HomeMy WebLinkAboutD101 Demolition Floor Plan.7
E
Patch and repair any damaged
areas at dumpster yard and
receHing service yard
Remove tread plate from
walk-in beer molar. Patch
and repair floor as needed.
Remove all
material, prep for
new materials
r
Remove water closets,
urinals, vanities, wall
\ partitions, doors&
fame, gab bars, and
toilet accessories
II II
1111 ly,�l IIIIF I�,.�I ill
11
1J LLI li
Remove panels /
Remove eletronic
devices and controls
for lighting --------
Remove millwork
eaaaacaaaaaaaaaaa=30 I �I
O
Replace metal cooler base trim
" 3 � with quarry file base
r A202
I � Remove coder door and Name
,
L_�____\__J
e
Existing floor drain/sink J
Remove metal to be removed and
door &frame, capped.
and threshold �\\ `-.
Remove FRP and \
4 stainless steel, T
DBfP. PANEL
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and local Codes oor
City off Camel �}
lj rt"Imr�DolAl_
^J
Sawcut opening. Pot
double channel lintel
stud packs on either
/of ope
R
HEALER
o Remove Door,
prep for new door
and hardware
Existing flpordmin/sink
I
fill
to be removed
and
capped.
I
® I
I
I
I
I
I
I
EE
I
® I
Remove vertical
i G - -
hood plenum I
I
I
I
I
I
I
Remove quarry file
_- -
flooring, prep floor I
for flooding
Remove panels -
material
Remove wall
I
Partition
I
.Raise gas line m that it
does not
'prevent kitchen equipment
from
�- -
being pushed back I
Existing floor drain/sink
to be removed and
I
I
capped.
2
D201
Beal -board wainscot to remain. Remove base
molding, Typ.
- - - Prep for Tile Rncc
I � `/�I 1j 'I 1. II HII 1 I 11 IIII I I I I
II llavx4e"I IIII 1 9o•x4e"I IIII borMly I IIII I13ox "I 'I1'lamx4e"I III
1130"HIII IIII 30" H 1 1 IIII t s°" H I I I I 1 1 30' I III 30"HII i l� --
Prep for palnflng. II 1 1 1, IIII 1 1 IIII IIII IIII HIII �I 41^xrs
Remov - k
2 carps 3 Remove booths
Remove Counter Top Remove wall covering and prep i°�
Repair Bead Board to match existing--- for painting, Typ.
DN Ir-h 1-1 Ffi -1 rr�
emove tables &chairs
77 IL J3o•xae•L � 'L J3ox4e• 1 � ao•x4e•�- � 'L x L -1L Jamx4e•L A- -
L4lWH l-1 rr 4-t30" r -i L4l "r--1 Ir4l W" -1 L4l WHf 4- -1 xae• 11 WXB
LI I� LI I� LI Ir Iy LI Iy LI Iy 30"H 1 rI
-r�1 - ---
I I I
-I ---- -� --- -�-- -� - ---- - ----1- rl �� -----
3ox49• 3o•x4e• 3o•X4e• 301 3o"x4e• fL Remove
42" H 42" H 42" H 42" H 42" H aryet oo"X60"
�r_4I I��(-�1 �r_4J I��r_4t I��(-_41 3v H" I I �- --H--
Remove booths 6 l L
\ Remove carpet tiles Bead -board wainscot ('
on amp to remain
Remove base molding, typ. ii _n 38" in (~ -1
Prep for Tile Base L42^ H IL 1 30"X80"
30H �-----
-�J_E�}�J_�zi- �� Removewall,------
y meows nd prepfor =
----------- - �\\\ 6� Ld and Prep for ____
... �{ \ �� Painting. TyP. - -
--
�Y z y Remove _ ' :-'r `-' /
---- - \ -- - Remove caunterta
case work -1- � 1151 L \ P71 4Ts
2:
entirely N\i h% \ 42• H r
----- Existing floor drain/sinlf.// ('?[
to be removesand /" �il.dIFI Jw� Remove quaff the
® and
capped. ITS blocking from bar die wall
base entirety, prepare for new
coot curb next to existing curb
Remove j // /� 38" °
bead -board L 42 " _J
wainscot Remove e J \
entirely L l l L ll
g-6 I L J
Sawcut and remove rl
Remove concrete curb&bar die
cannot tiles wall at dashed area.
