Loading...
HomeMy WebLinkAboutSP-106-FOUNDATION-PLAN---AREA-E-Rev.29 10 11 12 16 L K J H 1413.9 14.18 M TYPICAL SLAB ON GRADE (S.O.G.): 5" THICK REINFORCED WITH MACRO-SYNTHETIC FIBERS AT A DOSAGE REATE OF 3.5 LBS/CUYD ON 6" MINIMUM COMPACTED GRAVEL SUB-BASE 1 SP-402 TYPICAL CONTROL JOINT PATTERN C2C2C2C3C3C3C3 C3 C3 C3 C3 C3 C3 C3 C3 C2 C2 C2 C2 C2 C2 C2C2C2C3C3C3C3 C3 C3 C3 C3 C2 C2 C2 C2 C2 C2 C2 C2 E.J. /MATCHLINE 1 SP-104/MATCHLINE 1 SP-103/MATCHLINE 1 SP-102 /MATCHLINE1SP-107PIT DEPTH (-5'-0")F11.5F11.5F10.5F9.5F9.5F9.5F9.5F9.5F11.5F11.5F11.5F9.5F9.5F12.5F12.5F11.5F10.5F9.5F11.5F11.5F9.5F9.5F7.5F9.5F9.5F11.5F9.5F11.5F9.5F9.5F7.5F9.5F10.5F9.5T/FTG.=(-5'-0")12" THICK SLAB T/SLAB (-5'-0")T/FTG.=(-5'-0")103 K.6 N C3 F11.5C3 F11.5C3 F11.5C3 F11.5C4 F7.5C4 F7.5C3 F9.5F7.5F7.5F5F5F7.5F5C4 C4 C4 C4 C4 C4C4 13 C3 F9.5C3 C4 F7.5F5C3 C3 F10.52'-0"F9.5103 103 1' - 1 1/2"1' - 1 1/2" 15 /MATCHLINE 1 SP-103 T/FTG.=(-5'-0")T/FTG.=(-5'-0")T/FTG.=(-5'-0")F12T/FTG.=(-5'-0")12" THICK SLAB T/SLAB (-5'-0") 5 SP-402 5 SP-402 4 SP-402 4 SP-402 10"30'-0"0"3' - 4"14' - 0"10' - 11"6'-0"30'-4"2'-0"7' - 4"2' - 0"10'-03/4"8"8'-0"8"9'-2"1'-51/4"1' - 0"10' - 6" 1' - 0"7' - 0"2'-11/2"20'-2"8' - 0"7' - 5 3/4" TYP. 1' - 0" TYP. 1' - 0"TYP.1'-0"28' - 3"28' - 3" PIT DEPTH (-5'-0") PIT DEPTH (-5'-0") 21' - 3"28' - 3"28' - 3"19' - 6"29' - 4 1/2"29' - 4 1/2"28' - 3"28' - 3" 1' - 1 1/2"1' - 1 1/2"14'-0"30'-0"30'-0"30'-0"30'-0"W3 (TYP.)W3 (TYP.) W3 (TYP.) 3 SP-402 1 SP-402 C5 T/FTG.=(-5'-0")2' - 0" STEP FOOTING W3 W3 W3 C3 2 C1, C2, C3 INDICATES COLUMN TYPE. REFER TO SHEET SP-701 FOR DETAILS AND REFERENCES. LEGEND: FUTURE LOCATION FOR STAIR/ELEVATOR XXFT G.MARKCOLUMN MARK DRAWING NOTES: [1]REFER TO SP-001 FOR GENERAL NOTES. [2]REFER TO SP-300 SERIES DRAWINGS FOR FOUNDATION AND WALL DETAILS [3]REFER TO SP-700 SERIES FOR FRAMING SECTIONS AND DETAILS. [4]REFER TO SP-500 SERIES DRAWINGS FOR TYPICAL DETAILS [5] REFER TO SP-601 FOR BEAM AND SLAB DIAGRAMS. [6]REFER TO SP-701 FOR TYPICAL COLUMN DETAILS AND BAR ARRANGEMENTS. PLAN NOTES: [1] REFERENCE TOP OF S.O.G. ELEVATION = 833'-8" UNLESS NOTED OTHERWISE. SLOPE FOR