HomeMy WebLinkAboutC3.1-STORMWATER-POLLUTION-PREVENTION-DETAILS-Rev.0SEEDBED PREPARATION
APPLY LIME TO RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING
SEEDED. APPLY 23 POUNDS OF 12-12-12 ANALYSIS FERTILIZER (OR EQUNALENn PER
1000 SQ. FE. (APPROXIMATELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO
TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC
MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FERTILIZER AND LIME INTO THE SOIL TO A DEPTH OF 2-3 INCHES
WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
MEANT.
SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA SEE
PERMANENT SEED MIXTURE CH WHILE CONSIDERING BEST SEEDING DA ES.
IF PERMANENT SEEDING IS NOT P RMITTED USE TEMPORARY SEEDING
UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS
SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE
SEED TOLERANCE CHART.
U�
Q
w
�N
O
x
?
_
0�
zO,
0�
zza
m
OGi
zNO
SOIL
�
wN
�O
o_�
FON
fS
o�
AN
¢�
SOIL
CONDITION
S
�
1>:w
zo:
0�
rw
w GO
TOLERANCE
WET
NORM
DRY
GEN.
SOIL
SPRAY
in0
0o
ro
�i
3�
LL�
x
wF=
CREEPING RED FESCUE
2
1
2
1
1
1
MED.
1
20-25
12-18
7-21
S
FESTUCA RUBRA
KENTUCKY BLUEGRASS
2
1
2
1
1
1
MED.1
1
1 20-35
12-18
10-20
PROCESSES
1
1
1
1
TALL FESCUE
FESTUCA L. ARUNDINACEA
2
1
1
1
1
1
LOW
1
24-35
24-36
5-14
T
PERENNIAL RYEGRASS
2
1
2
-
1
2
MED.
2
15-20
12-18
5-10
MT
LOLLUM PERENNE
HIGH
1PDA
CROWNVETCH
-
1
1
2
-
-
LOW
1
5-10
24
14-21
ITCORONILLA
VAN
RED CLOVER
TRIFOLIUM PRETENSE
-
1
-
2
-
-
MED.
1
7-10
18
5-10
S
S
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON -IRRIGATED*
BANKING;
SALT TOLERANCE (TO BOTH SOIL SALTS & SPRAY)
IRRIGATED
1 GOOD
T TOLERANCE
FERTILIZER NOTE
DORMANT
2 MEDIUM
MT MEDIUM TOLERANCE
SEEDING **
- NOT TOLERANT
S SUGHT TOLERANCE
DO NOT USE PHOSPHOROUS CONTAINING FERBUZERS
SEED TOLERANCE
UNLESS SqL TESTS SHOW A PHOSPHg2WS DEFICIENCY.
SPECIES
SEEDING RATE
SUITABLE PH
SITE SUITABIUTY
LBS/ACRE
LBS/10DO
SO FT.
DROUGHTY
WELL
I DRAINED
WET
LEVEL AND SLOPING, OPEN AREAS
1. TALL FESCUE
1 35
.8
5.5-8.3
2
1
2
2. T F
25
.6
5.5-B.3
1
RED CLOVER
1 5
1 .1
3. KENTUCKY BLUEGRASS
1 15
1 .4
1 5.8-7.5
1 2
1 1
CHEEPING RED FES LE
1 15
1 .4
STEEP BANKS AND CUTS
4. TALL FESCUE
1 15
.4
5.8-75
2
KEINIUI BLUEGRASS
I 25
1 .8
5. ALL FESCUE
1 35
1 .8
1 5.5-8.3
1 2
1 1
EMERALD CROWNVETCH**
LAWNS AND HIGH MAINTENANCE AREAS
6. KENTUCKY BLUEGRASS
40
.9
5.8-7.5
2
1
CREEPING RED FESCUE
40
.9
7. PERENNIAL RYEGRASS
170
4.0
1 5.0-7.5
(TURF TYPE
B. TALL FESCUE
1 170
1 4.0
1 5.5-8.3
1 2
1 1
1 2
* 1 - PREFERRED 2 - WILL TOLERATE *0 INOCULATE WITH SPECIFIC INOCULANT.
