HomeMy WebLinkAboutP-202-GARAGE-PLUMBING-PLAN---AREA-B-Rev.1P-201P-205 P-203A
B
C
D
E
F
H
9 10 11 12 13 14 15MATCHLINE MATCHLINEMATCHLINE
P-204
MATCHLINE
P-206
MATCHLINE
CO
4"ø SS
CO
4"ø SS
FD-1
CO
4"ø SS
FD-7 FD-7 FD-7
FD-5FD-5
FD-6
6"ø DS
(6900 SF)
CO
FD-5
FCO
FCO
FCO
FCO
CO
8"ø ST (12000 SF)
8"ø ST (5500 SF)
CO
8"ø ST (5500 SF)CO
CO
6"ø ST (6400 SF)
CO CO
6"ø ST (6400 SF)6"ø ST (6400 SF)
CO
8"ø ST (5000 SF)
8"ø DS
(5500 SF)
8"ø DS
(5500 SF)
8"ø DS
(5000 SF)
8"ø DS
(12000 SF)
CO
4"ø SS
6"ø DS
(6400 SF)6"ø DS
(6400 SF)
6"ø DS
(6400 SF)
CO
4"ø SS
G
8
6"ø F STANDPIPE
3"ø WTR
2
P-501
13.9 14.1
1
P-501TYP.
SP-1 1
2"ø SPD
FCO FCO
FCO
FCO
FCO
FIRE HYDRANT
FCO
2
2 2
2
2
2
ELEVATOR 2A
002
STAIR 2A
016
Sheet Name:
Proj. No.:
Date:
02/22/18 - GARAGE PERMIT
074904TheProsceniumDevelopmentCarmelDevelopmentII,LLC.GarageIntersectionofCarmelDr.andRangelineRd.Carmel,Indiana46032ARCHITECTURE ENGINEERING GEOSPATIAL
03/08/18
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
G
7635 Interactive Way
Suite 100
Indianapolis, IN
46278
317.299.7500
FAX: 317.291.5805
Issuances:
REV DESCRIPTION DATE
BIM360://74904-Proscenium-R18/74904Garage-MECHPLUMBR18.rvt2/27/20186:34:54PMGARAGE PLUMBING
PLAN - AREA B
P-202KEY PLAN
A
E F
B C
NORTH
D
1/8" = 1'-0"1 GARAGE PLUMBING PLAN - AREA B
DRAWING NOTES
1 SUMP PUMP DISCHARGE FROM
SP-1. RISE 2" PIPE 6" AFF AND
DISCHARGE THROUGH WALL.
2 PIPING RUN AT GARAGE CEILING.
HOLD AS HIGH AS POSSIBLE.
FINISH FLOOR ELEVATION = 833'- 8" (833.66')
0 Issued for Garage Permit 02/22/18