HomeMy WebLinkAboutC3.0-STORMWATER-POLLUTION-PREVENTION-PLAN-Rev.0TOPOGRAPHIC & BOUNDARY NOTE ALL EXISTING HORIZONTAL AND VERTICAL INFORMATION HAS BEEN SHOWN PER AN ALTA/NSPS LAND TITLE SURVEY PREPARED BY SEA GROUP, LLC. DATED 05/24/2018; THEREFORE, CIVIL SITE GROUP, INC. CANNOT BE HELD RESPONSIBLE IF ACTUAL HORIZONTAL AND VERTICAL DATA IS DIFFERENT FROM THAT SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO COMMENCING WITH CONSTRUCTION. THESE DRAWINGS REFLECT ABOVE GROUND INDICATIONS OF EXISTING UTILITIES. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH IN THE AREA EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. GENERAL NOTES CONTRACTOR TO KEEP EXISTING PAVEMENT SURROUNDING THE SITE "BROOM CLEAN" AND FREE OF SOIL OR AGGREGATE THAT MIGHT BE BROUGHT OFF -SITE. DEPENDING ON THE CONSTRUCTION SEASON, MOISTURE CONTENT AND PROPERTIES OF THE SOILS ON SITE, CHEMICAL MODIFICATIONS AND/OR LIME STABILIZATION MAY BE REQUIRED. SEE SHEET C11.0 FOR SPECIFICATIONS. CONTRACTOR SHALL SUBMIT PRECAST STORM SEWER STRUCTURE SHOP DRAWINGS TO ENGINEER FOR REVIEW/APPROVAL PRIOR TO MANUFACTURING. CONTRACTOR NOTE EROSION CONTROL NOTES 1, EROSION CONTROL PLAN MUST BE EXECUTED BEFORE COMMENCING WITH CONSTRUCTION. 2. ALL EROSION CONTROL MATERIAL NEEDS TO BE APPROVED BY THE CITY INSPECTORS PRIOR TO INSTAI I ATION. DEVELOPMENT SUMMARY TOTAL SITE AREA = 2.43 ACRES +/- TOTAL DISTURBED AREA = 2.0 ACRES � \ � ODHOTES 0.05 ACRE CONCRETE WASHOUT BMP 30 CY II_ ROLLOFF PROVIDED BY REPUBLIC WASTE SERVICES OR SEE DETAIL 04/C4.1 Eli \ \I I r 5F `®eO PS PS F @ PS CO Pis EB 845-PS EB Q5� PS ES DO I PS B i,5/ • NO EARTH DISTURBING ACTIVITY MAY COMMENCE / / 6/ /� • •# WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 1 ` PS / / PS /X /to ��. �• 0 GENERAL NOTES I p�0 I � ( //Qe •�••00 1. CONTRACTOR TO SCHEDULE A PRE -CONSTRUCTION MEETING WITH $ p t PS THE CITY OF CARMEL STORM WATER ENGINEERING (DAN GRESKAMP). 1 ♦ I / EB / PRIOR TO COMMENCING NITH CONSTRUCTION. 317-571-2441 IND �p r, ,T/♦ (p1 �� / O O O O O 2. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO/ O CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 1 i O O / O 3. ALL COMPLIANCE WTHHAPPLICABLE ACTIVITY NO.S.H.A. STANDARDSTHIS SITE TO BE FORPERFORMED @ 1 B ♦ � Q / / 0000 C SAFETY. 10)O z a 1 11 6 00 4. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ggg 1 PS O Cc) ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. ¢a J y 1 ,a5 j O O O 11 5. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL EXISTING ELEVATONS BEFORE CONSTRUCTION BEGINS w F Y ao g L( 9 L 1 STORM SEWER SYSTEM NOTE I ALL ON -SITE STORM SEWER INFRASTRUCTURE 00 @ ' I TO BE CONSTRUCTED WITH THIS PROJECT SHALL I I I BE PRIVATELY OWNED AND MAINTAINED. w FZ o1.11 I , 00 SOILS DESCRIPTIONS & LIMITATIONS�� A I � z O Q 1. Brookston Silt Clay Loam - 5.3� Site The Brookston series Y Y ) o ( raE consists of verydice poorly drained soils formed in u to 20 inches P� P Y P of silt material and the underlying loam till in depressions on till Y Y 9 Y P loins and moraines. Permeability is moderate in the subsoil and P Y I moderatelyslow in the underlying material. Slope ranges from 0 to 2 Y 9 P I percent. Subject soil does not present any foreseeable limitations to II the proposed development. $ I 2. Crosby Silty Loam (CrA - 34.8% Site) The Crosby series consists I of very deep, somewhat poorly drained soils that are moderately deep I to dense till on till plains. These soils formed in loamy till that can be capped with up to 22 inches of loess or silty material. Permeability is moderate or moderatelyslow in and above the ar illic horizon and 9 I slow or very slow below the argillic horizon. Slope ranges from 0 to 2 i percent. Subject soil does not present any foreseeable limitations to I the proposed development. 