Loading...
HomeMy WebLinkAboutD101 Demolition Floor Plan.7 E Patch and repair any damaged areas at dumpster yard and receHing service yard Remove tread plate from walk-in beer molar. Patch and repair floor as needed. Remove all material, prep for new materials r Remove water closets, urinals, vanities, wall \ partitions, doors& fame, gab bars, and toilet accessories II II 1111 ly,�l IIIIF I�,.�I ill 11 1J LLI li Remove panels / Remove eletronic devices and controls for lighting -------- Remove millwork eaaaacaaaaaaaaaaa=30 I �I O Replace metal cooler base trim " 3 � with quarry file base r A202 I � Remove coder door and Name , L_�____\__J e Existing floor drain/sink J Remove metal to be removed and door &frame, capped. and threshold �\\ `-. Remove FRP and \ 4 stainless steel, T DBfP. PANEL RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and local Codes oor City off Camel �} lj rt"Imr�DolAl_ ^J Sawcut opening. Pot double channel lintel stud packs on either /of ope R HEALER o Remove Door, prep for new door and hardware Existing flpordmin/sink I fill to be removed and capped. I ® I I I I I I I EE I ® I Remove vertical i G - - hood plenum I I I I I I I Remove quarry file _- - flooring, prep floor I for flooding Remove panels - material Remove wall I Partition I .Raise gas line m that it does not 'prevent kitchen equipment from �- - being pushed back I Existing floor drain/sink to be removed and I I capped. 2 D201 Beal -board wainscot to remain. Remove base molding, Typ. - - - Prep for Tile Rncc I � `/�I 1j 'I 1. II HII 1 I 11 IIII I I I I II llavx4e"I IIII 1 9o•x4e"I IIII borMly I IIII I13ox "I 'I1'lamx4e"I III 1130"HIII IIII 30" H 1 1 IIII t s°" H I I I I 1 1 30' I III 30"HII i l� -- Prep for palnflng. II 1 1 1, IIII 1 1 IIII IIII IIII HIII �I 41^xrs Remov - k 2 carps 3 Remove booths Remove Counter Top Remove wall covering and prep i°� Repair Bead Board to match existing--- for painting, Typ. DN Ir-h 1-1 F­fi -1 rr� emove tables &chairs 77 IL J3o•xae•L � 'L J3ox4e• 1 � ao•x4e•�- � 'L x L -1L Jamx4e•L A- - L4lWH l-1 rr 4-t30" r -i L4l "r-­-1 Ir4l W" -1 L4l WHf 4- -1 xae• 11 WXB LI I� LI I� LI Ir Iy LI Iy LI Iy 30"H 1 rI -r�1 - --- I I I -I ---- -� --- -�-- -� - ---- - ----1- rl �� ----- 3ox49• 3o•x4e• 3o•X4e• 301 3o"x4e• fL Remove 42" H 42" H 42" H 42" H 42" H aryet oo"X60" �r_4I I��(-�1 �r_4J I��r_4t I��(-_41 3v H" I I �- --H-- Remove booths 6 l L \ Remove carpet tiles Bead -board wainscot (' on amp to remain Remove base molding, typ. ii _n 38" in (~ -1 Prep for Tile Base L42^ H IL 1 30"X80" 30H �----- -�J_E�}�J_�zi- �� Removewall,------ y meows nd prepfor = ----------- - �\\\ 6� Ld and Prep for ____ ... �{ \ �� Painting. TyP. - - -- �Y z y Remove _ ' :-'r `-' / ---- - \ -- - Remove caunterta case work -1- � 1151 L \ P71 4Ts 2: entirely N\i h% \ 42• H r ----- Existing floor drain/sinlf.// ('?[ to be removesand /" �il.dIFI Jw� Remove quaff the ® and capped. ITS blocking from bar die wall base entirety, prepare for new coot curb next to existing curb Remove j // /� 38" ° bead -board L 42 " _J wainscot Remove e J \ entirely L l l L ll g-6 I L J Sawcut and remove rl Remove concrete curb&bar die cannot tiles wall at dashed area. oo remp C , C Remove tables & chains �\ L �1 4e•o IT-1 L �1 48"_ IT-1 L �l as"- (jam Ion L� 42"H J_A L_�J 42"H LL_J L f 42"H LL_J —► / Remove Wood Post, Cap, Bead- X ��L- !