HomeMy WebLinkAboutParkside - Lot 10 - AshmoorFront Elevation BLeft ElevationRear ElevationRight ElevationExterior Trim KeyAshmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A1.1Elevations
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A1.2Roof Plan BPorch Gable EndCovered PatioSection atPorch Box-BeamCovered PatioSection atRoof Plan
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A2.1Foundation PlanPlan BFoundation
FinishedBasementBedroomExercise Rm.Hobby orUnfinishedStorageFull BathW.I.C.UnfinishedStorage /Utility Rm.BarAshmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A2.2Finished Bsmt. PlanFinished Basement Floor PlanBar Elevation
KitchenCoat Closet /Bulk StorageFoyerGreat Room5th Bdrm. SuiteMorning RoomFoyerFamilyGarageWork Bench /Storage2 - CarGarage1 - Car2-StoryStairwayWalk-InClosetDenWalk-InClosetOwner's SuiteOwner'sBathLivingOutdoorCOV.EntryPlanningCenterLaundryDining Rm.Wine Rm.Bath 2Walk-InPantryPwdr.RoomArea CalculationsAshmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A3.1First Floor PlanGeneral Notes:Plan BWine Room ElevationFirst Floor
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A3.1.2Fam. Org. Built-in'sSection at Built-In'sFront ElevationEnlarged Plan at Built-In's
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A3.1.4Kitchen elevationsElevation ElevationIslandTrim Detail
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A4.6Fireplace ElevationFireplace Elevation
Open to BelowBedroom 3Bonus RoomOpen toBelowBelowGreat RoomWalk-InClosetWalk-InClosetBath 3Walk-InClosetBedroom 4Bath 4MiniLaundryAshmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A3.2Second Floor PlanSecond Floor Plan BGeneral Notes:Note:
Owner'sBathAshmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A3.2.2Shower Details Shower ElevationsEnlarged Plan at Owner's Bath
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A3.2.32nd Floor Built-in'sSection at ShelvesDetail at Trim HeaderBuilt-In ShelvesDetail at Trim BaseDetail at ShelfPartial Plan at Built-In Shelves
LivingOutdoorKitchenRoomMorningBonus Rm.W.I.C.FoyerBasementHallStairs2-StoryAshmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A4.1Building SectionBuilding Section
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A4.2Stair SectionStair SectionStair LandingStair LandingFirst FloorBasement
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0A4.3Exterior DetailsColumn BasePlan Section at Porch ColumnPlan Section at Porch ColumnSection at
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0E2.1Foundation Elec.Foundation Electrical Plan BElectrical Legend
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0E2.2Finished Bsmt. Elec.Finished Basement Electrical Plan
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0E3.1First Floor ElecFirst Floor Electrical Plan BElectrical Legend
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0E3.2Secoind Floor PlanSecond Floor Electrical Plan BElectrical Legend
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0S1.11st Floor FramingFirst Floor Framing Plan BLegend
Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0S2.12nd Floor FramingSecond Floor Framing Plan BLegend
D-3Ashmoor, Lot #10
3445 Yancey Place, Carmel, Indiana 46074
Parkside B 5321B0 Typical Rim Board ClosureTypical Squash Block DetailTypical Point-Load DetailHanger Detail at Solid BeamI-Joist Brick Cantilever DetailTypical I-Joist Cantilever DetailHanger Detail at I-JoistBrick Cantilever DetailTypical I-Joist Load-Bearing Cantilever DetailFloor Framing Details
Community & Home Site
Construction Manager
Frame Check Garage
FC CM Attic Access location correct per Print, access has 14 inch sides if an insulated attic. Check size of Gables Access.
FC CM Post plumb and strapped to beam at top
FC CM Garage beam will be sealed to prevent air infiltration to floor space after Drywall is hung
FC CM Walls in Attic have sheathing installed
FC CM All panels are taped in Attic & Verticals Taped.
FC CM House band board in garage attic has insulated sheathing installed
FC CM House wrap installed at Band system in Garage and pulled down
FC CM Truss bracing installed if required
FC CM 2x Framing for trusses/girders nailed directly house to framing without foam sheathing between frame members
FC CM Truss hanger’s nailed completely with required nails
FC CM Garage door opening correct size and location
FC CM Smart trim at bottom of door at concrete is ¼ inch off of concrete
FC CM Anchor bolts in garage plate installed 12 inches from each plate end at foundation and not more than 6 foot on
center and 12 inches from corner. Garage Portal frame 2x2 square washers in place at door. Nuts tight.
