HomeMy WebLinkAboutA000.1SCALE:SLAB BUILDING SECTION w/ LOFT1/4" = 1'-0"1
FIRST FLOOR PLATE LINETOP OF SECOND FLOOR
SECOND FLOOR PLATE
\A1;8'-1{\H0.750000x;\S1#8;}"\A1;7'-2{\H0.750000x;\S7#8;}"
\A1;PER.\PPLAN\A1;2'-0"\A1;2'-0"LINE OF OPT. TRAY CLG.
127127
INSULATION, PER SPEC.INSULATION, PER SPEC.
OWNER'S SUITE ENTRY / LAUNDRY
FLOOR SYSTEM, PER SPEC.\A1;MIN. HEAD CLEARANCE
12345678910111213141516
\A1;6'-8"\A1;MIN. HEAD CLEARANCE
\A1;10"\A1;MIN.\A1;7{\H0.750000x;\S3#4;}"\PMAX
LOFT
HALF WALL W/ OPT. LOFT
HANDRAIL PER CODE
ATTIC SPACE
INSULATION, PER SPEC.
PRE-ENGINEERED ROOF TRUSSES, PER MANUFACTURER
ATTIC SPACEPRE-ENGINEERED ROOF TRUSSES, PER MANUFACTURER
INSULATION, PER SPEC.
GARAGE
BOTTOM OF FOOTING
FINISHED GRADETOP OF FIRST FLOOR
\A1;FROST DEPTH\PPER LOCAL CODE
1
\A1;9'-1{\H0.750000x;\S1#8;}"\A1;OPT. 10'-1{\H0.7x;\S1#8;}" \A1;8'-2{\H0.750000x;\S7#8;}"\A1;9'-2{\H0.7x;\S7#8;}" @ OPT. 10' PLATE
WINDOW HDR. HGT.
WINDOW HDR. HGT.
SCALE:SLAB BUILDING SECTION w/ LOFT1/4" = 1'-0"2
PRE-ENGINEERED ROOF TRUSSES, PER MANUFACTURER
KITCHEN GATHERING ROOM POWDER STORAGE
LOFTOPT. WALK-IN CLOSET OPT. BATH 4
INSULATION, PER SPEC.INSULATION, PER SPEC.
FLOOR SYSTEM, PER SPEC.
INSULATION, \PPER SPEC.
HVAC
FINISHED GRADETOP OF FIRST FLOOR
FIRST FLOOR PLATETOP OF SECOND FLOOR
SECOND FLOOR PLATE
\A1;8'-1{\H0.750000x;\S1#8;}"
\A1;PER.\PPLAN
BOTTOM OF FOOTING \A1;FROST DEPTH\A1;PER LOCAL CODE
\A1;7'-2{\H0.750000x;\S7#8;}"
\A1;9'-1{\H0.750000x;\S1#8;}"\A1;OPT. 10'-1{\H0.7x;\S1#8;}" \A1;8'-2{\H0.750000x;\S7#8;}"\A1;9'-2{\H0.7x;\S7#8;}" @ OPT. 10' PLATE
WINDOW HDR. HGT.
WINDOW HDR. HGT.1900 Golf Road, Suite 300Schaumburg, Illinois 60173Midwest Zone Office...........................
PLAN NAME
SHEET
PRODUCTION MANAGER
DATE / DESCRIPTION
NPC PLAN NUMBERLAWSON PLAN ID
GARAGE HANDING
REV #
NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS
INITIAL RELEASE DATE:CURRENT RELEASE DATE:
(c) Copyright Pulte Home Corporation - 2017
RICK STARKEY06/07/2013
GARAGE LEFT
Croix
1993.301
--
08/01/2017
PLOTTED: October 6, 2017 / Mark Muurisepp / 1993-CROIX-CZ-BAS2-SECT.DWG
A2
S.3Building Sections w/ Loft.Slab FoundationPLOTTED: October 6, 2017 / Mark Muurisepp / 1993-CROIX-CZ-BAS2-SECT.DWG
A2
S.3..03/28/19
Adam Schriner