Loading...
HomeMy WebLinkAboutA000.1SCALE:SLAB BUILDING SECTION w/ LOFT1/4" = 1'-0"1 FIRST FLOOR PLATE LINETOP OF SECOND FLOOR SECOND FLOOR PLATE \A1;8'-1{\H0.750000x;\S1#8;}"\A1;7'-2{\H0.750000x;\S7#8;}" \A1;PER.\PPLAN\A1;2'-0"\A1;2'-0"LINE OF OPT. TRAY CLG. 127127 INSULATION, PER SPEC.INSULATION, PER SPEC. OWNER'S SUITE ENTRY / LAUNDRY FLOOR SYSTEM, PER SPEC.\A1;MIN. HEAD CLEARANCE 12345678910111213141516 \A1;6'-8"\A1;MIN. HEAD CLEARANCE \A1;10"\A1;MIN.\A1;7{\H0.750000x;\S3#4;}"\PMAX LOFT HALF WALL W/ OPT. LOFT HANDRAIL PER CODE ATTIC SPACE INSULATION, PER SPEC. PRE-ENGINEERED ROOF TRUSSES, PER MANUFACTURER ATTIC SPACEPRE-ENGINEERED ROOF TRUSSES, PER MANUFACTURER INSULATION, PER SPEC. GARAGE BOTTOM OF FOOTING FINISHED GRADETOP OF FIRST FLOOR \A1;FROST DEPTH\PPER LOCAL CODE 1 \A1;9'-1{\H0.750000x;\S1#8;}"\A1;OPT. 10'-1{\H0.7x;\S1#8;}" \A1;8'-2{\H0.750000x;\S7#8;}"\A1;9'-2{\H0.7x;\S7#8;}" @ OPT. 10' PLATE WINDOW HDR. HGT. WINDOW HDR. HGT. SCALE:SLAB BUILDING SECTION w/ LOFT1/4" = 1'-0"2 PRE-ENGINEERED ROOF TRUSSES, PER MANUFACTURER KITCHEN GATHERING ROOM POWDER STORAGE LOFTOPT. WALK-IN CLOSET OPT. BATH 4 INSULATION, PER SPEC.INSULATION, PER SPEC. FLOOR SYSTEM, PER SPEC. INSULATION, \PPER SPEC. HVAC FINISHED GRADETOP OF FIRST FLOOR FIRST FLOOR PLATETOP OF SECOND FLOOR SECOND FLOOR PLATE \A1;8'-1{\H0.750000x;\S1#8;}" \A1;PER.\PPLAN BOTTOM OF FOOTING \A1;FROST DEPTH\A1;PER LOCAL CODE \A1;7'-2{\H0.750000x;\S7#8;}" \A1;9'-1{\H0.750000x;\S1#8;}"\A1;OPT. 10'-1{\H0.7x;\S1#8;}" \A1;8'-2{\H0.750000x;\S7#8;}"\A1;9'-2{\H0.7x;\S7#8;}" @ OPT. 10' PLATE WINDOW HDR. HGT. WINDOW HDR. HGT.1900 Golf Road, Suite 300Schaumburg, Illinois 60173Midwest Zone Office........................... PLAN NAME SHEET PRODUCTION MANAGER DATE / DESCRIPTION NPC PLAN NUMBERLAWSON PLAN ID GARAGE HANDING REV # NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS INITIAL RELEASE DATE:CURRENT RELEASE DATE: (c) Copyright Pulte Home Corporation - 2017 RICK STARKEY06/07/2013 GARAGE LEFT Croix 1993.301 -- 08/01/2017 PLOTTED: October 6, 2017 / Mark Muurisepp / 1993-CROIX-CZ-BAS2-SECT.DWG A2 S.3Building Sections w/ Loft.Slab FoundationPLOTTED: October 6, 2017 / Mark Muurisepp / 1993-CROIX-CZ-BAS2-SECT.DWG A2 S.3..03/28/19 Adam Schriner