PARALLEL
FOR WALLS RUNNING PARAL4EF PARALLEL WITH TRUSSES, VATH TRUSSES, ATTACH TOP
FOR WALLS RUNNING PARALLEL BOTTOM SIDE OF ROOF µITN TRUSSES, ATTACH TOP11 BOTTOM SIDE OF ROOF - BOTTOM SIDE OF ROOF ATTACH TOP TRACK TO 2x BOTTOM SIDE OF ROOF TRACK TO 2x BLOCKING AT BOTTOM SIDE OF ROOF
W1H TRUSSES, ATTACH TOP TRACK PLYWOOD DECK TRACK TO 2x BLOCKING AT PLYWOOD DECK `.. PLYWOOD DECK BLOCKING AT MAXIMUM 32" ON PLYWOOD DECK MAXIMUM 32" ON CENTER PLYWOOD DECK
TO 2x BLOCKING AT MAXIMUM 32 MAXIMUM 32" ON CENTER I I SIMPSON HTZ TRUSS CLIP 0 CENTER BETWEEN BOTTOM II BETWEEN BOTTOM CHORDS OF II
ON CENTER BETWEEN BOTTOM BETWEEN BOTTOM CHORDS o'F SIMPSON HTZ TRUSS CLIP ® 48" O.C. MAX. CHORDS OF TRUSSES \II I TRUSSES
CHORDS OF TRUSSES SIMPSON HR TRUSS CUP ® TRUSSES 148' O.0 MAX. HOLD CONTINUOUS DBL. TOP SIMPSON HTZ TRUSS CUP 0 SIMPSON IT 1,
48" O.C. MAX. PLATE DOWN (1 1/4" MAX.) 48" O.C. MAX. I TRUSS CLIP O
x - -
48" O.C. MAX.
u(h X1 n( V v m V Ffc
HOLD CONTINUOUS PRE-FAB WOOD TRUSSES PRE-FAB WOOD TRUSH' PRE-FAB WOOD TRUSSES SU4
DEL TOP PLATE HOLD CONTINUOUS 'T-
DOWN N 1/4" MAX.) HOLD CONTINUOUS DBL. TOP PLATE
DBL. TOP PLATE SEE RCP SEE a 2x8 LISTS C 16" 01 DOWN (1 1/4" MAX,) ^h
DOWN (1 1/4° MAX) SHEET A2 SHECT MA% w/SIMPSON �`I
US28 EA. END
NEW 2x8 LISTS ®16" SUSPENDED 2'x4', HOLD CON IINUOUS 2x8 JSTS 0 16"
2x8 LISTS ®16" O.C. 2x8 LISTS ®16° O.C. MAX DBL. TOP PLATE O.C. MAX
O.C. MAX w/SIMPSON 'T'-BAR GRID rD 2'x,V IIr
I
PRE-FAB WOOD
TRUSSES —
ED 2'x4',
GRID -
MAX w/SIMPSON w/SIMPSON LUS28 EA. END NEW 2x8 LISTS 016
LUS28 EA END LUS28 EA. END SUSPENDED ACOUSTICAL 0 C MAX w/SIMPSON DOWN (1 1/4" MAX.) RID SEE RCPw/SIMPSON SUSPENDED
CEILING TILE - SEE R.0 P
TEE RCP
AND FINISH SCHEDULE -
INSTALL PER ASTM C 635
3HIAI A2
SEE RCP
SEE RCP&
ASTM C fi36
SHEET A2
SHEET A2
5/8" GYP. BD. TYPE 'X% FIN.
5/8" GYP. BD. TYPE
CONTINUOUS
CONTINUOUS
PER PLAN AND SCHEDL
'X', FIN. PER PLAN
FIRE BLOCKING
FIRE BLOCKINGCONT.
2x8 LEDGER wA4) 16d
AND SCHEDL.
EA. STUD.
5/8" M.R. GYP.