'sq- \' 3. Shoals Silt Loam I - 0.2% Site) The Shoals series consists of I very deep, somewhat poorly drained soils formed in alluvium on flood I \ plains. Slope ranges from 0 to 2 percent. Permeability is moderate in $ the solum and moderate or moderately rapid in the substratum. FLOOD NOTE MULCHING NOTE SEEDING NOTE THIS LOT DOES ENTIRELY IN ROOD HAZARD ZONE 'X' AS SCALED WHERE REQUIRED. CRIMPED/ ANCHORED MULCH OR INSTALL TEMPORARY SEEDING AFTER A SPECIFIC FROM THE ROOD INSURANCE RATE MAP (FIRM) FOR HAMILTON MULCH NTH A TACKING AGENT SHALL BE USED THE STAGE OF CONSTRUCTION HAS BEEN COMPLETED COUNTY, INDIANA, COMMUNITY NAME CITY OF CARMEL, APPLICATION RATE SHOULD MEET GUIDELINES PER (TEMPORARY OR FINAL) WHERE AREAS WILL BE COMMUNITY NUMBER 180081, MAP NUMBER 18057CO209 G, PRACTCE 3.15 OF THE INDIANA HANDBOOK FOR IDLE OF CONSTRUCTION ACTIVITIES FOR A PERIOD PANEL NUMBER 0209 G, DATED NOVEMBER 19, 2014. EROSION CONTROL IN DEVELOPING AREAS, OF 15 DAYS OR MORE. REFERENCE NAP FIRM MAP R 10057OD209 G EROSION EFTFCflVE DATF: NOVEMBER 19, 2014 FERTILIZER NOTE CONTROL CONTACT: DO NOT USE PHOSPHOROUS CONTAINING DERMATOLOGY, INC. 3755 EAST 82nd STREET, STE. 75 FERflUZOH (12-12-12) UNLESS SOIL TESTS INDIANAPOLIS. IN 46240 INDICATE A PHOSPHOROUS DEFICIENCY. ATTN: AMY SUMMERS (317) 410-0056 /T CONTRACTOR RESPONSIBLE TO KEEP ROAD / l/ FREE OF DUST/DEBRIS/MUD AT ALL TIMES "'maw LAKEFRONT COURT NZ30 _ /Delliissim �reow�a V �-sa- r unr .."ENTRANCE p842.18 LS M 4 .tPI �MI.67 ME • •�.,�:}bT7• �" Cam, �G� �NiNhZ 16 � 1 h4V REVISION RECORD IREVI DATE I DESCRIPTION DES BY APE BY 1 107/27/181 REVISIONS PER T.A.C. COMMENTS I BAG EAG LEGEND: PROPERTY BOUNDARY - - - RIGHT-OF-WAY LIMITS OF DISTURBANCE PROPOSED CONCRETE PROPOSED STORM SEWER Q� PROPOSED STORM STRUCTURE -- - ROOF DRAIN/SUB-SURFACE DRAIN 70.23 TOP OF CURB GRADE 79B'73 PAVEMENT GRADE ]98.25 PAVEMENT OR EARTH GRADE M.E. MATCH EXISTING GRADE - - - - PROPOSED GRADE BREAK - -847- - PROPOSED CONTOUR ---847--- EXISTING CONTOUR Mta Check Dam/Sediment filter - Spading at IW within seems (Rod Ched Dam). See acted 0l/G4.1 PROPOSED SILT FENCE -Typical in all areas --E -- Where sediment could leave the site. SEE DEFAIL O6/C41 q PS 0 ♦ 8 O \ &410 �S4 q\ - /'� y�- \ III I ��_ (PR Standard SILT Duty "SILT SOCK" or approved equal) Na.N - �- � -81Py1 \ 1 PROPOSED SILT SOCK -Typical is all paved N4.10 Na.33 u v -kl� 1 areas where sediment could leave the site. \ _ _ - -845 '� PS N1.50 / PS - PS -846- - PS - \\ \ II I PS TS PERMANENT SEEDING WIN STRAW MULCH - TYPICAL I Ar1ER FINAL OHAINNG IS COMPLEIR. �U.:. �•� .Sec � /�/ � AS PS PS \ /N / \ 1 -- - 846- P � q XX PS 846 / PROPOSED BUILDING \ 11,851 S.F. (GROSS) 2.43 ACRES - - - - -F.F.E. = 845.70 ti 5- ] WM 845.50 O 11 \\ S / M...63 80.53 W..13 N40T 84579 NB.W ', Y\ 8/5.29 N5.W 1 Sir.F84-4I oz fiaT'n a asz l I n i jP5 PS PS \ 8N.85 1bill O , A/ Ig8I3.B8 GG4 h ZIce 1 a BM.N W..63 ; _ S I I BH.80 Na.O en N430 1 N4.95 .15 ---- --- - .62 1 -843- �p� r 63 - 6a3.03 N5.26 84a.]fi ; / Subject Boll does not resent an foreseeable limitations to the \ � PS 1 P Y ♦ N XX / � O development. / `� proposed P @ �'r�e Psirve#ioD- ♦ -� A 2 4. Miami Silt Loam Mm - 59.6% Site The Miami series consists 4 � � � of moderately well drained soils formed in as much as 18 inches of \ Protection'Peering ; �, `10 O r 2N B 2 844.24 1 e N loess or silt material and in the underlying loam till on till loins. ♦ u BIJ.]4 IH3.33 1 They are very deep soils that are moderately