Loading...
HomeMy WebLinkAbout19010114 Building PlansVending Breelam.E1.1050 180 SF 1087 SF UFESAFELY PLAN CODE - OCCUPANCY CLASSIFICATSON S LOADS, PER SPACE I RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Calmel DATE: 02/13/19 A E1-1052 iF B E1-1000 F A N DFESAIETYLEGEND a ~� C 7 »mow- CARSON DESIGN ASSOCIATES E 0 0 P O 0 O O 0 W T) W G N 0 0 : '- eaco n N U ° r i W $ SIAMP: P I4YE:0 DRAwINOFmR Cmelmmm°n°n SIEEw an INUMFEe A011__� tl70P OF WALL CONDITION DFfAILS RELEASED FOR CONS' Subject to compliance with all of State and Local Codes City of Camel DATE: 02/13/19 )N FLOOR PLAN SCHEDULE - WAIL TYPES mal N GENERAL NOTES - CONSTRUCTION `S CARSON .,_.. _ DESIGN ASSOCIATES PLAN LEGEND y ®^� y 2 O O q.% C a ® wp C all C o _ ...m.. N Ins In �; CL W V STAMP: 2 Q LEYED NOTES- COHSTRUCIN)N mul nk DEAwNG me Condmaon Mom Plan WE NEETNLLMBER: w 11P A211®®m SCHEDULE - LIGHT FIXNRES IS] RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Calmed 1," DATE: 02/13/19 EILING PLAN N 1. GENERN NOTES - REFLECTED CEILING IS] RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Calmed 1," DATE: 02/13/19 EILING PLAN N 1. GENERN NOTES - REFLECTED CEILING uLEGEND- RERECIED CEILING M.M1 R � wums.rmva n.e. a.a..°mwn wi4riva,r to h axamxn®mu x'�° .wiwn .rmrMwl ® t,mx °u°.x a «wn.xv..oware. w. KEYED NOTES - REFLECTED CEILING C7 CARSON DESIGN ASSOCIATES C7 CARSON DESIGN ASSOCIATES o pO V $ O > o .12 U 00 O V W o o mN c m C o o Ed`o_.=_ e O �' 0 a :20 Is) z O € K 9 SAM 6MP: NYE:O DUWINC TRUB ReneoixlCahq Noe ME @ B'♦ SHEEENUMBER: A221� RELEASED FOR CONS' Subject to compibnce with all regulations of State and local Codes City of Coa l DATE: 02/13/19 OCATION & EOUIPMENi PLAN u�a���RRa o���I�r7Y N b. GENERAL NOTES - ELFCiI OLL C7 ;` ;' „„„ CARSON DESIGN e,m ASSOCIATES MECH, ELEC, B PLUMBING DESIGN PEp. Piw..w..e «muuv E 0 o ime.m..�....�.a OO .t .12 U OC bb,,bbbab My 0V 1111 O e ..,.a...�.�...a .�.e..e... w... wM. I.,..�sy., CO C C O a g °oaci U CO c _ ,0r�a.imw..m> '..rc. 01 'ten ELECRICAL LEGENyyynnffy D N .. a YI DI x he> W U p S ... .... a. SUMP: T a » R atr. i..ua. rwe NUE:O ® .... .. ■ m m.v�i.^u^^. "^� O KEYED NOTES ELECTRICAL El Ey 14 DRAwINGTmR call lccalbn6 Ell Plan DKE w an mnNW Ec A231®�� SCHEDULE. FINISH LEGEND 122 115 A. AAA Al ,111, AA Al A, Ill, W119 How Finish Key RELEASED FOR CONS' Suhject to compliance with all. ..a.._.._.. of State and Local Codes City of Carmel DATE: 02/13/19 FINISH NOTES SCHFDUIF - FINISH FLAN ABBRFVIRTIONB RA All AAA 11 AAlAA AA O wnurcn Ff" O KEYED NOTES -FINISHES III %AAbAAAI C7 CARSON DESIGN ASSOCIATES O E .o0 c n O O > O a O U c o W V W o Kp c oe C o y c_ 8 O D N 0 V oac CL % n CLA $ i W D"Wim.mm Finish HOn OOn nOres Wif N R'F SMETNUAI A241®�� RELEASED FOR CONS' Subject to compliance with all regulations of State and Local Codes City of Committal DATE: 02/13/19 NN N C7 CARSON DESIGN ASSOCIATES G C O t O C V C N TJ N? m C K C O C 0 0 0 N N a U i W STAMPWN EUE:O h RAMINOTnk wronUre Pmo FOR REFERENCE ONLY ME NERNUMBER: @ e1♦ A251 gas d� ya _ 1+- o 1� ,ram �o DOOR HARDWARE LEGEND GENERAL NOTES-DOOR&HARDWARE nei 2J6 TYP. DOORJAMB DFAHDETML ...... m p RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City at Camel DATE: UZ/ l 3/ l y SCHEDULE - DOOR TYPES SCHEDULE - HARDWARE TYPES SCHEDULE - HARDWARE TYPES ■1 ��Ilil�l���ii�� n� CCARSON DESIGN ASSOCIATES O p c a ' o o>e 3 o U c u W TJ N c T`n c rc u V � c 8 0 y C ,Dc_ O 7 m LL V Oa co Z � U 8 m i Lxy DuwWe.DLE A rSchixi,e 0071 O erg SHEETNUMBER: A601� RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 02/13/19 Restroom, Breakroom, Vestibule and Corridor a_SIGN Expansion/Renovation Building E - Corridor and Vestibule Renovation 560North College DnVe. Ccrmel. IN 46032 Enlarged Breakroom Restroom, Breakroom, Vestibule C3 CARBON DESIGN and Corridor Expansion/Renovation ASSOCIATES on/Renovation CNO Financial Group 01,1 1,19 560 North Colleqe Drive, Carmel, IN 46032 11840930 Architecture / Design Contact Carson Design Associates 9229 Delegates Row Suzanne Ellis Suite 250 Phone: 317.843.3765 Indianapolis, IN 46240 sellis@carsondesign.com RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 02/13/19 Property Manager / Bldg. Owner CNO Jeff Groth 560 North College Drive Phone: 317-817-2780 Carmel, IN 46032 7 Jeff.Groth@CNOinc.com I. Refer to attached M, E, & P drawings for more information. If drawings are not included and scope requires M. P, a E work Contractor shall provide design build - design and permitting services fa the scope required for a successful project. 2. The design and installation of all MEP systems shall comply with the cunenf Codes in force by the AHJ at the project location. Any required energy compliance or environmental reports req cited by the AHJ shall be prepared by the Cc infractor if not provided by the Owner a Arc hifeoPs consultants. 3. Contractor to field verify all existing building conditions and systems affected by the project work and be famiiar with the drawings and project requirements prior to bid or contracting with Owner. No structural cuffing, coring, or drilling shall be performed that impacts any part of the existing facility, without prior approval. Contractor shall retain the services of a structural engineer, if required bythe Architect, Owner, or AHJ to obtain a required approval. 4. Architectural drawing have been provided to show the locations of all devices and systems. Contractor shall be responsible for reconfigurations, modifications, and/or new work needed to provide a complete functioningjob without permanently disrupting existing building systems. Contractor shall coordinate with Owner, Building Facilities, and or other Tenants 48 hours minimum in advance of any interruption of any building service. 5. Architectural drawings shall fake precedence over all other trades drawings when conflicts arise. Contractor to bring conflicts or inconsistencies between the architectural drawings and the drawing of other trades to the attention of the architect prior to bid, order, or Installation. 