CONT. 2x8 LEDGER w/(4BOARD
FINISH16d
® EA. STUD.
PER PLAN AND
SCHEDULE
WTOILETS
TOILETS
TOILETS
KITCHEN
5/8" M.R. GYP.
D FINISH
RPLAN
5/5" R. ARD
PEER
AND
FIN SHMPER PLAN AND
SCHEDULE
SCHEDULE
2X4 WOOD STUDS I 2X4 WOOD STUDS
® 16" O.C. 6
R-13 BATT.PSJLAflON
RELEASED FOR CONSTRUCTION o DNISHEDFlNISHeD FLooR}
FIHSubject to compliance with all regulationsLION
of State and meal Codes I 1 1City of Camel
dVT�' lD+nr)nDA�
DATE: \\ 04/03/19
R-13 BATT.INSULATION
CA
LTO. FINE ED
P5 WALL PARTITION
SCALE. 311 I
LUS28 EA. END D ACOUSTICAL SHEET A2 LUS28 EA, END ACOUSTICAL
CEILING TILE -
5/8" GYP. BD. TYPE 'X', FIN.
PER PLAN AND SCHEDL
CONTINUOUS
CONTINUOUS
FIRE
CONE 2x8 LEDGER w/(4)
FIRE BLOCKING
BLOCKING
16d ®EA. STUD.
5/8" GYP.
3
3
BOARD FINISH
5/8" M.R. GYP. BOARD
PER PLAN AND
FINISH PER PLAN AND O
-
SCHEDULE
SCHEDULE
m
m
OTOILETS
KITCHEN
E�
DINING
®HALL
5/8" GYP. BOARD
FINISH PER PLAN ANT;
SCHEDULE
2%6 WOOD STUDS
0 16" O.C.
CEILING TILE - SEE
R.C.P. AND FINISH
SCHEDULE - INSTALL
PER ASTM C 635 &
ASTM C 636
KITCHEN
2%8 WOOD STUDS
® 16" O.C.
2X4 WOOD STUDS®
0 16" O C.
�o
TO FINISHED FLOOR
EL=too D
P4 p4a WALL PARTITION P3 P3a WALL PARTITION
SCALE: 3/4 1 -f.
5/8" GYP. BD. TYPE
'X', FIN. PER PLAN
AND SCHEDL.
CONE 2x8 LEDGER w/(4)
16d 0 EA. STUD. —
CONTINUOUS FIRE BLOCKING
5/8" GYP. BOARD FINISH
PER PLAN AND SCHEDULE -
HALL
R-13 BATT.
INSULATION
5/8" GYP, BD.
TYPE 'X', FIN. PER
PLAN AND SCHEDL
CONT 2x8
LEDGER w/(4)
16d 0 EA. STUD.
TOILETS
5/8" M.R. GYP -
BOARD FINISH
PER PLAN AND
SCHEDULE
2X4 WOOD STUDS
0 16" O.C.
Pz WALL PARTITION
SCALE 3/4" Y-r:'
SEE R.C.P. AND
FINISH SCHEDULE
- INSTALL PER
ASTM C 635 &
ASTM C 636 -
5/8" GYP
\ BOTTOM SIDE ROOF
® PLYWOOD DECK
SIMPSON HTZ TRUSS CLIP
P 48" O.C; MAX.
FOP
- HOLD CONTINUOUS DBL. TOP
PLATE DOWN (1 1/4" MAY
T
P8
P.
)35
CONTINUOUS
FIRE
BLOCKING -
COOLER
8" GYP.
EOARD FINISH
PER PLAN AND
SCHEDULE
PRE-FAB WOOD TRUSSES
NEW 2x8 JSTS 0 1C 0 C 1L;-
w/SIMPSON LUS28 EA. EEJ
5/8" GYP. BD. TYPE 'X, FIN.
PER PLAN AND SCHEDL.