SEED TOLERANCE CHART
SEEDING DETAIL
TEMPORARY SEEDING DATES
awwwommmomwo
In
■■■■■090■■■■I
■■■■ 1 ■■■■
PERMANENT SEEDING DATES
JAN FEB WAR APR MAY JUN JUL AUG SEP OCT NOV DEC
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS.
USE MULCH.
* LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS
IF MULCH IS APPLIED.
** INCREASE SEEDING APPLICATION BY 50%.
TEMPORARY SEEDINGS
TYPE OF SEED
1000 SQ.
FT. ACRE
REMARKS
WHEAT OR RYE
3.5 LBS.
2 BU.
COVER
SEED
1' TO 1 1/2" DEEP
SPRING OATS
2.3 LBS.
3 BU.
COVER
SEED
1' DEEP
ANNUAL RYEGRASS
1 LB,
40 LB.
COVER
SEED
1 4- DEEP
NOT NECESSARY WHERE MULCH IS APPLIED.
SILT FENCE
EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
STONE ENTRANCE
AS NEEDED
PRIOR
TO CLEARING AND GRADING
SILT FENCE
WEEKLY, AFTER
STORM
EVENTS
AND AS
NEEDED
PRIOR
TO CLEARING AND GRADING
EXISTING INLET PROTECTION
WEEKLY, AFTER
STORM
EVENTS
AND AS
NEEDED
PRIOR
TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY, AFTER
STORM
EVENTS
AND AS
NEEDED
PRIOR
TO CLEARING AND GRADING
TEMPORARY DIVERSIONS
WEEKLY, AFTER
STORM
EVENTS
AND AS
NEEDED
ALONG
WITH ROUGH GRADING
TEMPORARY SEEDING
WATER AS NEEDED
AFTER
ROUGH GRADING
PERMANENT SEEDING
WATER AS NEEDED
AFTER
FINISH GRADING - AS SOON AS PRACTICAL
UPON COMPLETION
EROSION CONTROL MATTING
WEEKLY, AFTER
STORM
EVENTS
AND AS
NEEDED
AFTER
FINISH GRADING - AS SOON AS PRACTICAL
UPON COMPLEDON
ROCK CHECK DAM
WEEKLY, AFTER
STORM
EVENTS
AND AS
NEEDED
AFTER
FINISH GRADING - AS SOON AS PRACTICAL
UPON COMPLEDON
INLET PROTECTION
WEEKLY, AFTER
STORM
EVENTS
AND AS
NEEDED
AFTER
EACH INLET IS PLACED
REMOVAL OF TREE PROTECTION
N/A
AFTER
PERMANENT SEEDING
REMOVAL OF STRAW BALES
N/A
AFTER
ALL AREAS DRAINING TO THESE AREAS ARE
STABIUZED
REMOVAL OF INLET PROTECTION
N/A
AFTER
ALL AREAS DRAINING TO THESE AREAS ARE
STABILIZED
REMOVAL OF SILT FENCE
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE
STABILIZED
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
BEEHIVE INLET OR
DRAINAGE COVER
FLEXSTORM CATCH -IT FILTERS FOR TEMPORARY INLET PROTECTION
PRODUCT SELECTION AND SPECIFICATION DRAWING
RYE AMMUM
NON r
REUNION MAX
e_ _0 _ e
SRI
ANY
r - -
SILT FENCE EXTENDS
8" BELOW FINISHED GRADE
NOTE:'L'
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLE) BY SUPPLIER.
Ez SILT FENCE INLET
'1 PROTECTION
NOT TO SCALE
L I DUST
R YOUR INSIDE SUN AND SIZE
-1
ISSIC YARd CEO A RE II ON END
UWI
KLReCt15QuB%islM�side2DC�t��tU.t.AN I DI
small metiSqU�(MfAadSIZIM.�iffledWI&�radECUrbtl&N)
"I'll
SEE
sFNON
"I'll,
VACANCY,
DYNAMIC
USSICAN)
UPWARD MISS Of DEARAINUM SIZE
NEADAN
USA
CARCINOMA
Iwo
NOTES
1. ALL FRAMING Is CONSTRUCTED OF
CORROSION RESISTANT STEEL G1W
PRATED OR GALVANIZED) FOR 7 YEAR
MINIMUM STORAGE LIFE.