6. Fire sprinkler modifications and new work shall be designed by a licensed fire sprinkler system designer in the state the project resides in, and must be installed by a state licensed installer. Contractor shall obtain any required approvals from the AHJ prior to start of construction. 7. Zoning of MEP systems shall be exclusive to the project area without cross over to other building areas, except as is indicated on the documents or as approved in advance. 8. Contractor to provide all required test and balance reports, O&M manuals, and commissioning activities required by the AHJ or project requirements in the appropriate phases of the project, 9. Existing had duct to remain as is. No new ductwork required. Re -work flexible duct to new diffuser locations. Note: E.C. and/or design build contractor is to verify that project meets Indiana ASHRAE 90.1 energy codes. Design intent is to be within watts per square foot. Provide energy managment controls, such as sensor controls (ultrasonic and motion defection) and/or relay time clocks, as required by the code. I hall required energy compliance report IComCheckl is the responsibility of the owner or owner's representative. Drawings, specifications and energy control devices are shown with the intent of meeting cunenf state energy codes. Submitting party is to alert designer and owner of any additional devices or load changes necessary to adhere to the code prior to submission of ComCheck. Current Sheet Revision Number Sheet Name A000 Cover Sheet A001 General Information and Standard Details A002 20091CC/ANSI AT 17.1 A003 20091CC/ANSI A117.1 Plumbing & Built -In Elements A011 Code information A021 Project Standards A201 Demolifion Plan A202 Demolition RCP Plan A211 Construction floor Plan A221 Reflected Ceiling Plan A231 Electrical Location & Equipment Plan A241 Finish Plan and Notes A251 Furniture Plan A270 Enlarged Roar Plans A501 Interior Elevations A551 Interior Sections and Details A600 Door Notes, Elevations, and Details A601 Door Schedule This project consists of the demolition and finish out of an existing demised tenant suite. Suite occupancy classification and use group remains unchanged by the scope of this work. Refer to Engineering Drawings for detailed description of MEP scope. Minor mechanical and ductwork relocations to accommodate new partition layout. Electrical circuits to accommodate new tenant equipment loads and locations. Key Plan Area of Work N N PLAN TRUE Area Map 1 - � — Project Location J7' N C7 CARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317.843.5975 SOUTHWEST 12301 Research Blvd Bldg IV - Suite 130 Austin, T% 78759 Tel 512.977.0520 Fax 512.977.0384 wwwoorsondesign.com L O L E O C p will Q d i ? a V 00 a m C U Ego=a O wvf C O L omm,C Q Z U t z H rn i W STAMP: 01.11.19 ISSUE: Review Set 01.11.19 DRAWING TITLE: Cover Sheet JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A000 cooRicM mn urzwr+DESIGN RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes e City of Camel (� �1VTl�ilmnrJAa�+L DATE: \ 02/13/19 SCHEDULE - LIGHT FIXTURES Type Mark Court Manufacturer Model Lamp Information Apparent Load Commends Lamp puanlfy Lamp Lamp Wattage A2n 4 Uthonia ESBP-232-MVOLT-BILP-LB35HTML L835HTB 64 VA An 16 Lithonio ESBP-232-MVOLT-BILP-L835HTS L835HTS 64 VA Bn 2 Fri S5WM$'-2TB-SC- SPEC -277fE TB 124 VA Cn 3 TBD TBD 1 T4 50 VA Barth to submitt options to CDA far review. Dn 5 Colham EV0635/206AR WD US MVOLT EZI NPS80EZ I LED 23 VA Grand total: 30 1 REFLECTED CEILING PLAN PLAN GENERAL NOTES - REFLECTED CEILING A. REFER TO GENERAL NOTES AND REFERENCE SPECI FICATONS ON SHEET ABUT &A021 FOR SPECIFICATIONS REGARDING NEW CONSTRUC110N AND FINISHES, B. Refer to Construction Floor Plan Sheet A211 for typical wall types (walls to deck, rated walls, etc.( and additional wall -to -ceiling design conditions and considerations. C. Refer to Finish Plan and Finish Notes on Sheet A241 for specific ceiling types and materials. D. The architectural reflected ceiling plan shall govern the layout of all ceiling elements and/orpenetrations. If applicable, coordinate any field verified or as -built conditions Mat differ from what is shown on these plans with the Architect. E. Saes of mechanical equipment (if shown) are for reference only. If applicable, coordinate actual saes with the Mechanical Engineer. F. SRes and Shapes of lighting and othermiscelloneau5 electrical equipment (if shown) are for reference only. If applicable, coordinate actual saes with the Electrical Engineer. G. Install suspended ceiling grid with equal size panels at each side or end of the individual spaces unless otherwise indicated. No panel shall be less than 4" wide. H. All ceiling mounted items birrinder heads, mounting mechanisms, etc.) shall be centered In the Celing panels unless chemise Indicated. J. Where existing ceiling gird is remodeled to meet new construction, the contractor shall: A. Replace all damaged a unLrepairoble portions of the existing grid with new grid to match the existing building standards. B. Remove portions of the existing grid or provide new grid as required by new construction. At new grid must match existing grid M remain or match the existing building standards. K. Provide night light circuits as required by Me Building Code. L. Contractor shall verify all existing ceiling heights. MECH, ELEC, & PLUMBING DESIGN REQ. I. Refer to attached M, E, & P drawings for more information. If drawings are not included and scope requires M, P, or E work Contractor shall provide design build design and permitting services for the scope required for a successful project. 2. Th e of esign a no insto l to he n of a l l M EP systems she l l comp) y with the current Codes. in force by the AHJ of the project location. Any rate uired energy cc me lira nce or environmental reports required by the AHJ shall be prepared by the Contractor if not provided by the Owner or Architect's consul to nits . 