Loading...
HomeMy WebLinkAboutP-103-GARAGE-UNDERGROUND-PLUMBING-PLAN---AREA-C-Rev.1P-502 2 A B C D E F H 16 17 18 19 20 21 22 23 24P-202P-106 MATCHLINEMATCHLINE P-105 MATCHLINE 8"øSAN4"ø S A N 4"øSANFCO6"øSAN4"øSAN8"øSAN4"ø SAN FCO 4"øSAN4"ø SAN6"øST(4000SF)6"ø ST (4000 SF)6"øST(4000SF)6"ø ST (5500 SF)6"øST(5500SF)8"øST(11000SF)8"ø ST (15000 SF)10"ø ST (19000 SF) 4"ø ST (2400 SF) 6"ø ST (3000 SF) 4"ø S T (2 4 0 0 S F) 6"ø ST (4800 SF) 6"ø ST (3000 SF)16"øST(82200SF)6"ø S T (6 4 0 0 S F) 16"ø ST (67200 SF)4"øSAN4"ø SAN 4"øSAN6"ø SAN6"ø SAN 8"ø SAN 8"ø SAN 8"ø SAN 4"øSAN4"øSAN6" ø S T (6 4 0 0 S F ) FCO 4"ø ST (4800 SF) G 6"øF6"ø DS (6400 SF) 6"ø DS (6400 SF)6"øF3"øWTR3"ø WTR 3"ø WTR 3"ø WTR 4"ø SS 4"ø SS 4"ø SS 4"øSAN6"ø F 6"ø F 6"ø F 6"ø F 6"ø F 4"ø SS 6"ø DS (4000 SF) 6"ø DS (4000 SF)4"øSAN6"ø DS (5500 SF) 6"ø SAN 8"ø SAN 8"ø SAN 8"ø SAN 8"ø SAN 3"øWTR6"øF6"ø F 6"ø F 6"ø F 3"ø WTR 3"ø WTR 3"ø WTR 6"ø DS (3000 SF) 6"ø DS (3000 SF) 6"ø DS (4800 SF) 4"ø DS (2400 SF) 4"ø DS (2400 SF)12"øST(45200SF)16"ø ST (64200 SF) 4"ø SS 4"ø SS 4"ø SS 4"ø SS 16"ø ST (69600 SF) 16"ø ST (77400 SF) 6"ø F 6"ø F 6"ø F 6"ø F 6"ø F 6"ø F 6"ø F 8"øSAN1 P-501 16.6 17.6 18.6 19.6 20.66"øFTYP. 3"ø WTR 6"ø F 1 P-501 TYP. 1 P-501 TYP. 1 P-501TYP. INV.828.94 829.72 16"ø ST (66000 SF)16"ø ST (72400 SF) 16"ø ST (78800 SF) GCO 8"ø SAN INV.828.07 INV.833.00 4"ø4"ø 1 SP-1 2"ø 2 33 STAIR 5A 019 VESTIBULE 012 ELEVATOR 5A 014 FCO FCO 16"ø ST (82200 SF) 18"ø ST (161000 SF) INV.829.59 INV.828.93 FCO FCO FCO FCO FCO FCO 4 4"øSAN3"ø WTR 4"ø 6"ø DS (5500 SF) FD-1 FD-1 5 Sheet Name: Proj. No.: Date: 02/22/18 - GARAGE PERMIT 074904TheProsceniumDevelopmentCarmelDevelopmentII,LLC.GarageIntersectionofCarmelDr.andRangelineRd.Carmel,Indiana46032ARCHITECTURE ENGINEERING GEOSPATIAL 03/08/18 1 2 3 4 5 6 7 8 9 A B C D E F G 7635 Interactive Way Suite 100 Indianapolis, IN 46278 317.299.7500 FAX: 317.291.5805 Issuances: REV DESCRIPTION DATE BIM360://74904-Proscenium-R18/74904Garage-MECHPLUMBR18.rvt2/27/20186:34:40PMGARAGE UNDERGROUND PLUMBING PLAN - AREA C P-103 1/8" = 1'-0"1 GARAGE UNDERGROUND PLAN - AREA C KEY PLAN A E F B C NORTH D DRAWING NOTES 1 PROVIDE STUB FOR FOOTER DRAIN TILE PROVIDED BY THE GENERAL CONTRACTOR. 2 SUMP PUMP DISCHARGE RISING AT WALL. SEE P-200 SERIES DRAWINGS FOR CONTINUATION OF PIPING. 3 PROVIDE STUBS FOR FUTURE BUILDING #4 4 PROVIDE CONNECTION AT MANHOLE. VERIFY INVERT. 5 PROVIDE HEAT TRACING OF FIRE PROTECTION AND DOMESTIC WATER PIPING LOCATED IN ENCLOSURE. FINISH FLOOR ELEVATION = 833'- 8" (833.66') 0 Issued for Garage Permit 02/22/18