2. UPON ORDERING CCNRRLN1gN OF THE
COT GVIIIUT, PRECAST OR CASTING
MNNE AND MODEL OR DETAILED
DIMENSIONAL FORMS MUST BE PROVIDED
TO CCNFlGURE AND ASEEMBTE YOUR
CUSTOMIZED FIECSTORM INLET ESTER.
PNST NUMBER ALONE IS NOT SUFFICIENT.
3. FOR WARIEN SPECIFICATIONS AMID
MANIENANCE GUIDEUNES I
WWW.BFLEDILTERS.COM
1AEN . GRADE
2. DROP FlF%SNRM INLET
i1LTF ON10 LOM BEARING
ALL PRODUCTS MANUFACTURED
BY INLET 4 PIPE PROIEDDON, INC
UP OF GISONG OR
A DMEION OF ADS. INC.
CONCRETE SLRUCNRE
WWW.INLELEILIERS.COM
888 2W-6655 PH
e
3. REPLACE GATE
355-3477 SO
INLEIFILTERS.COM
\ UBUC ROAD -
el
12" MINIMU
TEMPORARY CONSTRUCTION ENTRANCE
NOT TO SCALE
10' MIN.
B AR AR B
AM
22 CEOYNY AR,
AR AR
AR
1 I I I I I I I I I
10 MIL PLAN
PLASTIC LINING TYPE "ABOVE GRADE"
WITH STRAW BALES
I !
8"
EEDMA.
STL WIRE~ <
OYP.>
STAPLE DETAIL
BALE (T(P.)
CONCRETE WASHOUT
SIGN DETAIL
(OR EQUIVALENT)
48" X 24"
PAINTED WHITE
BLACK LETTERS
6" HEIGHT
DO POST
X3"X 8'
ROCK CHECK DAM MAINTENANCE REQUIREMENTS:
STAPLES
10 MIL
BINDING WIRE
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:ANAY
(2 PER BALE)
PLASTIC LINING
RAI1.
INSPECT ROCK CHECK DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
NOTES:
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
LAYOUT DETERMINED
1. DURING VEGETATIVE ESTABUSHMEN', INSPECT AFTER STORM EVENTS FOR ANY
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
IN FIELD.
EROSION BELOW THE BLANKET.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
2. THE CONCRETE WASHOUT SIGN
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET
ACTIVITIES AND REPAIR IMMEDIATELY.
STRAW ��
SHALL BE INSTALLED WITHIN
COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED. REMOVE ALL
SECTION B-B
30 FT. OF THE TEMPORARY
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
ROCK CHECK DAMS AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE. AND STABILIZE IT.
NATIVE MATERIAL
WOOD OR METAL
CONCRETE WASHOUT FACILITY.
(OPTIONAL)
STAKES (2 PER BALE)
1. INSPECT ENTRANCE PAD AND SEDIMENT
DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF
CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
RELEASED FOR CONSTRUCTION
R
SHOULD ONLY
IDS
WASHED FTOTHEUBLWATER 0IS
BE USED ITRACKED
111
Subject to compliance with all regulations
MEDIATELY.
of State and I ocal CnI
City of Camel
�VT�'�DRNAIDML
DATE: \ 03/27/19
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
oa CONCRETE WASHOUT BMP
C4.1 NOT TO SCALE
REVISION RECORD
IREVI
DATE
I DESCRIPTION
DES BY
APP BY
1
07/27/18
REVISIONS PER TAO COMMENTS
EAG
EAG
6" FACE OF #8 STONE
OVER RIP -RAP STONE.
2:1 SIDE SLOPE FILTER FABRIC
OR FLATTER
9' LOWER THAI•
TOP OF BANKS
OF SWALE
2:1 SIDE SLOPET
OR FLATTER
5" FACE OF NB STONE
OVER RIP- STONE.