DRAINAGE WHERE REQUIRED. SEE SHEET SP-108 FOR GENERAL SLAB ON GRADE SLOPE REQUIREMENTS. REFER DETAIL 15/SP-401 FOR TYPICAL SLAB ON GRADE WASH AT ALL COLUMNS, WALLS, ELEVATORS AND STAIR WELL WALLS. [2] TOP OF ALL FOOTINGS SHALL BE (-2'-0") BELOW THE S.O.G. ELEVATION OF 833'-8", UNLESS NOTED AS (-5'-0") WHICH WOULD INDICATED THAT THE TOP OF FOOTING IS 5'-0" BELOW ELEVATION 833'-8" MAKING THE ACTUAL TOP OF FOOTING ELEVATION 828'-8". [3] PLACE CONTROL JOINTS IN SLABS ON GRADE AT 15'-0" O.C. MAX. IN EACH DIRECTION UNLESS NOTED OTHERWISE. [4] BACKFILL OVEREXCAVATION WITH COMPACTED GRANULAR MATERIAL, 100 PSI CONTROLLED DENSITY FILL OR 1500 PSI CONCRETE. [5] ESTIMATED DEPTH TO BEARING STRATUM IS PROVIDED FOR BIDDING PURPOSES ONLY. VERIFY ON SITE WITH GEOTECHNICAL ENGINEER. [6] FOOTING THICKNESS FOR ELEVATION TO MATCH ADJACENT COLUMN FOOTING. 4454 Idea Center Blvd Dayton, OH 45430-1500 937.461.5660 Fax: 937.461.0743 Proj. No.: Date: Revisions: Sheet Name: REV DESCRIPTION DATE 1/30/18 BIM360://74904-Proscenium-R18/74904Podium-STRR18.rvt7/11/201811:16:21AMTheProsceniumDevelopmentGarageCarmelDevelopmentII,LLC.IntersectionofCarmelDr.andRangeLineRd.Carmel,Indiana46032074904 FOUNDATION PLAN - AREA E SP-106 SCALE : 1/8" = 1'-0"1 FOUNDATION PLAN - AREA E NORTH KEY PLAN A E F B C NORTH D KEYNOTES 103 12" THICK CONCRETE SHEAR WALL WITH #5@12" O.C. EACH WAY EACH FACE W3 FOOTING SCHEDULE FOOTING MARK WIDTH LENGTH DEPTH REINFORCING F5 5' - 0"5' - 0"1'-8"(6) #5 EACH WAY BOTTOM F7.5 7' - 6"26'-0"2' - 0"(9) #7 EACH WAY BOTTOM F8.5 8' - 6"8' - 6"2' - 0"(9) #7 EACH WAY BOTTOM F9.5 9' - 6"9' - 6"2' - 4"(8) #8 EACH WAY BOTTOM F10.5 10' - 6"10' - 6"2' - 8"(9) #8 EACH WAY BOTTOM F11.5 10' - 6"11' - 5"3' - 0"(13) #8 EACH WAY BOTTOM F12 12' - 0"12' - 0"3'-0"(13) #8 EACH WAY BOTTOM F12.5 12' - 6"12' - 6"3' - 0"(14) #8 EACH WAY BOTTOM F18 18' - 0"21'-0"3' - 0"(22) #8 EACH WAY BOTTOM F26 26' - 0"12' - 0"3'-0"(13) #8 EACH WAY BOTTOM (28)#8 SHORT BOTTOM W3 3' - 0"CONT.1' - 2"(4) #5 CONT. BOTTOM 2 0 Issued For Foundation Permit 01/30/18 1 Issued For Garage Permit 02/22/18 2 Peer Review Modifications 07/11/18