CONE 2x8 LEDGER w/(4) 16d
0 EA. STUD.
TOILETS
5/8" MR GYP. BD. FIN. PER
PLAN AND SCHEDL.
2X6 WOOD STUDS
0 16" O.C.
R-13 BATT.
SILL
INSULATION
CON'T. TREATED WD. SILL
x/HIED
ANCHORED TO SLAB w/HILTI
MAX.
X-1127 PS ® 48" O.C. MAX.
FLOORING - REF. AID
T.O. FINISHED FLOOR
EL =100 0 -
OWALL PARTITION
SCALE: 3/4' - 1' 0"
11HE DESIGN AND DETAILS
DISCLOSED HEREIN ARE THE
EXCLUSIVE PROPERTY OF
WINTER ARCHITECTS INC. AND
SHALL NCT BE CGPIED OR
REPRODUCED IN WHOLE OR
IN PART NITHDUi ITS PRIOR
WRITTEN CONSENT.
DAN WINTER, ARCHITECT
N�
li
'Q
V
m
0
U�
Z
Q
z
N
=
w
U
U.
z
Q
U
~
/
W
PARTITION GENERAL NOTE:
WHERE THE TOP OF THE STUD
BOTTOM SIDE OF WALLS TERMINATEAGAINST PRIM AR`
ROOF PLYWOOD DEC STRUCTURAL FRAMING ALim
"DEFLECTION TRACK" SHOULD BE
SLI PIRACK SYSTEM USED TO ALLOW FOR VERTICAL
MOVEMENT ONE ROW OF THE
RECOMMENDED HORIZONTAL
BRIDGING SHALL BE PROPERLY
INSTALLED BY MECHANICAL
ATTACHMENTS TO EACH STUD AS
CLOSE TO THE TOP AS POSSIBLE.
SUSPENDED 2'x4', ANY TEMPORARY SCREWS FROM T-E
,,CIS
MO)�A
'T'-BAR GRID TOP OTRACK TO THE
hy �py"Q
az- � p1S TA
p 'taA
METALL STUDSS1UD5 SHALL BE REMOVED
SEE RCP AS SOON AS POSSIBLE TO ALLOW
oa
SHEET A2 VERICAL DEFLECTION OF THE
Aa 19 00
PRIMARY FRAMING AND TO PREVENT
STA E ++
DAMAGE TO THE STUD WALL.
METAL STUDS SHOULD NEVER BE
SUSPENDED ACOUSTICAL
CEILING TILE - SEE ATTACHED DIRECTLY TO HORIZONTA
STRUCTURAL FRAMING SYSTEMS
R.C.P. AND FINISH 'WITHOUT A DEFLECTION TRACK OF
INSTALL
SCHEDULE - INS VERTICALLY SLOTTED CLIPS.
PER ASTM C &
WINTER
ASTM C 636 FOR EXAMPLE: A 3/8" VERTICAL
ARCHITECTS
DEFLECTION IN THE PRIMARY
STRUCTURAL SYSTEM CAN CAUSE A
1 024 EAST
12 FOOT HIGH METAL STUD WALL
TO BOW MORE THAN 5 INCHES,
FIRST STREET
WICHITA, KS.
3 IN SOME CASES WOOD TRUSSES
67214
s CAN BREAK IF NOT ALLOWED TO
DEFLECT NATURALLY WITH WOOD
PH. 31 6-267-71 42
STUD WALLS TIGHT TO THE BOTTOM
CORD.
PROJECT
KITCHEN
BOARD FINISH WALL
PER PLAN AND
SCHEDULE PARTITIONS
DATE
6" MTL. STUDS 0 11/7/2018
16" O.C.
R-19 BATT.
INSULATION
RMW
CHECKED BY:
DW
— X3
®
T0. FINISHED E _':
EL= GF
SHEET NO.
WALL PARTMON
<�a
��
All
SLAIF3/4"_