HomeMy WebLinkAboutA105 Standard Details and Mop SinkMechanical fasteners
Base sheet TPO
Plumbing Vent
Wall covering - TPO
membrane
Sealant
Stainless Steel Clamp
Scupper set in mastic
D
and nailed at 3" o.c.
Base ply -TPO
?z
i@`m
flashing membrane
E __ __ N
c
g
— — —
'u
5 `
Balance of roof membrane
¢ y u_
Roofing
i
Insulation
Base ply - TPO
Roof Deck
n Scupper Isometric- Elevatorl
Water proofing
membrane
Folded comer of
waterproof
membrane
Support upturn by nail,
staple or sheet metal screws
c within 1/2" of top
n WP-Inside Comer Detaill
Plan
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Carmel
'u"ID
n 3,4 M-Vent Flashing2
U 3/4" = 1 eo
BUILDING WRAP TO FLASHING DETAIL
/cl Tyvek Flashing Detaill
Far
FRP
T&S B-0702 sim gle
chemical faucet with
- T&SB-0702 single
1/2" NPT female
chemical faucet with
inlet
1/2" NPT female
inlet
stainless steel end
capw/No 411
stainless steel end
cap w/ No.4 finish -
Fiat #830 AA
service sink faucet
Fiat #830-AA
service sink faucet
Fiat #832 AA 30"
hose and hose
Fiat#832AA30" —
bracket
hose and hose
bracket
stainless steel panel
stainless steel pane'r
with No.4 finish
with No 4 finish
1
n quarry tile base —
quarry file base f
concrete curb w/
stainless cap-
No. 4 finish
2
3
1'�
n Ve
1" nt Stack
= 1' -p Detaill
U
Lead flashing at vent stack
set in mastic and extend 4" min.
on to field of roof. Roll lead flashing
1" min. down into pipe. Prime metal
before stripping
Plumbing vent stack
TPO flashing membrane
extend 12" min. from vent pipe
TPO roofing
Roof insulation
Rai
18" fluid applied water proofing
membrane
5/8 type "X" green board
Do not penetrate backer board
2x wood stud
FRP panel as scheduled,
lap onto metal cleat
2x woad blacking
centered at joint ---
' Metal cleat
Tile base
Kitchen pass-ihru 1/2" Dens shield file backer board tg
Backer had & sealant at
window 18" AFF. No horizontal joints permitted. Center
perimeter joint all around
vertical joint on stud with 2" glass fiber mesh tape
set in skim coat of latex mortar. Solid fill joint with
Membrane to bra
e
latex mortar.
height
=
only in offices
S.S. shelves
kitchen equipmm ent
Exterior sheathing
manufacturer
Stainless steel wall cap, extend up
or resistive barrier
to ceiling
loor tile
2x bottom plate
as scheduled
Wall type as
scheduled-
- -'
Thou wall flashing
_
ref. floor plan
Sipping m
Thin set mortar bed
1H
FRP
T&S B-0702 single
chemical faucet with
1/2" NPT female
inlet
stainless steel end
cap with No. 4 finish
Fiat #8301
service sink faucet
Fiat #832-AA 30"
hose and hose
bracket
stainless steel panel
with No.4 finish
quarry tile base
concrete curb w/ stainless
7 Section (a Kitchen Pass-thrul 3/41, = 111
ISO
Water
Detail (Typical at Kitchen,
Sealant & backer rod
Full perimeter sealant
sa
Y
darn E�
7
NNM YN
F— O rn
.0
J
° N U
Y
vrn
.ud. d
Q
J
of
u m
^Yj
} Uho
a
J
U m
Y
�.3Zea
z
a` ca
L1W
Carmel
(Zionsville), IN
10325 N. Michigan RD.
Carmel, IN 46032
owner:
Chuys OPCO
1623 Toomy Road
Austin, TX. 78704
Ph: (512) 473-2783
Contact: Michael Hatcher
Architect:
Parkway CM, LP
1000 Civic Circle
Lewisville, TX. 75067
Ph: (469) 322-3714
Project Contact: Bill Pounds, AIA
MEP Engineer:
Diaelectic Engineering
310 W. 20th Street
Suite 200
Kansas City, MO 64108
Ph: (816) 997-9627
Contact: Joe Hillebrenner, P.E.
Structural Engineer:
Armstrong -Douglas
6060 N. Central Expressway
Suite 800
Dallas, TX 76206
Ph- (214) 237-7022
Contact: Scott Armstrong, P.E.
Landscape Architect:
Belle Firma, Inc.
4245 North Central Expy.
Suite 501
Dallas, Texas 75205
Ph: (214) 865-7192
Contact: Kon Haug, ASLA, CLARB
Architect: Greg Klimko
73(1 stainless steel cap w/
silicone adhesive or hemmed edge (no. 4
grout setting s betl finih)
tl4 continuous sealant
concrete curb A Permit10.23.18
#3 @ 12" o.c. a quarry tile cove base No. Description Date
drill and epoxy set epoxy grout
dowels if curb not A Author
poured integrally quarry tile
Checker
- -I ri I I I I I I I I 1--- - 04-97221
Standard Details & Mop
Sink
Mop Sink Curb DetaillSink Curb Detaill
DATE: 1-1`J
Al05