oo remp
C , C Remove tables & chains �\
L �1 4e•o IT-1 L �1 48"_ IT-1 L �l as"- (jam
Ion L� 42"H J_A L_�J 42"H LL_J L f 42"H LL_J
—► / Remove Wood Post, Cap, Bead-
X ��L- !� board wainscot, and base an this
side of low wall, prep for wall
Remove Wood Cap, prep
- - - - forwall extension on this -
side of low III only
L--
Relocate disconnect for
I
® booster heater and dishwash
®
extension f- (T -1
"p. L J 1, l -111- �X60^I -1
A-1rt A- -Il rt L -h rt Ir -h rt -1 L j 1 3o H
L J3ox4a^L -1 L J3ox4a^L -1 L Jw,Ik46" .y L J3o'x46"� -1
F W H f- -1 Fr W H f- -1 rr � " -1 Ir +) W " -1 L 4J _f
ILJ - 1.1_�' ILJ - 1.1_�' IL --- �' ILJ - 1.1_�'
Bead -board
Remove tables &chains wainscot 8 Base
o remain
-- Remove carpet_- -
I II I � I I II I I� II I I II II II � I I II
II 130"11 I IIII I bo^x4e^I I IIII I laox4e^I I IIII I lao^x4e^I I IIII 1 13o"x4e^I 1
%III 30^" IIII 30H� IIII 30" H II 301 IIII 30" H
::'. II II II IIII II II IIII II II III II II IIII II II
Remove booths
sWH 3o"H
Is e 6= I --
I```"`
J L J 1 30"X60"
36x4e• I II 3a^H
rr 30"H r---
1 ---
���d IE---=_
Remove tables & chairs
Gypsum board
walls to remain
Remove floor tile
- - -at Vestibule
r� and Entry
-f-P Remove Bead -board
1 and wood cap at top.
Prep for wall addition
in height
Remove millwork
- Remove existing wall I'
finishes, prep for new III
addition to the wall
- Remove bench
seat_nP= - - - _�
General Notes - Dem
Key Name
I Demo Note
1
1 Reference SWctural for shoring requirements
2
lRelocated items shall be removed carefully and stored for future use during this project.
3
1 Remove items shall be removed from the site and legally disposed of.
EX
Q
emolition Not
Z
01
Remove all dining furniture & Carpet. Remove wall covering and prep for painting. Typical for all area.
02
Bead -board wainscot to remain. Remove base molding,
prep for tile base, Typ.
_53
Remove entire entry door and sidelight assembly. (including
frame and threshold)
04
Remove window. Solvent opening for new door. Remove wall assembly down b slab edge.
05
Replace wood slats with Tons. Steel frame is to remained.
06
Remove carpet tiles on romp.
07
Remove bead -board wainscot entirely.
OB
Exisfing bar counter, bar wall and curb to be removed..
09
Sawcut and remove concrete curb & bar the wall at area indicated.
concrete curb & bar the wall entirely at dashed area.
10
Existing toilet partitions, water closets, urinals and lavatories to be removed.
I I
Remove entire door assembly. (including fame and threshold)
12
13
A
14
16
Legend - Demolitionwl
--------------------- Portion to be demolished Area to be demolished
Remove window, remove wall assembly
and sawcut opel
- Remove Bead -board base.
Prep for low wall addition
adjacent to existing
=1)
c
Grind Concrete 1/2" down or
slab recess to allow gradual
slope, and allow the
regroltl installation Per
80"2/A111
Remove entry door& 3
n / sitlelite
a doorframes D201
Replace existing wall
heater with new spec
Beatl-board wainscot
to remain
Remove base molding,
Typ.
Prep for Tile Base
EO�
E�
�Nr
uN
v�i
J
_ inN
ry
0
L EN
U
N Qm
J
to of
Q
U UU
}
U ."".c
IL
U
0 3
Y
O
a
5
U
Carmel
(Zionsville), IN
10325 N. Michigan RD.
Carmel, IN 46032
Owner:
Chuys OPCO
1623 Toomy Road
Austin, TX. 78704
Ph: (512) 473-2783
Contact: Michael Hatcher
Architect:
Parkway C&A, LP
1000 Civic Circle
Lewisville, TX. 75067
Ph: (469) 322-3714
Project Contact: Bill Pounds, AIA
MEP Engineer:
Diaelectic Engineering
310 W. 20th Street
Suite 200
Kansas City, MO 64108
Ph: (816) 997-9627
Contact: Joe Hillebrenner, P.E.
Structural Enalneer:
Armstrong -Douglas
6060 N. Central Expressway
Suite 800
Dallas, TX 76206
Ph" 214 237-7022
Contact: Scoff Armstrong, P.E.
Landscape Architect:
Belle Firma, Inc.
4245 North Central Expy.
Suite 501
Dallas, Texas 75205
Ph: (214) 865-7192
Contact: Kon Haug, ASLA, CLARB
Architect: Greg Klimko
\ I Remove wall WIMIPDXII
covering/decoration and
Removewall 2 prep for painting, Typ. A Permit 10.23.18
covering andNo. Description Date
prep for painting,TYP Author
Checker
04-97221
I Ono. _ -Q
Demolition Floor Plan
DATE: 11.5/Lo/ -1 U
D101