3. Cc nfra cox to field verify all existing buil ding cond ifio ns and systems affected by the project work and be famiior with the drawings and project requirements prior to bid or contracting with Owner. No structural cutting, coring, or drilling shall be performed that impacts any part of the existing fa cil ity, without prior a p prove 1. Contractor shall retain the services of a structural engineer, if required by the Architect, Owner, or AHJ to obtain a required approval. 4. Architectural drawing have been provided to show the locations of all devices and systems. Contra ctor shot l be responsible for race nfigurafions, modifications, and/or new work needed to provide a complete functioning job without permanently disrupting existing building systems. Contractor shall coordinate with Owner, Building Facilities, and or other Tend n Is 48 hours minimum in advance of any inferu pfion of any building service. 5. Architectural drawings shall fake precedence over all other trades drawings when conflicts arise. Contractor to bring conflicts or inconsistencies between the architectural drawings and the drawing of other trades to the attention of the architect prior to bid, order, or installation. 6. Fire sprinkler modifications and new work shall be designed by a licensed fire sprinkler system designer in the state the project resides in, and must be installed by a state licensed installer. Contractor shall obtain any required approvals from the AHJ prior to start of construction. 7. Zoning of MEP systems shall be exclusive to the project area without cross over to other building areas, except as is indicated on the documents cards approved in advance. B. Contractor to provide all required test and balance reports, O&M manuals, and Commissioning activities required by the AHJ or project requirements in the appropriate phases of the project. 9. Existing hard duct to remain as is. No new ductwork required. Re -work flexible duct to new diffuser locations. Note: E.C. and/or design build contractor is to verify that project meets Indiana ASHRAE 90.1 energy codes. Design intent is to be within watts per square foot. Provide energy monagmenf controls, such as sensor controls (ultrasonic and motion defection) and/or relay time clocks, as required by the code. Indiana required energy compliance report (ComCheck) is the responsibility of the owner or owner's representative. Drawings, specifications and energy control devices are shown with the intent of meeting current state energy codes. Submitting party is to alert designer and owner of any additional devices a load changes necessary to adhere to the code prior to submission of ComCheck. LEGEND - REFLECTED CEILING Fixture Type- refer to schedule Wall mounted light switch. AS Refer to Project Standards Refer p Building Standard 2x4 on sheet A001 for color fluorescent light fixture and style requirements. note: 3-Way switch e-Existing to remain d-Demolish/Remove 3 Dimmerswitch r-Relocated n-New D Occupancy Sensor Building Standard 2x2 OS ❑ fluorescent light fixture. See typical 2x4 notes above. Diffuser -Supply (existing unless otherwise noted) Building Standard fixture night light /emergency circuit Diffuser- Return (existing (Refer to Fixture Schedule) Z unless otherwise noted) a Recessed Downlighf Fixture Recessed Wallwash Downlighf Combination light/exhaust M Fixture El fan Building Standard illuminated exit light. Solid area denotes direction of face plate. Existing ceiling grid to remain. - Indicates new ceiling grid to be installed. Indicates new gypsum board Recessed Linear Diffuser Emergency light fxture with l emergency exit lighting pack and battery back up. © Wireless Access Point(WAP) OSpeaker ❑'�Miscellaneous Specialty Item and/or Equipment - referto Miscellaneous Specialties and Equipment Schedule on bulkhead to be installed. Finish Tog - refer to Finish Legend on sheet A204 Note: Al items shown will be existing to Indicates area not in remain unless noted otherwise. contract. Refer to floor plans for additional information. KEYED NOTES - REFLECTED CEILING R1 Existing suspended ceiling grid to remain. Install new ceiling files and new Building Standard lighting fixtures. Relocate existing diffusers as required. R2 Existing ceiling grid, ties and lighting to remain. Relocate switch as required. R3 NOT USED. R4 Install cove lighting. IRS Install linear wall mounted fixture. R6 New suspended ceiling rid and tiles to match existing. R7 Existing ceiling mounted emergency lighting. RS Reinstall salvaged exit sign. .3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317.843.5975 SOUTHWEST 12301 Research Blvd Bldg IV- Suite 130 Austin, TX 78759 Tel 512.977.0520 Fax 512.977.0384 ursondesigo.com � " C E�w0 CD 0 .i Q T 0 i 0 Z Mix 0 E J TVA m C U > C3 6 ` EA 0 ° N 0 _W wN U.o /� ImenO E4=W of millZ U : Z Tn to Q L0 i W STAMP: `xxppsyAn i � NA ('o7j1% O'k��GISTE fp�9 X 9 v F 'O / DIA O �A7iiigRri11-1 11 n oTxxxxx` 01.11.19 ISSUE: A Review Set 01.11.19 DRAWING TITLE: Reflected Ceiling Plan JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A221 N CARSON DESIGN ASKaATES RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City d Camel ((�� �vm�llanrkla�+L DATE: \\ 02/13/19 1 ELECTRICAL LOCATION & EQUIPMENT PLAN 1/6-1-0 MISC. SPECIALTIES & EQUIPMENT Mark Item Make Model Comments count El Microwave OwnerProvided 7 E2 Undercounter Refrigerator OwnerProvided I E3 Ice Maker OwnerProvided I E4 Refrigerator OwnerProvided I ES Vending- Food OwnerProvided I E6 Vending- Soda OwnerProvided I EZ TV OwnerProvided 2 E8 Ice Maker OwnerProvided 1 E9 Coffee Maker OwnerProvided 2 A PLAN GENERAL NOTES - ELECTRICAL A. REFERTO GENERALNOTES AND REFERENCE SPECIFICATIONS ON SHEETA001 & A021 FOR SPECIFICATIONS REGARDING NE W CONSTRUCTION AND ELECTRICAL/LIGHTING. B. See detail 4/A001 fa typical installation alignmentrequirementsfor electrical devices. C. Refer to Construction Roor Plans(A21 Series