Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
M101-FIRST-FLOOR-PLAN---MECHANICAL-Rev.0
HP-5 HP-3 0 RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel �N�1��T1D,N DATE: 03/27/19 Di 2412 2402 Efl G115•® I ® A10-25D 24x12 �A8-115„5 B-1000, A.y;� 28x14 1600, a D-25, G70, 2412 6x6 24x1. 70, B-1000, 28x14 A10-250 A10-250 InA10-250 InA10-250 In ID2 monoff 1 1 L/ 14x10 2, 6"0 �m A6-50 AB-70AB-70 144 0.75,:J24 141 �' 72x72 EF-A A670 143G130, 3"G GSOO 24x1 ® ®®® 102 4x1224x12 ® A6-130 24x12 A6-70 124 A6-70 G140, ® 24x12 mino AmVale I❑ ❑ 101 A10 250 A10-250 �--� D 25,® 11 r L) v 0104 1FA 11 x 11 :I 1g •': 11 11 11[�, win, 1� 1I•'►� : 11 �1 ® i ■--iiiii_� �•c� �o���i1�IIlIR�1111E "19i��:::� I ,1 Jim I■■cI c�i�IJ I iI III . ; 1/ —�JII lid_ �1 I '• •�' .e �i � � � ® �I � �_ �� I ���: 11 on 11 -•, ► o �:I Flo - f' © 1 1 TRANSFER AIR I.�©1iLm :� :M, :� . 1F I i � ��11 A II LEI 2111 S,'�� � DIM. 1 A8140 ALSO _•oIV110-280, A6-70 Al SAWN, AS 140 BID �14l 1► O MM �I L aisle AS 65 ® ' .. 1 • .90 .5 11•: _. I Ei EI I 172 1� IN (3 O FIRST FLOOR PLAN - MECHANICAL SCALE: 1/8"=1'-0" TRUE PLAN GENERAL NOTES: G1. ALL WORK SHALL COMPLY WITH ALL APPLICABLE STATE AND LOCAL CODES. 32. CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED BY LOCAL AUTHORITIES. G3. VERIFY FIELD CLEARANCE AND ROUTING PRIOR TO DUCTWORK FABRICATION. DROPS, TRANSITIONS, AND OFFSETS WILL BE REQUIRED DUE TO FIELD CONDITIONS OR OTHER TRADES. 04, CONFIRM ALL EQUIPMENT SIZES, OPENING LOCATIONS, AND WEIGHTS NTH EQUIPMENT SUBMITTALS AS THESE WILL VARY WITH DIFFERENT MANUFACTURERS. G5. BALANCE ALL DIFFUSERS,GRILLES, AND REGISTERS TO WITHIN *1-10%OF THE AIRFLOWS INDICATED. G6. AS REQUIRED, PROVIDE ACCESS PANELS IN HARD CEILINGSTOGETTO DUCTWORK DEVICES (FIRE DAMPERS, VOLUME DAMPERS, SENSORS, ETC.) G7. COORDINATE DIFFUSER, GRILLE, AND REGISTER LOCATIONS WITH LIGHTING, AUDIO, AND FIRE PROTECTION DEVICES. G8. SEAL ALL SUPPLY,RETURN, AND EXHAUST DUCTWORK SO THAT AIR LEAKAGE DOES NOT EXCEED 5%OF THE TOTAL AIRFLOW. SEAL ALL VISIBLE OPENINGS. A LEAK TEST WILL BE REQUIRED IF EXCESSIVE LEAKAGE IS INDICATED IN THE AIR BALANCE. G9. THE FOLLOWING TYPES OF DUCTWORK SHALL BE GALVANIZED STEEL CONSTRUCTION TO MEET SMACNA STANDARDS FOR THICKNESS, SEAM AND JOINT CONSTRUCTION, HANGERS AND SUPPORTS. -SUPPLY AIR DUCTWORK 1" PRESSURE CLASS, SEAL CLASS B. - RETURN AIR DUCTWORK -1"PRESSURE CLASS SEAL CLASS C. - EXHAUST AIR DUCTWORK -1" PRESSURE CLASS, SEAL CLASS C. - MAKE-UP AIR DUCTWORK: 1" PRESSURE CLASS, SEAL CLASS B. G10. 1-11T' DUCTWRAP INSULATION ON CONCEALED SUPPLY AND RETURN DUCTS. G11. 1-1 0DUCTWRAP INSULATION OUTSIDE AIR DUCTS. G12. NATURAL GAS PIPE SHALL BE SCHEDULE 40 BLACK PIPE WITH THREADED RTTINGS. O PLAN NOTES: 1. PROVIDE 1 HOUR RATED FIRE DAMPER. 2. PROVIDE 6 INCH FILTER BOX LOCATED AT FURNACE ON RETURN DUCTWORK. 3. PROVIDE MOTORIZED DAMPER AND MANUAL BALANCE DAMPER FOR OUTDOOR AIR TO FURNACE. DAMPER TO BE LOCATED INSIDE MECHANICAL ROOM. 4. SUPPLY DUCT TO ATTIC. REFER TO M102 FOR CONTINUATION. 5. TERMINATE WITH HOODED WALL CAP. 6. CUT IN A TRANSFER AIR OPENING ABOVE CEILING. SIZE AS NOTED. _ � N N r J aqui r Q m ro n N U �QD 0 �r JE N aLL i� U W E`m 0 'o > m N OC O a I will o� 0 CERTIFIED BY: Its 1111111/�CA i `J )P pEp\STFq Q`F Na. %PE10809451 STALE si p 1 ,,,,IIIII111'SY q G� U Z Y l 0 Z Q 0 O Z Z = w 0LU ~ 06 U J LU o z O w O _J U Z W O LU < w U Y J LL O N F- N r F O J W 0 REVISION: MARK DATE I DESCRIPTION BRS PROJECT NUMBER 2018002 ISSUE DATE DRAWN BY CHECKED BY 2018.09.28 RCH JRF DRAWING TITLE: FIRST FLOOR PLAN - MECHANICAL SHEET NUMBER M101