Loading...
HomeMy WebLinkAboutA105 Standard Details and Mop SinkMechanical fasteners Base sheet TPO Plumbing Vent Wall covering - TPO membrane Sealant Stainless Steel Clamp Scupper set in mastic D and nailed at 3" o.c. Base ply -TPO ?z i@`m flashing membrane E __ __ N c g — — — 'u 5 ` Balance of roof membrane ¢ y u_ Roofing i Insulation Base ply - TPO Roof Deck n Scupper Isometric- Elevatorl Water proofing membrane Folded comer of waterproof membrane Support upturn by nail, staple or sheet metal screws c within 1/2" of top n WP-Inside Comer Detaill Plan RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel 'u"ID n 3,4 M-Vent Flashing2 U 3/4" = 1 eo BUILDING WRAP TO FLASHING DETAIL /cl Tyvek Flashing Detaill Far FRP T&S B-0702 sim gle chemical faucet with - T&SB-0702 single 1/2" NPT female chemical faucet with inlet 1/2" NPT female inlet stainless steel end capw/No 411 stainless steel end cap w/ No.4 finish - Fiat #830 AA service sink faucet Fiat #830-AA service sink faucet Fiat #832 AA 30" hose and hose Fiat#832AA30" — bracket hose and hose bracket stainless steel panel stainless steel pane'r with No.4 finish with No 4 finish 1 n quarry tile base — quarry file base f concrete curb w/ stainless cap- No. 4 finish 2 3 1'� n Ve 1" nt Stack = 1' -p Detaill U Lead flashing at vent stack set in mastic and extend 4" min. on to field of roof. Roll lead flashing 1" min. down into pipe. Prime metal before stripping Plumbing vent stack TPO flashing membrane extend 12" min. from vent pipe TPO roofing Roof insulation Rai 18" fluid applied water proofing membrane 5/8 type "X" green board Do not penetrate backer board 2x wood stud FRP panel as scheduled, lap onto metal cleat 2x woad blacking centered at joint --- ' Metal cleat Tile base Kitchen pass-ihru 1/2" Dens shield file backer board tg Backer had & sealant at window 18" AFF. No horizontal joints permitted. Center perimeter joint all around vertical joint on stud with 2" glass fiber mesh tape set in skim coat of latex mortar. Solid fill joint with Membrane to bra e latex mortar. height = only in offices S.S. shelves kitchen equipmm ent Exterior sheathing manufacturer Stainless steel wall cap, extend up or resistive barrier to ceiling loor tile 2x bottom plate as scheduled Wall type as scheduled- - -' Thou wall flashing _ ref. floor plan Sipping m Thin set mortar bed 1H FRP T&S B-0702 single chemical faucet with 1/2" NPT female inlet stainless steel end cap with No. 4 finish Fiat #8301 service sink faucet Fiat #832-AA 30" hose and hose bracket stainless steel panel with No.4 finish quarry tile base concrete curb w/ stainless 7 Section (a Kitchen Pass-thrul 3/41, = 111 ISO Water Detail (Typical at Kitchen, Sealant & backer rod Full perimeter sealant sa Y darn E� 7 NNM YN F— O rn .0 J ° N U Y vrn .ud. d Q J of u m ^Yj } Uho a J U m Y �.3Zea z a` ca L1W Carmel (Zionsville), IN 10325 N. Michigan RD. Carmel, IN 46032 owner: Chuys OPCO 1623 Toomy Road Austin, TX. 78704 Ph: (512) 473-2783 Contact: Michael Hatcher Architect: Parkway CM, LP 1000 Civic Circle Lewisville, TX. 75067 Ph: (469) 322-3714 Project Contact: Bill Pounds, AIA MEP Engineer: Diaelectic Engineering 310 W. 20th Street Suite 200 Kansas City, MO 64108 Ph: (816) 997-9627 Contact: Joe Hillebrenner, P.E. Structural Engineer: Armstrong -Douglas 6060 N. Central Expressway Suite 800 Dallas, TX 76206 Ph- (214) 237-7022 Contact: Scott Armstrong, P.E. Landscape Architect: Belle Firma, Inc. 4245 North Central Expy. Suite 501 Dallas, Texas 75205 Ph: (214) 865-7192 Contact: Kon Haug, ASLA, CLARB Architect: Greg Klimko 73(1 stainless steel cap w/ silicone adhesive or hemmed edge (no. 4 grout setting s betl finih) tl4 continuous sealant concrete curb A Permit10.23.18 #3 @ 12" o.c. a quarry tile cove base No. Description Date drill and epoxy set epoxy grout dowels if curb not A Author poured integrally quarry tile Checker - -I ri I I I I I I I I 1--- - 04-97221 Standard Details & Mop Sink Mop Sink Curb DetaillSink Curb Detaill DATE: 1-1`J Al05