Sheets) foradditional Miscellaneous Specialties & Equipment items that may not be indicated on this sheet. D. All dimensions arefromfinished wall surfacearcolumn centedinetocentedineof oulletsor centetline of pars of outlets. E All wall mounted wing devices and receptacles shown back-to-back shall be offset a minimum of 8" and acoustically sealed. F Where direct connection to prewired furniture panels occurs, provide power and telecommunication feeds to indicated panel locations from wall, column or floor source directly adjacent to this location, G. All existing wall mounted elect ical/telecomm unications are to remain unless otherwise noted. All existing floor mounted elecincol/telecommunication locations which are not reused are to be removed. Remove all associated cable, wire and conduit back to the source, Property patch and repair affected wall, floor and/or ceiling construction, H. Unless otherwise noted, all device elevations refer to centetline. J. Refer to Reflected Ceiling Plans(A22 Series Sheets) for locations of light switches. K. All outlets that are in the vicinity of any wet areas)kitchens, break rooms, restrooms, janBaial rooms with floor sinks, laundry rooms, stand alone wall mounted sinks, electrical water fountains, etc.) ground fault circuit interrupt (G.EC.I.) type. See 9ecincal Legend. L Furniture will be provided by tenant and is shown for reference any. M. If 50%or more of the total number of light fixtures or luminaires are replaced, provide lighting and occupancy controls per 2015 IECC. N. Provide emergency lighting as required by code. MECH, ELEC, & PLUMBING DESIGN REQ. I. Refer to attached M, E, & P drawings for more information. If drawings are not included and scope requires M, P, or Ework Contractor shall provide design build - design and permitting services for the scope required for a successful project. 2. The design and installation of all MEP systems shall comply with the current Codes in force by the AHJ at the project location. Any required energy compliance or environmental reports required by the AHJ shall be prepared by the Contractor if not provided by the Owner or Architect's consultants. 3. Contractor to field verify all existing building conditions and systems affected by the project work and be familiar with the drawings and project requirements prior to bid or contracting with Owner. No structural cuffing, coring, or drilling shall be performed that impacts any part of the existing facility, without prior approval. Contractor shall retain the services of a structural engineer, if required by the Architect, Owner, orAHJ to obtain arequked approval. 4. Architectural drawing have been provided to show the locations of all devices and systems. Contractor shot be responsible for reconfigurations, modifications, and/or new work needed to provide a complete functioning job without permanently disrupting existing building systems. Contractor shall coordinate with Owner, Buiding Facilities, and or other Tenants 48 hours minimum in advance of any interruption of any building service. 5. Architectural drawings shall take precedence overall other trades drawings when conflicts arise. Contractor to bring conflicts or inconsistencies between the architectural drawings and the drawing of other trades to the attention of the architect prior to bid, order, or installation. 6. Fire sprinkler modifications and new work shall be designed by a licensed fire sprinkler system designer in the state the project resides in, and must be installed by a state licensed installer. Contractor shall obtain anyrequired approvals from the AHJ prior to start of construction. 7. Zoning of MEP systems shall be exclusive to the project area without cross over to other buiding areas, except as is indicated on the documents or as approved in advance. 8. Contractor to provide all required test and balance reports, O&M manuals, and commissioning activities required by the AHJ or project requirements in the appropriate phases of the project. 9. Existing hand duct to remain as is. No new ductwork required. Re -work flexible duct to new diffuser locations. Note: E.C. and/or design b,GiodCAeiiF. is Tovrp,cnm eets Indiana ASHRAE _. 90.1 energy codes. Design intent is to be within wafts per square foot. Provide energy managment controls, such as sensor controls (ultrasonic and motion defection) and/or relay time clocks, as required by the torte. Indiana required energy compliance report (Com Check) is the responsibility of the owner or owners representative. Drawings, specifications and energy control devices are shown with the intent of meeting current state energy codes. Submitting party is to alert designer and owner of any additional devices orlood changes necessary to adhere to the code prior to submission of ComCheck, y� Wall mounted dedicated duplex on outlet dedicated circuit at standardheight. wall mounted duplex grou no fault circuit interrupt outlet of B standard height. Wall mounted telephone outlet. T42. Special mounting height indication forwall outlets. Taken to centetline. N, E, R Indicates new, existing or relocated ® conduit an -GCto provide box, item. conduit powerasty vendo Coordina}e with security vendor. ADA Pushbutton dIndicates area not in 11 Miscellaneous Specialty Item contract. Refer to floor and/or Equipment-referto plans for additional Miscellaneous Specialties and information. Equipment Schedule KEYED NOTES - ELECTRICAL El Install power and USB, E2 Power forrelocated equipment to match prior power requirements. E3 Install power fa tenant supplied garbage disposal. E4 Reinstall equipment removed during demolition (fire alarm box mailbox Knox box, phone and cardreader). Coordinate with ownerforownerto ensue consistent monitonng at all times. ES Install temporary power along wall fortenanf Drink Machine. Vending, Refrigerators and Freezer, fa use during construction phase, Coordinate with Owner. E6 Size and location of tenant TVs to be confirmed by owner. E7 GFCI outlets installed under countertop forsoop dispensers. Coordinate heights with Electrical Contractor, 3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317,843,5975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Tel 512.977.0520 Fax 512.977.0384 -orsondesign.com � " C CD 0 .i •O Q v 0 >r 0 Z O O E V - /� � W T A O /�W � m C .