Loading...
HomeMy WebLinkAboutA111 Floor Finish PlanCeramic floor tile sloped from floor edge at 1/4" per foot max (2%) at floor transitions Schluter- Schiene floor edge transition 5/8" concrete paver tile ��°:•�•v�4:�®rOOrO�V�e��es Quarry tile Schluter - Schiene floor edge transition 518" concrete paver tile n Floor Transition - Paver to Ceramic n Floor Transition - Paver to Quarry 6,� = 1 _0" 6, = 11 n Threshold detail - Conrete to Concrete T=1_0" RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel ' u"Igi Door shoe wl weatherstripping Thresholtl -Gadus PTR1 MPTB12, Dove 2x blocking Finish Floor Vinyl composition tile over 3/4" thick carpet shims sloped from floor edge at 114 per max 2% Grind the shim to allow for VCT Schluter - Schiene floor Threshold - Gadus ATR45 transition to be smooth, 1/1V max edge transition A160 PBT12, Aluminum 5/8" concrete paver tile Threshold - Ferree 259 Aluminum 7777 Y •.4 2x blocking Concrete slab 2x Blocking n Floor Transition - Paver to VCT /1 Floor Transition - Paver to Concrete Tile Finishes as scheduled Threshold - Gadus ATR45 PBT12, Aluminum ""' ' —""' ' - Concrete slab Nancile a slab `� `"4.' n Threshold detail -Tile to Concrete T=1_0" General Notes so Interior Finish 1 Ensure surfaces to receive finished are clean, true and free of irregularities. Do not proceed with work until unsatisfactory conditions have been corrected. 2 No finish substitutions maybe made without priorwritten authorization by Architect. 3 All finishes shall be applied in said accordance with manufacturers specifications. 4 Provide temporary protection for all installed finishes as work progresses. 5 Submit samples of finshes for approval prior to installation. 6 All paint shall be applied in accordance with the manufacturers specifications for that particular surface. 7 Examine walls to ensure proper preparation before application of paint. Beginning work implies acceptance of condition. 8 Paint fin ish on su rfaces including:doom, door fames, guardrails, etc shall be factory fin lanes semigloss, unless noted otherwise. If painting over existing paint the surface must be prepped and primed to accept new paint. 9 All wet areas will receive ceramic paint. 10 All flooring transitions between rooms shall be at the center of the door. See details for all interior fin ish material transitions. 11 Flooring shall meet all current non -slip standards and requirements (wet and dry conditions) specified in applicable codes anclor authorities. 12 For floor sink floor Bain and trench Bain dimensions refer to sheet At 12. Ensure slab is adjusted with a 24" ratlius slopetl to tlrain at 1/4" per foot. 13 All workmanship shall be of the best quality. When the work is complete, it shall be free from buckles, bubbles, open joints or imperfections. Seams shall be kept in accurate alignment along both coordinates. 