Loading...
HomeMy WebLinkAboutErosion Control Cost OpinionEngineer's Cost Opinion - Erosion Control Project: Belle Tire Store #138 Location: Carmel, IN Date: 9/12/18 Item Quantity Unit Unit Cost Cost Erosion Control - during construction Silt Fence 1050 LF $2.00 $2,100.00 Dewatering 1 LS $10,000.00 $10,000.00 Concrete Washout 1 EA $500.00 $500.00 Temporary Construction Entrance 150 TON $35.00 $5,250.00 Erosion Control Blanket 1225 SY $2.00 $2,450.00 Temporary Seeding 2700 SY $1.00 $2,700.00 Permanent Sod 2700 SY $5.50 $14,850.00 Rock Donut 1 EA $1,500.00 $1,500.00 Rip Rap 3 SY $150.00 $450.00 Sediment Log 70 LF $2.00 $140.00 Inlet Protection 9 EA $210.00 $1,890.00 Subtotal for Erosion Control during construction $41,830.00 Erosion Control - Post Construction Water Quality Unit - Aqua-Swirl AS-5 1 EA $16,500.00 $16,500.00 Native Vegetation 250 SF $10.00 $2,500.00 Isolator Rows - 44 ADS SC-740 StormTech chambers 1 LS $20,000.00 $20,000.00 Sumped Manhole (72-inch dia.)1 EA $5,000.00 $5,000.00 Subtotal for Erosion Control - Post Construction $44,000.00 Total:$85,830.00