� U > hiz E _N _0 0 Z Lieyj Vf U -C Z Vf Q N N X W LO STAMP: pNO OkCH 11rb/ii �('° Zxxpi ��,O�Q,Q,GISTE fp�P�g' 9 v F —' DIA O 1Hill 01.11.19 ISSUE: Review Set 01.11.19 DRAWING TITLE: Electrical Location & Equipment Plan JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A231 cwrwiaw20rs cvaa+ DaINASSOanra RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and local Codes e City of Camel (� �1VTl�ilmnrJAp�1+L DATE: \ 02/13/19 1 FINISH PLAN 1/8..-1._B. SCHEDULE - FINISH LEGEND Mark Description Marrolacturer Paflem Model Comments CM1 Porcelain Floor To 113/4"x23 5/8 Atlas Concord Fray Gray CM2 Porcelain Wall Tile 123/8"x221/2' Atlas Concord Fray White CM3 Porcelain Mosaic Wall Tile 11 314" x II 314' Atlas Concord Fray Cold Tatami CM4 Porcelain Wall Tile Accent 12 x24 Crossville Simpatico Puel Fellowship Gloss See Elevations on Sheet A501 for details CPl Carpet Tile 18 x 36 Shaw Hand Drawn- Lineweigh15T114 Graphite 13510 Install with WBI in Mother's Room CPS Walk -Off Carpet Tile Install from Tenant Attic Stock, Install with WBI PLl Plastic Laminate Wilsonart Pewter Mesh 4878-38 Fine Velvet Texture Finish Standard vertical laminate surfaces in Mother's Room PI-2 Plastic Laminate Wilsonart Mushroom 519 Lena Weave Finish Standard vertical laminate surfaces in Breakroom PTI Paint Sherwin Williams Eggshell Repose Gray SW7015 P12 Point Sherwin Williams Eggshell Ac1erSW9I70 PI3 Paint Sherwin Williams Eggshell Gauntlet Gray SW7019 RH Luxury Vinyl He 6" x49' Shaw Solitude 0648V Smoke 48506 Install with WB2 in Breakroom RF2 Luxury Vinyl Tile 9"X36" Shaw Shift 0709V Since 09505 Install with WB2 in Breakroom SS1 Solid Surface Corian Tore Collection Deep Smokey Pearl SS2 Solid Surface OrionC Tema Contact on Dove WBI Rubber Base Johnsonite Gey 48 Mothers Room WB2 Rubber Base Johnsonite Silva Grey 55 Cl Wall Protection Korogard Texture: PI Helmet, ihickness:.040 Mist Janitors and Breakroom Floor Finish Key zCM1 CPl CP2 ® RF1 RF2 A PUN FINISH NOTES 1. General A. REFER TO GENERAL NOTES AND REFERENCES PECIFICAIFIONS ON AO SERIES SHEETS FOR SPECIFICATONS REGARDING NEW CONSTRUCT ON AND FINISHES. B. Dimensions are taken from the face of masonry walls, column centerlines, finish face of existing walls and/or stud face of new walls unless otherwise indicated. C. Verify all critics l dimensions within and/or related to the eksitng build ing dimensions and conditions indicated by visual survey and/or information from eksfing drawings. D. Field verify all dimensions indicated as either+/- or V.I.F. (Verify in field). E. Refer to Finish Legend and finish plan for a l l required finish information. F. Plans are not shot l be scaled for finish information or dimensions. Contact the Architect/Designer for clarification of finish information or dimensions. G. Provide finish materials with flame spread and smoke developed ratings per code required limits, based on ASTM E-84 Test Method 2. Painting/Staining A Refer to Door Schedule and Details Sheet for Door information. B Paint begins from wall edges and corners, unless otherwise noted. 3. Flooring A If applicable, floors in toilet and bathing rooms shall have a smooth, hard, nonabsorbent surface that extends onto the adjacent wall surfaces at o minimum of 6" above finish floor. B Grout joints on floor file shall be 1/8" width, unless otherwise noted. Grout pints on wall the to be 1/8' width unless otherwise noted. If manufacturers recommended installation indmdions differ from this contractor to notify designer of condition. C Flooring contractor to submit floor seaming diagro m to Architect/Designer for review and approval. 4. Ceilings/Walls A All base shall be provided in rolled goods format. B Contractor should venfy all critical dimensions when determining wall finish requirements. SCHEDULE - FINISH PLAN ABBREVIATIONS Category Key Name Commends on Finish Ceiling CL Acoustical, specialty and wood Ceramic CM Anything requiring a setting bed and grout, ncluding stacked stone Concede CO Stained, stamped, sealed, patterned and polished Carpet CID Includes carpet base Existing To Remain EX Fabric FB Upholstery, and window covering including leather and vinyl Glass GL Back Painted filmed patterned bitted textured and minors Miscellaneous MA Covers items not covered in other categories Metal MT Includes all unpainted metals Not In Contract NIC Plastic Laminate PL Any laminate applied to a substrate including metal, plastic and wood Paint PT Includes paint treatments like Zolotone Resilient Flooring RF VCT, Sheet vinyl, rubber, vinyl wood plank and cork Stucco SC Portland based non-EIFS type applications Solid Surface SS Conan 3 Form, Siesione, Avol Compac Stone ST Includes stone base, wall cladding and countertops Teraso 1Z Poured in place applications Verify In Field VIF Wall Base WB All wall bases including rubber, virryl, and wood - excluding stone and carpet bases Wall Covering WC Vinyl, fabric and speciality Wood WD Real wood in all applications excluding base Finish Legend Key XD Indicates finish to be determined FINISH KEY Indicates Room name PTt Indicates Finish 101 finish material. Arrows Wall OIndicates Keynotes. Floor PTi indicate extent of Wall Base O KEYED NOTES - FINISHES FI Install new corner guards. F2 Flooring to remain as existing. F3 Install WCI wall protection 3'-0" AFF, wrap three walls. F4 Paint intedor and exterior of doors and frames P 1. F5 Walls painted PTI. F6 Wall base to be WB2. F7 Install WCl from base material to underside of countertop. F8 Start with full plank of RFl at transition with RF2. .3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317.843.5975 