Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AP-201-EXTERIOR-ELEVATIONS-Rev.1
PARKING 833' -8" STR PODIUM 846' -8" GFEDCBA MATCH LINESEE 4/AP-201PODIUM LIMITSFUTURE BUILDINGS FUTURE BRICK BRICK LEDGE, SEE STRUCTURAL FINISHED GRADE, SEE CIVIL DRAWINGS FUTURE BRICK FUTURE BRICK PARKING 833' -8" STR PODIUM 846' -8" NMLKJH G SEE 3/AP-201FUTURE BRICK BRICK LEDGE, SEE STRUCTURALMATCH LINEG.9 K.6 L.4 FINISHED GRADE, SEE CIVIL DRAWINGS PARKING 833' -8" STR PODIUM 846' -8" N M L K J H G MATCH LINESEE 2/AP-201FINISHED GRADE. SEE CIVIL DRAWINGS. FUTURE BRICK BRICK LEDGE, SEE STRUCTURAL1' - 10"PARKING 833' -8" STR PODIUM 846' -8" G F E D C B A MATCH LINESEE 1/AP-201PODIUM LIMITS FUTURE BUILDINGS FINISHED GRADE. SEE CIVIL DRAWINGS. FUTURE BRICK BRICK LEDGE, SEE STRUCTURAL 4454 Idea Center Blvd Dayton, OH 45430-1500 937.461.5660 Fax: 937.461.0743 Proj. No.: Date: Issuances: Sheet Name: REV DESCRIPTION DATE BIM 360://74904 - Proscenium - R18/74904 Garage - ARCH R18.rvt3/15/2018 10:02:48 AMThe Proscenium DevelopmentGarageCarmel Development II, LLC.Intersection of Carmel Dr. and Rangeline Rd. Carmel, Indiana 4603202/22/18 - GARAGE PERMIT 074904 02/22/18 EXTERIOR ELEVATIONS AP-201 SCALE:1/8" = 1'-0"AP-201 3 SOUTH ELEVATION 1 SCALE:1/8" = 1'-0"AP-201 4 SOUTH ELEVATION 2 SCALE:1/8" = 1'-0"AP-201 1 NORTH ELEVATION 1 SCALE:1/8" = 1'-0"AP-201 2 NORTH ELEVATION 2 0 Issued For Garage Permit 02/22/18