Loading...
HomeMy WebLinkAboutAP-301-BUILDING-SECTIONS-Rev.1PARKING 833' -8" STR PODIUM 846' -8" GFEDCBA TOP OF PODIUM GARAGE PARKING MATCH LINESEE A2/AP-301PODIUM LIMITSFUTURE BUILDINGS PARKING 833' -8" STR PODIUM 846' -8" NMLKJHG TOP OF PODIUM GARAGE PARKING SUBWAY STAIRMATCH LINESEE A1/AP-301PARKING 833' -8" STR PODIUM 846' -8" 87654321 MATCH LINESEE B2/AP-301TOP OF PODIUM GARAGE PARKING EXIT 3 PARKING 833' -8" STR PODIUM 846' -8" 242322212019171618 MATCH LINESEE B2/AP-301TOP OF PODIUM GARAGE PARKING PARKING 833' -8" STR PODIUM 846' -8" 161514131211109814.113.9 MATCH LINESEE B1/AP-301MATCH LINESEE B3/AP-301TOP OF PODIUM GARAGE PARKING 4454 Idea Center Blvd Dayton, OH 45430-1500 937.461.5660 Fax: 937.461.0743 Proj. No.: Date: Issuances: Sheet Name: REV DESCRIPTION DATE BIM 360://74904 - Proscenium - R18/74904 Garage - ARCH R18.rvt3/15/2018 10:03:07 AMThe Proscenium DevelopmentGarageCarmel Development II, LLC.Intersection of Carmel Dr. and Rangeline Rd. Carmel, Indiana 4603202/22/18 - GARAGE PERMIT 074904 02/22/18 BUILDING SECTIONS AP-301 SCALE:1/8" = 1'-0"AP-301 A1 BUILDING SECTION SCALE:1/8" = 1'-0"AP-301 A2 BUILDING SECTION 0 Issued For Garage Permit 02/22/18 SCALE:1/8" = 1'-0"AP-301 B1 BUILDING SECTION SCALE:1/8" = 1'-0"AP-301 B3 BUILDING SECTION SCALE:1/8" = 1'-0"AP-301 B2 BUILDING SECTION