SOUTHWEST 12301 Research Blvd Bldg IV - Suite 130 Austin, TX 78759 Tel 512.9770520 Fax 512.977.0384 -arsondesign.com L LCN ma C:) Ip •� wO } Q i z O i V O p N 70 N U m C .a U E E Q N O _W wVf U.a O .0 r. Z U z Q ^Vf, W ^V^f,, W X 10 iW rn STAMP: ytyM\CH gt4iii �( ° 2jxpi STE 9 v F —' ,6j 4RuHo n oTxSVXx` 01.11.19 ISSUE: A Review Set 01.11.19 DRAWING TITLE: Finish Plan and Notes JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A241 corrwiaMsors czaon oamr+ AssoaAra RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel ((�� �vm�Ilanrkla�l+L DATE: \\ 02/13/19 1 FURNITURE PLAN N PLAN .3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317.843.5975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Te1512977.0520 Fax 512.977.0384 orsondesign.com L Cq ma co 0 O ._ •O Q i ? O > o U 0 O 0 g �.2) m C U 0 O � rn m O _ 'vf O �eiiiiiiiii, C mi willZ U € Z Vf N Q X o 0 iW to STAMP: `"0699TM\CH ( ut4iii �° 4jxpi STE 9 v F —' 'O DIA O Hi n �95xxxx` 01.11.19 ISSUE: Review Set 01.11.19 DRAWING TITLE: Furniture Plan FOR REFERENCE ONLY JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A251 COPYRIGHT CARSON DESIGN ASSOORei l tnlarged kestroom Flan RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City Df Camel DATE: 02/13/19 PLUMBING FIXTURES Mark Description Manufacturer Model Comments PAl Hand dryer Bobrick Washroom B-270 Satin Finish Mount at ADA height Equipment, Inc. Stainless Steel PA2 Single Hole or 4" Centers, CHICAGO FAUCETS AC-116-706-AB-1 Deck Mount, Electronic Lavatory Faucet with Dual Beam PAS Rectangular undercounter American Standard 0618,000 mount sink PA4 Toilet Partition -ADA ASI Global/Accurate Floor Provide wood blocking in wall Partitions anchored/overhead forinslallation. braced. Color: TBD PAS Toilet Partition Aso Global/Accurate Floor Provide wood blocking in wall Parthons anchored/overhead for Installation. braced. Color: MD PA6 Break Room Sink w/faucet Easy ECC3322 PA7 Urinal Screen ASI Global/Accurate Wall Hung. Color: MD Provide wood blocking in wall Screen for Installation. PAB Coat Hook Bobrick Washroom B-270 Satin Finish Mount at ADA height Equipment, Inc. Stainless Steel PA9 Toilet American Standard A2257.101020/Bemis ADA Compliant Seat B 1055/Delta Flush DBI T201 BTA PA70 Urinal American Standard A6590.001020/Delta Mount at ADA height Flush D81 T231 BTA PAl1 47' Grab Bar MD MD Mount at ADA height PA12 I Er Vertical Grab Bar TBD TBD Mount at ADA height PA13 36"Grab Bar TBD TBD Mount at ADA height PA14 Sanitary Napkin Disposal Bobrick Washroom B-270 Satin Finish Equipment, Inc. Stainless Steel PA15 Double -Roll Toiet issue Bobrick Washroom B-221 Mount at ADA height Dispenser Equipment, Inc. PA16 Soap Dispenser Gojo CXac Touchless Soap Owner Provided Dispenser PA17 Bobrick B-370625 Classic Bobrick Washroom B-370625 Mount at ADA height Series Adjustable Depth 25 Equipment, Inc. Cent NaplAn-Tampon Vendor PAIR Bobrick B-221 Classic Series Bobrick Was moom B-221 Mount at ADA height Surface Mounted Seal Cover Equipment, Inc. Dispenser 17C11CrCML IVV 1 CJ - 1 VILC 1 RVVIVI A. Refer to Tollet Room Fixture and Accessory Legend, this sheet for accessory requirements. Install Toilet Room Fixtures and Accessories within reach ranges and mounting heights listed on ADA details at Sheets A002 and A003, B. All plumbing fixtures indicated as accessible, TAS-compliantand/or ADA compliant shall comply with all applicable A.D.A, and Building Code requirements. Refer to ADA details at Sheets A002 and A003. C. Flush controls shall be hand operated or automatic. Controls for flush valves shall be mounted on the approach (wide) side of toilet a reas no more tha n 44"above the floor. N ote mounting heights for gra b bars and local code requirements, If conflict exIsts between controls position requirement with local junsdiction and grab bar, reference Exceptions listed at ADA requirements 604.5.2. .3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317,843,5979 Fax 317,843,5975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Tel 512,977.0520 Fax 512.977.0384 - arsondesign.com CN ma 0 O •� •O ii O O O U (D E - C) E C � � O _v _o wvf U. J O C Z -C 04MM will U Z Vf N Q X o 0 iW Lr) STAMP: `"OTy1TM\CH ut4iii �( ° pxii STE 9 v F —' xAx 4RuHu n oT5555x` 01.11.19 ISSUE: /L Review Set 01.11.19 DRAWING TITLE: Enlarged Floor Plans JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A270 CorrwlaM2015 Csko +Dawn+AssoaATa 7 5 1 New power with USB ports =L 19'-27/8" 5 Breakroom 1/2•-1,q CM4 3 I 1 I I 1 I l 5 I 2'-41/2' I I 1 I I l I o I Ice Maker I I I l I I I I I I I l l l it l I l 2' RELEASED FOR CONSTRUCTIM Subject to compliance with all regulations me Station of State and local Codes e City of Camel (� �1VTGsi mnrJAp�+L DATE: \ 02/13/19 2' - Staid with a full file of ceiling — Owner provided Keurig K-Cup dispenser — Owner provided Keurig coffee maker — SS2 countertop — PL2 casework WBI :lass, frame, and xferior wall to remain existing TI 52 countertop with back clash, install power and so of countertop height /CI M2 PM SSI Install u Owner Sfandal Supplied white, 2 4 3 Min« Install C 55 55 Electra 116.706 Install o CXac w er Instal u DR .ed wave for soaT -a specific FL' — existing owner app icc Sco Unaerc ter PLI FengerLi Pi I III,®1 ME ME a 2 Mother's Room Elevatio 1/2 = 1 J =stop with 4'H side splash. mount American loin rectangular sink, CAT. NO - 0618.000. go Faucet C Faucets fouchless faucets. provided Gojo ess soap dispenser. -counter electrical lensers. Confirm 1 with owner. Utilize GENERAL NOTES - MILLWORK A. All cabinetpull hardware shall be Doug Mockeff #DP105A/2 in Safin Nickel 17S finish, unless noted oherwise. B. All cabinet typical drawer glides shall be Accuride#3832EC, unless noted otherwise. C. Unless otherwise noted on this drawing, refer to Finish Plan and Notes Sheet for all finish selections. D. Unless otherwise noted on this drawing, refer to Finish Plan and Notes Sheet for all cabinet types, manufacturers and hardware selections. E. Where cabinets meet, do not provide full depth end panel, to allow far installation of task light. F. Where filler ships are required between cabinets,casework, etc. and adjacent walls, provide matching, equal size ships at each end by cabinet contractor. G. Unless otherwise noted on this drawing, all countertops must be continuous. All countertops without backsplashes must be scribed to the wall as noted on sections and details. H. Plastic laminate mlllwork, typical. Provide plastic laminate on all exposed surfaces. Inferiors to be White melamine. 