14 Paint all exposed structural columns. q E Y ko E� ~N� mrn it J N Q Y .w 0rn d Q J of u 0 Q V U z3 UCU J LL U 7 0no Y o16 o `0 Z U Legend - Floor Drain Plan * _ Hub Drain i j 1 il�r. Floor Drain 1 / -Concrete slab slopes a 1/4"per foot at 24"adius r Floor Sink ' 1i r 1 1 Trench Drain L__- —J Existing Floor Cain -Concrete slab slopes a 114" perfect at 24" radius ml Schedule is Floor Finish Mark Series / Manufacturer Description Model (0.5paillyard) Color Resp. CC-1 Soloman Integral Colored Concrete Clay 413 Liquid CFCI CON Sealed concrete CFCI CP-A Tiara y Fuego Barcelona Tile Bx8 Field Tile 'Pattern OFCI CP-AB Tiemby Fuego Barcelona Tile US Border Tile 'Pattern OFCI CP-B Tiara y Fuego Barcelona Tile Bx8 Field Tile 'Pattern OFCI CP-BB Tiacay Fuego Barcelona Tile US Border Tile 'Pattern OFCI CP-C Time y Fuego Barcelona Tile Bx8 Field Tile 'Pattern OFCI CP-CB Timmy Fuego Barcelona Tile US Border Tile 'Pattern OFCI CP-D Tierce y Fuego Barcelona Tile Bx8 Field Tile 'Pattern OFCI CP-DB Tieray Fuego Barcelona Tile &a Border Tile 'Pattern OFCI CP-E Tierce y Fuego Barcelona Tile Bx8 Field Tile 'Pattern OFCI CP-EB Tierray Fuego Barcelona Tile 8x8 Border Tile 'Pattern OFCI CP-F Time y Fuego Barcelona Tile Bx8 Field Tile 'Pattern OFCI CP-FB Tiermy Fuego Barcelona Tile US Border Tile 'Patk:rn OFCI CP-G Tierra y Fuego Barcelona Tile 8x8 Field Tile 'Pattern OFCI CP-GB Timmy Fuego Barcelona Tile US Border Tile 'Pattern OFCI CP-HEX Timmy Fuego Barcelona Tile Hexagonal Tile 'Pattern OFCI CP-HEX-B Timmy Fuego Barcelona Tile US Border Tile 'Pattern OFCI CP-I Tierce y Fuego Barcelona Tile Bx8 Field Tile 'Pattern OFCI CP-J Tierce y Fuego Barcelona Tile Bx8 Field Tile 'Pattern OFCI CP-JB Tieray Fuego Barcelona Tile US Border Tile 'Pattern OFCI CP-K Tiara y Fuego Barcelona Tile Bx8 Field Tile 'Pattern OFCI CP-KB Timmy Fuego Barcelona Tile US Border Tile 'Pattern OFCI PCT-01 Daltile Continental Slate 12xl2(75%y6x6 Brazilian Green CFCI QT-01 Daltile Suretmed and Pavers US Field Tile Red Suretread 0081 CFCI QT-02 Daltile ISuretread and Pavers I 6x6 Field Tile I Golden Brown 00751 CFCI VCT Checker board pattern (4x4) 51983 Party W hite (Group of 4 tiles) 50 % of Pattern Each 4x4 Colored benern consists of the colors below 51818 Violet Bloom (Group of 4 Tiles) 51824 Sea Green (Group of 4 Tiles) 51820 Marina Blue (Group of 4 Tiles) 51944 Tynan Purple (Group of 4 Tiles) 51812 Lemon Yellow (Group of 4 5191 5191 0 Classic Black (Group of 4 Tiles) 51816 Cherry Red (Group of 4 Tiles) 51813 Pumpkin Orange (Group of 4 Tiles) Schluter - Tneo-G-B, GB EB 130 in aluminum (A) 518" concrete paver tile Existing Blocks at stairs — porcelain tile base Door as scheduled Finish Floor Door shoe w/ weatherstripping Threshold - Gradus PBT12, Aluminum 2x blocking -- Exterior Sidewalk New filler Concrete slab Stan tile at stair transition Carmel (Zionsville), IN 10325 N. Michigan RD. Carmel, IN 46032 Owner: Chuys OPCO 1623 Toomy Road Austin, TX. 78704 Ph: (512) 473-2783 Contact: Michael Hatcher Architect: Parkway CBA, LP 1000 Civic Circle Lewisville, TX. 75067 Ph: (469) 322-3714 Project Contact: Bill Pounds, AIA MEP Engineer Diaelectic Engineering 310 W. 20th Street Suite 200 Kansas City, MO 64108 Ph: (816) 997-9627 Contact: Joe Hillebrenner, P.E. Structural Engineer: Armstrong -Douglas 6060 N. Central Expressway Suite 800 Dallas, TX 76206 Ph' (214) 237-7022 Contact: Scott Armstrong, P.E. Landscape Architect: Belle Firma, Inc. 4245 North Central Expy. Suite 501 Dallas, Texas 75205 Ph: (214) 865-7192 Contact: Kon Haug, ASLA, CLARB Architect: Greg Klimko Description Date Author Checker 04-97221 Lo Floor Finish Plan DATE: V,5/LD/-1`J Flo 6!or Transition -Stairs Nosing = 1 _0„ A111