deep to dense ill. / / ��` %� \ `v r �� •8 1- - 1 Nz13 84a53 I I 1 Permeability is moderate or moderately slow in the solum, and slow / / �` ♦v A / I N262 Names I®S 1 or very slow in the underlying dense till. Slope ranges from 0 to 60 l / s P / N249 1 P PS percent. Subject soil does not present any foreseeable limitations to I / ` I v A 9 1 the proposed development. f� Ila1 lAMRWNT COURT CrA Nj MmB2 Mni CrA MmB2 CrA MmB2 CrA CrA \ CrA MmB2 c A ^CrA Mm82 Br CrA I RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and I seal Cn irm City of Camel (� �VTl slucjw )NaA� DATE: 03/27/19 NS NURSERY SOD NORTH EB PROPOSED EROSION CONTROL BLANKET 20 0 10 20 SEE DETAIL 05/C4.1 TS TEMPORARY SEEDING WITH STRAW MULCH - TYPICAL WHERE CDNSTRUCTON ACTMTES MIL REMAIN IDLE FOR A PERIOD OF 15 DAYS OR MORE. ( IN FEET) Inlet Protection-'Revtorm' Inlet Protection tlpical for all 1 inch = 201U ❑ Paved wee Inlets AFTER pavement is metalled; Sit Fence cage 84283WAS IL \ CONSTRUCTION LIMITS=2.0 At j / / �`� 1C \Bu`\ \ I \ 2 t\ N1.6D 1 / I � `� p5 � •:. Nzfio Nzas N3.33 �a / `,c w N210 N1.95 N283 ,i 1 \ c -842- 5 gND; EB i- 1 1 PS�q P PS i _ -840 ��� OWN, _ME mis min __�___ A -a Gswin �� MEMisMiss M839- saw ME MEN II Mis M AN Tree Pre$ervntion / - , m 1-sn ;---sec sin _sLw d Knavwhat'sbelow,Callbefem you dig. - 843 - - - - - - - - - _ _ _ _ '84� 844 ---��412 k'Re vtarm' inlet protection BEFORE pacment is installed. Point where stamwater wil leave the site. 00o°O PROPOSED TEMPORARY CONSTRUCTION ENTRANCE °°°°° SEE DETAIL 03/C4.1 NOTE: INSTALL TEMPORARY SEEDING AFTER A SPECIFIC STAGE OF CONSTRUCTON HAS BEEN COMPLETED (TEMPORARY OR FINAL) WERE AREAS WILL BE IDLE OF CONSTRUCTION ACTVTTES FOR A PERIOD OF 15 DAYS OR MORE. GRADING NOTES 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 3. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY UNES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTIUTY CONTRACTORS AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 4. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (LOCATION, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY CO PANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY EROSION CONTROL NOTES 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 2. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WLL MINIMIZE EROSION. 3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WLL BE INSTALLED IF DEEMED NECESSARY BY ON -SITE INSPECTION. 4. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATON IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 5. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED. 6. SEDIMENT BEING TRACED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING NTH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL. 7. SOIL MICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK. 8. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 9. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NQT ALLOWED ON -SITE. 10. SCHEDULE OF EARTHWORK ACTIVITIES: a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE THAN 21 DAYS OR AS DIRECTED BY THE ENGINEER. b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIME OF THE YEAR. PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE. Lin L W� (-0' d cl C9 Z �D I® �m O�z Z0 9-I I --I � = n K �No _i0J o 00 Q C) a �`o 00-°-O rho ^^�r¢••�� FO U.)z y () �0IND V� a 111G L1111, I� G\STEq �gCP - - : No PE104Oi .o ;• STATE OF %,S, ''PeeMIT 1111 1, 62 J0 DATE: 07/20/2018 DWN BY: KPB CHKD. BY: EAG SCALE: 1" = 20' DATE: 07 20 18 NCIO a C) O 0 W 0Q IL) W W a Fti lU.la:3 . owu O _J �D E4 O O Q O W O N O PROJECT (NUMBER F)ER.001 i DRAWING NUMBER C3.0 SHEET 6 OF 15