FC CM Garage steps are of equal rise to top of door threshold from garage floor. Not more than 8 ¼ rise
FC CM Sill sealer installed under wall or floor system between house and garage
FC CM Garage door bucks installed floor to ceiling in 1 piece 2x6 minimum. Buck is not to be in contact with concrete
Nailed 12 inches on center
FC CM Garage door buck installed above door 1 piece 2x6. 2x10 installed above center of door to ceiling for garage door
opener nailed 12 inches on center
FC CM Estate/Side load electrical panel walls build if required. Note these walls may not be on print.
FC CM OSB is cut back 2 inches on each side of ridge, Ripper row no less than 2' at Peak.
FC CM Bowed studs are marked. Note these markings may be visible to customer if garage in not finished
FC CM Garage to house door set with 3 shims on each side and/or Exerior Service Door.
FC CM Drywall nailer in place on ceiling and corners/check for insulation access.
FC CM Garage door Portal framing correct per IRC 2008 Indiana amendments. Truss to girder connection 1/4" or less Solid
Bearing.
FC CM Truss Drawings and print hung in Garage
FC CM Girder truss bearing is complete to foundation
Frame, House Interior
FC CM Garage to house door set with correct reveal 6 shims total
FC CM Bowed studs checked and marked in orange on the stud and floor with a B
FC CM Check each room per print for wall and door opening placement
FC CM Check each room for window placement.
FC CM Check walls for plumpness mark correction using OOP OOL
FC CM Windows centered in the opening shim sides if needed window to sit on sill with 1/8 bumper on bottom. Does the
window operate smoothly
FC CM Mark each doorway with correct door size and swing Example of how to mark… 2/6 RH with an arrow.
FC CM Mark in writing if an opening wraps in drywall wright the word out Drywall wrap or do not drywall or Wood wrap.
FC CM Add cabinet dimensions to verify correct wall length
FC CM Layout CL of range hood location vertical and horizontal.
FC CM Layout cabinet locations in kitchens and baths. Verify correct space for cabinets
FC CM Think about outlet/switch location in kitchen. Are all location either under cabinets or outside of cabinets? This has
to do with backsplash tile
FC CM Think about the locations for the outlets in bathrooms, no outlets in side splashed or behind mirrors.
FC CM Check ½ wall height to be certain it is tall enough to allow casing and vanity side splash to not interfere same
applies in home office area
FC CM Check to be sure toilet and shower drains do not interfere it the Joist locations
FC CM Verify correct walls or no walls are installed at stairway, walls vs rails.
FC CM Check floor joist layout for correct placement
FC CM Check roof truss layout for correctness
FC CM Check for correct truss bracing, note you will need truss drawings for this. Additionally correct overlapping is
required at brace connections
FC CM Shower pan blocking is in place
FC CM Stud placement in a shower location is to be no more than 16 inches O.C
FC CM Drywall nailers are in place in corners all locations
FC CM Drywall nailers are in place at ceilings. Parallel wall to trusses should be cross blocked 2 foot OC laid out for drywall
placement
FC CM Floor decking nailed and glued Nails 4 in the field 6 on the seams missed nails need pulled
FC CM Floor joist are nailed and glue is present in hangers
FC CM Air sealing in dead cavities is complete
FC CM Stairs are secures with 2-16d nails from back of stringer. No visible nails from the top.
FC CM Roof decking is gapped on 4 foot ends 1/8 to ¼ inch. Nailed 4 in the field 6 on the edge
FC CM Exterior doors are to be shimmed with 3 places each side for a 6/8 door 4 each for a taller door or a door with a
transom.
FC CM Ensure finish width of Halls, landings will be 36 inches.
FC CM Nailers for Tub Flange (32 inches for tub shower & 34 inches for fiberglass shower)
Frame Checklist
Frame Business Partner
Frame Check Basement
FC CM Post plumb and tabs wrapped around the top
FC CM Post locations are correct, point loads from above in floor system installed
FC CM Beam is bearing in pocket at least 3 inches
FC CM Squash block are in place from over beam if there is a load bearing wall above.
