HomeMy WebLinkAboutA001 Site PlanReflective aluminum sign
Van accessible reflective
aluminum sign where occurs
2" Dia. galvanized steel pipe
Sloped for drainage
1/2" premolded expansion joint
filler w/ bulking top
Concrete slab orasphalt
paving as occurs
Concrete Footing
Note:
Verify location of underground
utilities before drilling for
concrete foundation.
n Detail - Accessible Parking
112 = 1'-0"
® e a
n Detail - Bollard
1/2" = 1'i
Rounded concrete cap
Standard 6" D steel pipe
filled w/ concrete.
Paint 2 coats '7raRic yellow"
Sloped for drainage
1/2" premoltletl expansion joint
filler w/sealant top
Concrete slab or asphalt
Paving as occurs
Concrete Footing
Note:
Verify location of underground
utilities before drilling for
concrete foundation.
/T Detail - To -Go Sign
1/2" = 1'-0"
Chuys To -Go
parking signage
by owner
2" Dia. galvanized steel pipe
Sloped for drainage
1/2" premoltletl expansion joint
filler w/ cu lking top
Concrete slab or asphalt
Paving as occurs
Concrete Footing
more:
Verify location of underground
utilities before drilling for
concrete foundation.
General Notes = Site Plan
1
Protect area is limited to scope of work boundary line. All other site items shown are NIC and shown for
reference only unless noted otherwise.
2
For utility tie-in information, reference MEP and civil drawings.
3
Lantlscepe shown for reference only. Refer to the landscape plan.
LOI
Uitility Requirements
1
Landlord re provide ELECTRICAL SERVICE
2
Landlord to provide WATER SERVICE
3
Landlord to provide GAS SERVICE
4
Landlord to provide SANITARY SERVICE
5
Landlord to provide STORM SERVICE AND RETENTION
6
Landlord to provide FIRE SUPRESSION WATER MAIN
7
Landlord to provide TELEPHONE SERVICE
8
Landlord to provide GREASE WASTE
9
Landlord to provide FIRE HYDRANTS
Legend -
Site Plan
Property Line
Integral Colored Concrete
•- - (Solomon - CLAY 413)
Property Setback Line
— - - Landscape Easement
------. Scope of Work
III--------------- Accessible Path of Travel
® Accessible Parking(NIC)
Landscape Area - Reference
landscape drawings
Plan note
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
J
W
W
J
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
J
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
US 421 (Michigan RD)
m
r-
�E7
rNh
vN
U
H �.7
� m
m
y oN
U
N c
pcb
L
C --
o
a�°E
U V U
3
UCU
0 3
o
C
5
U
Carmel
(Zionsville), IN
10325 N. Michigan RD.
Carmel, IN 46032
Owner:
Chuys OPCO
1623 Tommy Road
Austin, TX. 78704
Ph: (512) 473-2783
Contact: Michael Hatcher
Architect:
Parkway CBA, LP
1000 Civic Circle
Lewisville, TX. 75067
Ph: (469) 322-3714
Project Contact: Bill Pounds, AIA
MEP Engineer:
Diaelectic Engineering
310 W. 20th Street
Suite 200
Kansas City, MO 64108
Ph: (816) 997-9627
Contact: Joe Hillebrenner, P.E.
Structural Engineer:
Armstrong -Douglas
6060 N. Central Expressway
Suite 800
Dallas, TX 76206
Ph- (214) 237-7022
Contact: Scott Armstrong, P.E.
Landscape Architect:
Belle Firma, Inc.
4245 North Central Expy.
Suite 501
Dallas, Texas 75205
Ph: (214) 865-7192
Contact: Kon Haug, ASLA, CLARB
Architect Greg Klini
Date
Author
Checker
04-97221
t C4'. - "1-..1- B
Site Plan
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Carmel
'�"lgi
DATE: V,5/LD/-1U
A001