Loading...
HomeMy WebLinkAboutP-202-GARAGE-PLUMBING-PLAN---AREA-B-Rev.1P-201P-205 P-203A B C D E F H 9 10 11 12 13 14 15MATCHLINE MATCHLINEMATCHLINE P-204 MATCHLINE P-206 MATCHLINE CO 4"ø SS CO 4"ø SS FD-1 CO 4"ø SS FD-7 FD-7 FD-7 FD-5FD-5 FD-6 6"ø DS (6900 SF) CO FD-5 FCO FCO FCO FCO CO 8"ø ST (12000 SF) 8"ø ST (5500 SF) CO 8"ø ST (5500 SF)CO CO 6"ø ST (6400 SF) CO CO 6"ø ST (6400 SF)6"ø ST (6400 SF) CO 8"ø ST (5000 SF) 8"ø DS (5500 SF) 8"ø DS (5500 SF) 8"ø DS (5000 SF) 8"ø DS (12000 SF) CO 4"ø SS 6"ø DS (6400 SF)6"ø DS (6400 SF) 6"ø DS (6400 SF) CO 4"ø SS G 8 6"ø F STANDPIPE 3"ø WTR 2 P-501 13.9 14.1 1 P-501TYP. SP-1 1 2"ø SPD FCO FCO FCO FCO FCO FIRE HYDRANT FCO 2 2 2 2 2 2 ELEVATOR 2A 002 STAIR 2A 016 Sheet Name: Proj. No.: Date: 02/22/18 - GARAGE PERMIT 074904TheProsceniumDevelopmentCarmelDevelopmentII,LLC.GarageIntersectionofCarmelDr.andRangelineRd.Carmel,Indiana46032ARCHITECTURE ENGINEERING GEOSPATIAL 03/08/18 1 2 3 4 5 6 7 8 9 A B C D E F G 7635 Interactive Way Suite 100 Indianapolis, IN 46278 317.299.7500 FAX: 317.291.5805 Issuances: REV DESCRIPTION DATE BIM360://74904-Proscenium-R18/74904Garage-MECHPLUMBR18.rvt2/27/20186:34:54PMGARAGE PLUMBING PLAN - AREA B P-202KEY PLAN A E F B C NORTH D 1/8" = 1'-0"1 GARAGE PLUMBING PLAN - AREA B DRAWING NOTES 1 SUMP PUMP DISCHARGE FROM SP-1. RISE 2" PIPE 6" AFF AND DISCHARGE THROUGH WALL. 2 PIPING RUN AT GARAGE CEILING. HOLD AS HIGH AS POSSIBLE. FINISH FLOOR ELEVATION = 833'- 8" (833.66') 0 Issued for Garage Permit 02/22/18