1. Provide self edge along exposed edges (front and sides of countertop). J. Control be responsible for me field verification of all dimensions, rough openings and job conditions prior to beginning fabrication of any work shown or noted on this drawing. Contractor must coordinate with Architect any discrepancies between what is shown or noted on this drawing and actual field vetlfication conditions. K. Provide wood blocking as required. L. Unless otherwise noted, sinks (where indicated) will be centered within the wall of the base cabinet. See plans and/or elevations for cabinet widths. M. Where garbage disposals are indicated. provide a wall mounted switch as near as possible job from centerline of sink with bottom of switch plate min. of 2" above fop of backsplash. 4 Kitchenette 1/2•-1,q 1 55 � M o 1 Men's / Women's Sinks 1/22'= l-cf Start with a ful l file of the ceiling Microwave cabinets, typ ADA Sink and PL2 casework typ. garbage disposal below SS2 countertop PL2 casework WB2 Building standard (near light fixture nsfall CM3 from countertop to ceiling Install owner provided minor with wood frames equally spaced over sink area Hand dryer Install SSI countertop and undermounf American Standard Studio rectangular sink, white, 22'W, CAT. NO - 0618.000. Install Chicago Faucet Electronic -AC Faucets 116.706.AB.1 touchless faucets, Install ownerprovided Gain CXac fouchless soap dispensers. Confirm specification with owner. Utilize existing plumbing locations when applicable. Install under-cou Fier el ectrica l for soap dispensers SSI Apron. Wrap exposed pipes as required by ADA Install CM2 undersink. Align with grout lines in floor, No base .3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317.843.5975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Tel 512.9770520 Fax 512.977.0384 :-arsondesign.com L CA ma C) O ._ wO Q V O i p z O O E U � � � _ a N N U 00 C .0 U E ^, O 0 O D O _W " J 0 =Q O U 2i Vf N Q iW to STAMP: `"OvytyM\CH ( ut4ip �° Axxpi STE 9 v F —' 'O / IA Hill O �xxiiigRfiHi n wvvvvv` 01.11.19 ISSUE: Review Set 01.11.19 DRAWING TITLE: Interior Elevations JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A501 COPYRIGM 2015 CFRSON DESIGN AKOCATei GENERAL NOTES - MILLWORK face wall. Countertop. A. All cabinet pull hardware shall be Doug Mockeff #DPIOSA/2 in Satin Nickel 17S finish, unless noted otherwise, B. All cabinet typical drawer glides shall be Accuride#3832EC, unless noted otherwise. C. Unless otherwise noted on this drawing, refer to Finish Plan and Notes Sheet for all finish selections. D. Unless otherwise noted on this drawing, refer to Finish Plan and Notes Sheet for all cabinet types, manufacturers and hardware selections. E. Where cabinets meet, do not provide full depth end panel, to allow for installation of task light. F. Where filler strips are required between cabinets, casework, etc. and adjacent walls, provide matching, equal size strips at each end by cabinet contractor. G. Unless otherwise noted on this drawing, all countertops must be continuous, All countertops without loSilashes must be scribed to the wall as noted on sections and details. H. Plastic laminate mill work,typical. Provide pal laminate on all exposed surfaces. Interiors to be white melamine. I. Provide self ed ge a long exposed edges (fro of a Ind sides of countertop). J. Cc nfractor sho ll be responsible for the field verP catio In of at l dimension, roug h openings and job conditions prior to beginning fabrication of any work shown or noted on this drawing. Contractor must coordinate with Architect any discrepancies between what is shown or noted on this drawing and actual field verification conditions. K. Provide wood blocking as required L Unless otherwise noted, sinks (where indicated) will be centered within the width of the base cabinet. See plans and/or elevafions for cabinet widths. M. Where garbage disposals are indicated providea wall mounted switchas Cabral possible to 8" from centerline of sinkwith bottom of switch plate min. of 2" above fop of backsplash. Line of Cabinet Door beyond. ADA Compliant Stainless Steel Sink with Microwaves shown dashed for reference. Gooseneck Faucet and Lever Type Confirm exact dimensions prior to fabrication of Handles. cabinet. NOTE: 2'-10" dimension is to the TOP lip of the sink. If counter mounted _ porcelain or cast iron sink is specified, _ Provide electrical of each microwave, refer to the height of the countertop must be A231 Z2V reduced to account for the dimension of the Him. Fixed Shelves. Provide wood blocking fa i Support of shelves. — = 1 - Provide electrical at each microwave, refer to r9 Line of Wall. 0 A231 1 2-2 aa a g SS2 Countertop with l /2" Rodbs „ t Provide holes for ventilation Bullnose Edge. b m 1 F Min. Provide finished ends on adjacent 9 ca _ I between shelves .� cabinets 4" Backsplash SS2. 