Loading...
HomeMy WebLinkAboutMechanical COMcheckCOMcheck Software Version 4.1.0.0 Mechanical Compliance Certificate Project Title: 2012 IECC Project Type:Alteration Location:Carmel, Indiana Climate Zone:5a Construction Site: 10325 N. MICHIGAN RD. CARMEL, IN 46032 Owner/Agent: Chuy's 1623 Toomey Road Austin, TX 75067 514.473.2783 Designer/Contractor: Dialectic, Inc 310 W 20th St Suite 200 Kansas City, MO 64108 816.997.9601 Project Information Energy Code: Chuy's Mechanical Systems List Quantity System Type & Description Heating: 1 each - Central Furnace, Gas, Capacity = 240 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et Cooling: 1 each - Single Package DX Unit, Capacity = 118 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 12.00 EER, Required Efficiency: 11.00 EER + 11.2 IEER Fan System: RTU-1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Single-Zone VAV, 3200 CFM, 2.0 motor nameplate hp 1 RTU-1 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 240 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et Cooling: 1 each - Single Package DX Unit, Capacity = 100 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 12.20 EER, Required Efficiency: 11.00 EER + 11.2 IEER Fan System: RTU-2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 2 Supply, Single-Zone VAV, 3000 CFM, 2.0 motor nameplate hp 1 RTU-2 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 150 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Single Package DX Unit, Capacity = 68 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 12.00 EER, Required Efficiency: 11.00 EER + 11.2 IEER Fan System: RTU-3 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 3 Supply, Single-Zone VAV, 1920 CFM, 2.0 motor nameplate hp 1 RTU-3 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 180 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Single Package DX Unit, Capacity = 117 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 12.00 EER, Required Efficiency: 11.00 EER + 11.2 IEER Fan System: RTU-4&5 -- Compliance (Motor nameplate HP method) : Passes Fans: 2 RTU-4&5 (Single Zone): Project Title: Data filename: Chuy's Y:\_Projects\Active\2018\01201828.31\01201828.31.Calcs and Support\182831 COMCHECK.cck 10/22/18Report date: 111 ofPage Quantity System Type & Description FAN 4 Supply, Single-Zone VAV, 3200 CFM, 2.0 motor nameplate hp Heating: 1 each - Central Furnace, Gas, Capacity = 288 kBtu/h Proposed Efficiency = 92.00% Et, Required Efficiency: 80.00 % Et Fan System: MAU-1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 6 Supply, Constant Volume, 3698 CFM, 3.0 motor nameplate hp 1 MAU-1 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 252 kBtu/h Proposed Efficiency = 92.00% Et, Required Efficiency: 80.00 % Et Fan System: MAU-2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 7 Supply, Constant Volume, 3240 CFM, 2.0 motor nameplate hp 1 MAU-2 (Single Zone): Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.1.0.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: Chuy's Y:\_Projects\Active\2018\01201828.31\01201828.31.Calcs and Support\182831 COMCHECK.cck 10/22/18Report date: 112 ofPage Elizabeth Elliott, PE 10/22/2018 Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.0.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2012 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Chuy's Y:\_Projects\Active\2018\01201828.31\01201828.31.Calcs and Support\182831 COMCHECK.cck 10/22/18Report date: 113 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C403.2.4. 5 [FO9]3 Freeze protection and snow/ice melting system sensors for future connection to controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Chuy's Y:\_Projects\Active\2018\01201828.31\01201828.31.Calcs and Support\182831 COMCHECK.cck 10/22/18Report date: 114 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.2.3 [ME55]2 HVAC equipment efficiency verified.Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.2.5. 1 [ME59]1 Demand control ventilation provided for spaces >500 sq.ft. and >25 people/1000 sq.ft. occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.7 [ME60]2 HVAC ducts and plenums insulated. Where ducts or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.8. 1 [ME7]3 Piping Insulation exposed to weather is protected from damage (due to sun, moisture, wind, etc.). Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.8 [ME41]3 Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7 [ME10]2 Ducts and plenums sealed based on static pressure and location. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Chuy's Y:\_Projects\Active\2018\01201828.31\01201828.31.Calcs and Support\182831 COMCHECK.cck 10/22/18Report date: 115 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.3.1, C403.3.1. 1 [ME62]1 Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.3.1, C403.3.1. 1 [ME62]1 Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.3.1, C403.3.1. 1 [ME62]1 Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.3.1, C403.3.1. 1 [ME62]1 Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.2. 1 [ME53]3 Air outlets and zone terminal devices have means for air balancing. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Chuy's Y:\_Projects\Active\2018\01201828.31\01201828.31.Calcs and Support\182831 COMCHECK.cck 10/22/18Report date: 116 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.2.6 [ME57]1 Exhaust air energy recovery on systems meeting Table C403.2.6 Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.11 [ME71]2 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Chuy's Y:\_Projects\Active\2018\01201828.31\01201828.31.Calcs and Support\182831 COMCHECK.cck 10/22/18Report date: 117 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 2 [FI38]3 Thermostatic controls have a 5 °F deadband. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 2 [FI20]3 Temperature controls have setpoint overlap restrictions. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3 [FI39]3 Each zone equipped with setback controls using automatic time clock or programmable control system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3 [FI40]3 Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2- hour occupant override, 10-hour backup Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Chuy's Y:\_Projects\Active\2018\01201828.31\01201828.31.Calcs and Support\182831 COMCHECK.cck 10/22/18Report date: 118 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.5. 1 [FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C303.3, C408.2.5. 3 [FI8]3 Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.5. 3 [FI43]1 An air and/or hydronic system balancing report is provided for HVAC systems. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.3. 2 [FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.2 [FI27]3 HVAC systems and equipment capacity does not exceed calculated loads. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.1 [FI28]1 Commissioning plan developed by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.4 [FI29]1 Preliminary commissioning report completed and certified by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.5. 4 [FI30]1 Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Chuy's Y:\_Projects\Active\2018\01201828.31\01201828.31.Calcs and Support\182831 COMCHECK.cck 10/22/18Report date: 119 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C408.2.3. 1 [FI31]1 HVAC equipment has been tested to ensure proper operation. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.3. 3 [FI32]1 Economizers have been tested to ensure proper operation. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Chuy's Y:\_Projects\Active\2018\01201828.31\01201828.31.Calcs and Support\182831 COMCHECK.cck 10/22/18Report date: 1110 ofPage Project Title: Data filename: Chuy's Y:\_Projects\Active\2018\01201828.31\01201828.31.Calcs and Support\182831 COMCHECK.cck 10/22/18Report date: 1111 ofPage