FLOW
FABRIC
01 ROCK CHECK DAM
C4.1 NOT TO SCALE
1. PLACE THE END POST OF THE SECOND FENCE
SIT INSIDE THE END POST OF THE FIRST FENCE.
2. ROTATE BOTH POSTS AT LEAST 180' IN A
CLOCKWISE DIRECTION TO CREATE A TIGHT SEAL
WITH THE FABRIC MATERIAL
3. DRIVE BOTH POSTS A MINIMUM OF 18" INTO THE
GROUND AND BURY THE FLAP.
JOINT DETAIL
NOTE
POSTS SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
DURING INSTALLATION AND TO SUPPORT APPLIED
LOADS.
FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC
CONSISTING OF STRONG, ROT RESISTANT,
MATERIALS RESISTANT TO DETERIORATION FROM
ULTRAVIOLET AND HEAT EXPOSURE.
os SILT FENCE CONSTRUCTION
NOT TO SCALE
NORTH AMERICAN GREEN
TYPE
I LONGEVITY
MAX SLOPE
APPLICATION
S75
10 MONTHS
31
LOW FLOW SWALES
0n5
60 DAYS
3:1
LOW FLOW SWALES
5150
10 MONTHS
21
MODERATE DISCHARGE SWALES
CS150
1 60 DAYS
21
MODERATE DISCHARGE SWALES
SC150
2 YEARS
11
MEDIUM DISCHARGE SWALES
c12s
3 rE4Rs
>1'.1
HUGH OIscHARCE SWALES
THE ERNS Of THE BLANKET SHOULD BE
BUTTEDTHE SCC225 EACH OTHER, THE EWES OF
THE SCC225 SHOULD BE OVERIAPPEO 2',
THE BLANKET SHOULD NOT BE
STRETCHED BUT ALLOWED IL LAY LOOSELY LAY wOsACH THE SOIL
SURFACE TO ACHIEVE MAXIMUM
BLANKET TO SOIL COMACT.
2
ON SLOPE APPLICATIONS, THE
TOP OF THE BLANKET SHOULD
BE 'SLOTTED IN ABOVE THE
BREAK OF THE SLOPE OR AT A
MINIMUM. STALLED IN PLACE
WITH STAPLES 6" APART ON THL
END OF THE BLANKET
4
ON LONG SLOPES, THE
ENDS OF THE
BLANKETS SHOULD BE
OVERLAPPED 4 - 6' IN
A 'SHINGLE EFFECT".
5 .ARAe��p---<�
IN HIGH VELOCITY CHANNEL V _ APPLICATIONS. CHECK SLOTS SHOULD
BE ESTABUSHEDSOU EVERY 35 - TO
By
ONE SLOTS slFouLD BE 6" WIDE By
6' DEEP WITH THE BLANKET STAPLED Ds EROSION BLANKET INSATLLATION
SODIUM THE TIUM OF THE SLOT. THEN
BACKSLIDE[) AND SEEDED. NDT TO SCALE
U
En
EL
0
wN
UISO
®_
III
F
FEE
I®
lJ
O
OAI�z
v'N00
=Y EYEOFNNa
W
O
`a�ox
LO N
F�QQ�
O a
N
0:� C
/� O
W�
`% N -O
C
nw
Wo-o
I�I
Z
.�
U N GO
E
co
CA)
GO0�_
GO
=3U EVERY
v
V� L
a
P,G LE/SS4�
WAN,G
e'�G45TEgF0'�KOP
- •
PE10403B56 : Z
.G STATE OF ANY
"1"'�
4a1
la1 1,
DATE
07/20/2018
DWN BY:
KPB
CHKD. BY:
EAG
SCALE:
N/A
DATE:
07 20
`18
1--1
x
C7
a
NED
1Q�
F-I
O
Od
(Y-)1
Q
W
F \
�>
F H
a
<
r-,
O W
tt V,,
Oz
O
W
ENNI``
O
1�
S- a
L
a
Q�z
N
U
w:Y
W
yO
FLINE)
OC
O
V:
PROJECT
ISJUMBER
T)ER.001
DRAWING NUMB:R]
C&LI
SHEET 7 OF