HomeMy WebLinkAboutfirst floor, master bath, and lower level bath plansKrystal and Stephen Brand
Remodel of Property
11017 Jordan Rd. Carmel, IN 46032
Main Floor Living Room
1. Raise floor to the same height as the rest of the main level
2. 2 electrical outlets on the west wall on either side of the window to be raised above
new floor
3. 2 HVAC vents on the west wall on either side of the window to be raised above new
floor
4. 1 electrical outlet on south wall to be raised above new floor
5. Install approx. 5-8 can lights
Kitchen
1. Electrical outlet and water line installed/moved for fridge on south wall
2. Electrical outlet installed/moved for stove on south wall
3. Gas line run for stove on south wall
4. Add electrical outlet above counter near stove on south wall
5. Water line and drain installed/moved for sink and dishwasher under larger window on
east wall
6. Add electrical outlet above counter near dishwasher on east wall
7. Add electrical outlet for beverage fridge under smaller window on east wall
8. Move light switches to dining room wall
9. Remove short wall between dining room and entry
10. Remove wall separating the living area from kitchen
11. Remove wall separating kitchen from dining to have open concept kitchen
12. Install approx. 5 can lights
13. Install 3 pendant lights (2 over island and 1 over sink )
14. Install Smoke Detector in dining area
Master Bath
1. Water line and drain for shower installed/moved to south wall
2. Water line and drain for toilet installed/moved to south wall
3. Heat light installed in shower
4. Move HVAC vent to another wall
Downstairs Bath
1. Move water line and drain for vanity to east wall
2. Install/move vanity light
3. Install/move electrical outlet to be near vanity on east wall above counter
03/25/19
Mike Sheeks