HomeMy WebLinkAboutP-205-GARAGE-PLUMBING-PLAN---AREA-E-Rev.1MATCHLINEP-202
P-206P-206J
K
L
M
N
9 10 11 12 13 14 15
MATCHLINE
P-204MATCHLINEMATCHLINEP-201
MATCHLINE
P-203
MATCHLINE
CO
4"ø SS
CO
4"ø DS
(2300 SF)
CO
4"ø DS
(2300 SF)
FD-1
FD-1
FD-4
CO
4"ø DS
(2300 SF)
FD-5
FD-5
8"ø DS
(4500 SF)FD-5
FD-5
FCO
CO
8"ø ST (4500 SF)
CO
8"ø DS
(4500 SF)
FCO
FCO
8"ø ST (4500 SF)
8"ø ST (4500 SF)
CO
8"ø DS
(4500 SF)
3"ø WTR
6"ø F STANDPIPE
CO
8"ø DS
(4500 SF)
8"ø ST (4500 SF)
13.9 14.1
1
P-501TYP.
1
P-501TYP.
SP-1
2"ø SPD
1
1
FCO
FCO
2
2
2
2
STAIR 6A
017
ELEVATOR 6A
023
ELEVATOR 6B
024
STAIR 7A
018
Sheet Name:
Proj. No.:
Date:
02/22/18 - GARAGE PERMIT
074904TheProsceniumDevelopmentCarmelDevelopmentII,LLC.GarageIntersectionofCarmelDr.andRangelineRd.Carmel,Indiana46032ARCHITECTURE ENGINEERING GEOSPATIAL
03/08/18
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
G
7635 Interactive Way
Suite 100
Indianapolis, IN
46278
317.299.7500
FAX: 317.291.5805
Issuances:
REV DESCRIPTION DATE
BIM360://74904-Proscenium-R18/74904Garage-MECHPLUMBR18.rvt2/27/20186:35:01PMGARAGE PLUMBING
PLAN - AREA E
P-205KEY PLAN
A
E F
B C
NORTH
D
1/8" = 1'-0"1 GARAGE PLUMBING PLAN - AREA E
DRAWING NOTES
1 SUMP PUMP DISCHARGE FROM
SP-1. RISE 2" PIPE 6" AFF AND
DISCHARGE THROUGH WALL.
2 PIPING RUN AT GARAGE CEILING.
HOLD AS HIGH AS POSSIBLE.
FINISH FLOOR ELEVATION = 833'- 8" (833.66')
0 Issued for Garage Permit 02/22/18