FC CM No visible gaps in basement rim board
FC CM Floor joist laid out per print, LVL beans if needed are located in correct location.
FC CM Look for nails that have missed the joist and remove them
FC CM Joist hangers are secure with correct nails and joist are glued
FC CM Straps at bottom plate secured with 2 nails each strap on top and spaced 12 inches from plate ends and corners 6
feet on center.
FC CM Basement is clean no debris
FC CM Basement stairs are shimmed ½ inch from wall. There are no visible nails from top through stringer. All nails are
driven through 2x from under stairs. 3 Nails per step.
FC CM Stair Head height is correct. At minimum 6’8 inches in a plane diagonal line to stair header plumb.
FC CM Nosing not at top of stairs at first floor but is present and basement landing if stair case has a landing
FC CM Basement wall at basement landing is furred out with 2x material and wall is covered with insulation board or house
wrap. This depends on the space available.
FC CM Unfinished basement stair walls have 2x4 stud’s 16 inch OC on all 3 sides to close accessibility
FC CM Basement wall secured to floor with concrete nails and walls are plumb.
Finished Basement
FC CM Door opening plumb and marked with 2 inch over call size of door 2 inches taller
FC CM 2x4 studs 16 inches OC treated bottom plate
FC CM Drywall nailers present in in corners and at ceiling
FC CM All unfinished space must have a door opening into the area.
FC CM Bulkheads build shall be no lower than 7’ 1 inch from concrete floor.
FC CM Fire block weed cap above framed wall filling gap to bottom of joists.
Daylight Walkout Basement
FC CM To the bottom of a daylight window there in not more than 42 inches to the opening.
FC CM 100% braced sheathing used. Wall must meet bracing requirements of 2008 IRC. This means consideration for full
4 foot sheets. Wall cannot be all windows. Proper nailing pattern of braced sheathing.
FC CM Sill sealer is located under exterior walls. Walls are bolted per the 2008 IRC 12” plate ends 6 ‘OC
FC CM Any stud distance from concerate wall & each step wall face will need to have concrete wall insulation installed.
Exterior
FC CM All horizontal seams flashed with house wrap a minimum of 6 inches hanging out
FC CM Holes and cuts in sheathing repair by tape or damaged sheathing replaced
FC CM Window tape install on 3 sides, 2 sides first and top last. Top must be even past the sides. No tape or sealer on
bottom.
FC CM Over hangs on home correct per print. Eyebrows installed per print
FC CM Windows correct per print and are in alignment
FC CM Exterior trim to be installed no closer to a shingled roof than 1 inch. Account for shingle thickness
FC CM All trim installed has the vertical ran past the horizontal at the intersections.
FC CM
All horizontal smart trim used in board and batten style application must be installed prior to MDF board and have
drip cap installed over the horizontal 5/4 trim board. Board batten panel is to be installed between the horizontals
with ¾ trim over MDF to create the vertical.
FC CM Azeck trim installed at under doors on basement homes
FC CM 1x2 trim installed at horizontal brick transitions
FC CM Window mantles install with Ice and water behind. Ice and water to extend 6 inches past sides and top and is taped
at top
FC CM House wrap install with overlaps of 6 inches horizontal and vertical
FC CM Vertical seams of house wrap need taped with correct brand seathing tape
FC CM House warp install on all inside & outside corners
FC CM House wrap install with cap nails no more that 32inch square
FC CM Raptor roof paper installed professionally verticle laps are to be a minimum of 4 inches, horizontal laps 6 inches,
cap nails at seams 12 inches OC 24 inch cap nails on seams.
FC CM Raptor paper to be installed to create a valley that sheds water by laps
FC CM Roofer to install roof edge under raptor at eaves and over paper gables. Plan nail placement accordingly
FC CM Roof less than 4/12 must have 2 layers of felt.
FC CM Exterior door trim to be taped as windows.
FC CM Exterior doors to be sat on rubber membrane that drapes to the exterior
FC CM Rubber membrane to be installed so after concrete is poured it will be between the concrete and the house
FC CM Gutter overhang or porch tiding back to verticle wall should have Ice & Water installed @ transition.
Notes: