HomeMy WebLinkAboutA141 Roof PlanBase bottom
Packaged unit
Fiberglass insulation
Nailer strip
Coutinuous flashing
Cant strip
Rigid insulation
Roof curb f
anchored
to top of ro
structure
Cant strip
Field room
2' above tc
Roof insole
Roofing material v Field of roofing
n Roof curb /cl Roof Curb Isometric
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations )ofF
at State and Local Codes '4"=
City of Carmel
Roof curb with 2x wood
nailer top
Flashing cement
Corners wrap with fiber tape
and flashing cement. Do not
out off flaps
TPO flashing membrane
Extend 6' on to field of roofing
1'�
Lead flashing at vent stack
set in mastic and extend 4' min.
on to field of roof. Roll lead flashing
1' min. down into pipe. Prime metal
before stripping
Plumbing vent stack
TPO flashing membrane
extend 12' min. from vent pipe
TPO roofing
Roof insulation
Roof deck
n LJ A141 Vent Stack Detail
1" = 1'-0"
n A141 Scupper Isometric
1 1 /2" - 1'-0"
Mechanics fasteners
Base sheet TPO
Wall covering - TPO
membrane
Scupper set in mastic
and nailed at 3' o.c.
Base ply - TPO
flashing membrane
Balance of roof membrane
Base ply - TPO
C-----------------------------------------------------------------------------------------
General Notes - Roof Plan
All work 0 be performed in strict accordance with the roofing manufacturer's
recommendations. Reference specifications.
1
2
Verify that all areas am provided with positive drainage at 1/4' per foot minimum.
3
All cricketsdlashing to have a slope of 1/2' per fool minimum.
4
Provide crickets/flashing around curbed roof openings.
5
All cap flashing corner shall be welded.
6
Refer to mechanical, plumbing and electrical for locations of piping, curbs, vents, ducts,
fans and other items on the roof surface.
7
All plumbing, mechanical and electrical lines to receive pillow blocks at 4'-0' apart
maximum unless noted otherwise. For details refer to Plumbing.
8
Provide a secondary grease roof protection similar to Rooftop Solutions - G2 Grease
Guard Rooftop Defense System for EF 41 through 45. Reference mechanical drawings.
9
Verify sins and locations of all openings, platforms, at. with respective contractors.
10
Do not penetrate paparet wall caps.
11
Provide roof jacks at all exposed roof penetrations.
12
All wall mounted and rooftop mechanical equipment will need to be screened from the
public right-of-way/street view.
Legend = Roof Plan
Class 'A' TPO Membrane Roofing System
to
-Refer specification
Bad Cricket- Rigid Tapered Insulation
PAM
Roof Walk Pad
Slope
Slope for 1/4' per foot minimum
flaw to drain unless noted otherwise
O OD
Roof Crain and Overflow Crain
-Referto detail on sheet A310
TD-X
Mechanical Equipment
-Ref. Mechanical
/
Roof Hatch
Existing
Roof
Schedule ji
Mark
Manufacturer
Senes/Descr.
I Model Color
RF-1
GAF
EverGuardSingle
Ply TPO
TP060mil Membranc R-30 White
Rigid Insulation
RF-E
Existingto
remain
Roof Deck
rn
V
z
odic
aM>
E
_
g
'CEon
Roof Deck
Hurricane straps
typ. at (4) corners
(If required by code)
Condenser equipment
bolted to curb
1 1/2'x6' 10 Ga. gall straps
each corners with (4)
#12 self tapping screws
(2) 2x8 wood (Treated)
L2 1/2x2 1/2X3/16 coot
#12 screws @ 12' o.c.
2xsupports
Line
bane
rable Sealer
urft
elation
Carmel
(Zionsville), IN
10325 N. Michigan RD.
Carmel, IN 46032
Owner:
Chuys OPCO
1623 Toomy Road
Austin, TX. 78704
Ph: (512) 473-2783
Contact: Michael Hatcher
Architect:
Parkway CBA, LP
1000 Civic Circle
Lewisville, TX. 75067
Ph: (469) 322-3714
Project Contact: Bill Pounds, AIA
MEP Engineer:
Diaelectic Engineering
310 W. 20th Street
Suite 200
Kansas City, MO 64108
Ph: (816) 997-9627
Contact: Joe Hillebrenner, P.E.
Structural Engineer:
Armstrong -Douglas
6060 N. Central Expressway
Suite 800
Dallas, TX 76206
Ph' (214) 237-7022
Contact: Scoff Armstrong, P.E.
Landscape Architect:
Belle Firma, Inc.
4245 North Control Expy.
Suite 501
Dallas, Texas 75205
Ph: (214) 865-7192
Contact: Kon Haug, ASLA, CLARB
Architect: Greg Klimko
'ermlt
10.23.18
Description
Date
Author
Checker
04-97221
Ira m
Roof Plan
DATE: V.5/LD/-1`J
�M-Cu b
3• - 1'-0,
A141