� board wainscot, and base an this side of low wall, prep for wall Remove Wood Cap, prep - - - - forwall extension on this - side of low III only L-- Relocate disconnect for I ® booster heater and dishwash ® extension f- (T -1 "p. L J 1, l -111- �X60^I -1 A-1rt A- -Il rt L -h rt Ir -h rt -1 L j 1 3o H L J3ox4a^L -1 L J3ox4a^L -1 L Jw,Ik46" .y L J3o'x46"� -1 F W H f- -1 Fr W H f- -1 rr � " -1 Ir +) W " -1 L 4J _f ILJ - 1.1_�' ILJ - 1.1_�' IL --- �' ILJ - 1.1_�' Bead -board Remove tables &chains wainscot 8 Base o remain -- Remove carpet_- - I II I � I I II I I� II I I II II II � I I II II 130"11 I IIII I bo^x4e^I I IIII I laox4e^I I IIII I lao^x4e^I I IIII 1 13o"x4e^I 1 %III 30^" IIII 30H� IIII 30" H II 301 IIII 30" H ::'. II II II IIII II II IIII II II III II II IIII II II Remove booths sWH 3o"H Is e 6= I -- I```"` J L J 1 30"X60" 36x4e• I II 3a^H rr 30"H r--- 1 --- ���d IE---=_ Remove tables & chairs Gypsum board walls to remain Remove floor tile - - -at Vestibule r� and Entry -f-P Remove Bead -board 1 and wood cap at top. Prep for wall addition in height Remove millwork - Remove existing wall I' finishes, prep for new III addition to the wall - Remove bench seat_nP= - - - _� General Notes - Dem Key Name I Demo Note 1 1 Reference SWctural for shoring requirements 2 lRelocated items shall be removed carefully and stored for future use during this project. 3 1 Remove items shall be removed from the site and legally disposed of. EX Q emolition Not Z 01 Remove all dining furniture & Carpet. Remove wall covering and prep for painting. Typical for all area. 02 Bead -board wainscot to remain. Remove base molding, prep for tile base, Typ. _53 Remove entire entry door and sidelight assembly. (including frame and threshold) 04 Remove window. Solvent opening for new door. Remove wall assembly down b slab edge. 05 Replace wood slats with Tons. Steel frame is to remained. 06 Remove carpet tiles on romp. 07 Remove bead -board wainscot entirely. OB Exisfing bar counter, bar wall and curb to be removed.. 09 Sawcut and remove concrete curb & bar the wall at area indicated. concrete curb & bar the wall entirely at dashed area. 10 Existing toilet partitions, water closets, urinals and lavatories to be removed. I I Remove entire door assembly. (including fame and threshold) 12 13 A 14 16 Legend - Demolitionwl --------------------- Portion to be demolished Area to be demolished Remove window, remove wall assembly and sawcut opel - Remove Bead -board base. Prep for low wall addition adjacent to existing =1) c Grind Concrete 1/2" down or slab recess to allow gradual slope, and allow the regroltl installation Per 80"2/A111 Remove entry door& 3 n / sitlelite a doorframes D201 Replace existing wall heater with new spec Beatl-board wainscot to remain Remove base molding, Typ. Prep for Tile Base EO� E� �Nr uN v�i J _ inN ry 0 L EN U N Qm J to of Q U UU } U ."".c IL U 0 3 Y O a 5 U Carmel (Zionsville), IN 10325 N. Michigan RD. Carmel, IN 46032 Owner: Chuys OPCO 1623 Toomy Road Austin, TX. 78704 Ph: (512) 473-2783 Contact: Michael Hatcher Architect: Parkway C&A, LP 1000 Civic Circle Lewisville, TX. 75067 Ph: (469) 322-3714 Project Contact: Bill Pounds, AIA MEP Engineer: Diaelectic Engineering 310 W. 20th Street Suite 200 Kansas City, MO 64108 Ph: (816) 997-9627 Contact: Joe Hillebrenner, P.E. Structural Enalneer: Armstrong -Douglas 6060 N. Central Expressway Suite 800 Dallas, TX 76206 Ph" 214 237-7022 Contact: Scoff Armstrong, P.E. Landscape Architect: Belle Firma, Inc. 4245 North Central Expy. Suite 501 Dallas, Texas 75205 Ph: (214) 865-7192 Contact: Kon Haug, ASLA, CLARB Architect: Greg Klimko \ I Remove wall WIMIPDXII covering/decoration and Removewall 2 prep for painting, Typ. A Permit 10.23.18 covering andNo. Description Date prep for painting,TYP Author Checker 04-97221 I Ono. _ -Q Demolition Floor Plan DATE: 11.5/Lo/ -1 U D101