5 o - - Provide electrical at each microwave, refer to Wire management cut-out (integral to ` u_ -- --- A231 _ Haefele 271.05.906 Hook Fasteners countertop bracket). r < - LL I Full- Extension Drawer Guides, Typ. (Typical Top and Bottom and of Both .1 Workstation Brackets, spaced at 4'' D' MAX 6 b — Ends of Each Removable Panel) (A & M Hardware, 304 Stainless Steel notes. w Brackets - I/8" Steel, +1,000# Load Limit). Finish to match worourface unless `o — Provide PL2 Baseboard to Match adjacent q otherwise indicated. Cabinets, typ. Scribe to Floor. Height to match -IF—'I` Provide 2x blocking in scheduled wall to adjacent scheduled base, Refer to Finish Plan 3/4" removable PL2 Panels. Panels to 2'-0" and Elevations for Color/Type. support Workstation Brackets. be full width of Knee Space of sink, 7 Wall Mounted Worksurface 6 Cabinet - F.H. Microwave (3) 5 Accessible Sink Section 3/4"=1'-O' 3/4"=1'-O' 3/4"= F-Cr I" I" I" I Finish face of wall �Counterfop as Scheduled. Refer 2-9' to Finish Plans and Elevations for 0 1 0 US 0 0 m RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel Ii �VTl�la,nek,efJaL DATE: \\ 02/13/19 face of wall SSI Countertop as Scheduled with 4" high backsplash where occurs. Rakks surface mount support bracket - space at 4'-0' max. Specified undercounfer refrigerator shown dashed, confirm exact dimensions prior to fabrication of base cabinet. i Provide recessed utility box connections where required and necessary electrical devices at equipment refer to electrical plan nt 2' - 1" i — — — a111 2' 0" 3 Base Cabinet 314' = 1'O' face of wall Countertop as Scheduled with 4" high backsplash where occurs. Refer to Finish Plans and Elevations for Color/Type. Full -extension drawer glides, typ Cabinet Pulls, Refer to Millwork general notes. Adjustable I" P. Lam. Shelf on Knape & Vogt #255 and #256 zinc adjustable shelf standards and brackets. Provide plastic laminate toekick to match adjacent cabinets. Scribe to floor. Height to match adjacent scheduled base. Refer to Finish Plan and Elevations for Color/Type. Color/Type, ADA Compliant Stainless Steel Sink with Gooseneck Faucet and Lever Note: Refer to toilet room /2- Type Handles, fixture and accessory legend NOTE: 2'-10' dimension is to the TOP lip for fixture mounting heights of the sink. If cot mounted and accessory requirements. porcelain or cast iron iron sink is specified, the height of the countertop must be reduced to account for the dimension _ _ of the rim. 4" Backsplash, typ. (where occurs), r2(r Refer to Elevations for locations. See Finish Plan for Color/Type. 8 TI IN. II Provide finished ends on adjacent o 8" cabinets `; _ 1 Hafele 271.05.906 Hook Fasteners n (Typical Top and Bottom and at Both Ends of Each Removable Panel) o n a 11 o It it a1-1 3/4" removable Plastic Laminate Panels. 0 12 5 6^ Panels fo be ful width of Knee Space at sink. r Dashed line represents knee clearance r ry required by TAS. 0 Line of Cabinet Doorbeyond 2 Accessible Sink Section 1 Accessible Lava 3Nr= I'O' 3/4"=I' Wall as scheduled Ref. Floor Plan -Galvanized HSS 2x2x1 /4 countertop support post. Galvanized 2 1/2'k8'56/8" Base Plate with (2) Galvanized 5/8" Expansion Joints 3/4" intermediate support brackets at 3'-0' O.C. MAX. spacing. -Galvanized 2 1/2'M X3/8" Base Plate with (2) Galvanized 5/8" Expansion Joints Galvanized HSS 2x2xl A countertop support post. of HSS Support Beams Above. of Scheduled Countertop Above PLAN DETAIL Finish face of wall Mirror. Bottom of Reflective Surface at 40' MAX. AFF. Top of Reflective Surface at 74" MIN. AFF. Countertop as Scheduled. Refer to Finish Plans and Elevations for Color/Type. ADA Compliant Sink with Faucet . NOTE: 2'-10' dimension is to the TOP rim of the sink. If counter mounted porcelain or cast iron sink is specified, the height of the countertop must be reduced to account far the dimension of the rim. Galvanized HSS 2x3x1 /4 countertop supports, attached to HSS vertical posts at walls at each end of countertop (shown dashed). Ref. plan detail for more information. 3/4" intermediate support brackets at 3'-0' O.0 MAX. spacing. Wrap exposed pipes for ADA compliance. Section - Lona Span .3 riwi ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317.843.5975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Tel 512.977.0520 Fax 512.977.0384 - orsondesignaom L CNI ma o 0 ._ ,OniiiiiiiI will 0 i a z 0 00 E 0 _ a N N a0 C .� U 6 E v 0 N 0 w Vf U.o 0 /�/� if O Ei eiiiiiiiii,L mill U Vf N Q 0Zo iW L0 STAMP: TtTM\CH ut4iii �( ° AAvpi ISTE fp��g' = 9 v F —' ITT 01.11.19 ISSUE: /L Review Set 01.11.19 DRAWING TITLE: Interior Sections and Details JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A551 COPYRIGMIDI5 CARSON DESIGN ASSOCIATES GENERAL NOTES - DOOR & HARDWARE 1 Door sto as to be floor mounted unless otherwise noted in door schedule remarks. Provide blocking inside wall for all wall mounted stops. 2 All new a nd existing doors to receive building sic nd and lever he holies. 3 All existing doors to be repaired for any damaged, scratched or worn areas. 4 NOT USED. 5 Egress doors shall be readily openable from the egress side without the use of a key, special knowledge or effad. I n group A occupancies having an occupant load less than BUD, and group B,M & S occupancies, the main exterior doors) are permitted to be equipped with key operated locking devices or dead bolt from the egress side provided that the locking device is rec bill distinguishable as locked and a readily visible durable sign is posted on the egress side on or adjacent to the door stating THIS door to remain unlocked when building is occupied". The sign shall be 1" high letters on a contrasting background. Refer to 2015 International Building Code Section 1010.1.9.3,2.2(Verify with local building code requirements). 6 Hardware Specifications given communicate performace and design intent. Contractor shall coordinate hardware submittal to comply with all building standard styles, finishes and specifications. Substitutions may be allowed unless noted otherwise. 7 Contractor shall coordinate scope forall security devices, conduit. power and junction boxrequirements with security vendor. 8 All access -controlled egress doors shall comply with IBC 2015 Section 1010.1.9 and .9. Doff hardware supplier shall verify compliance and recommend to Architect any modifications to the door hardware group as required. 9 Handles, pulls, latches, locks, and other operable parts on doors and gates shall comply will 1010.1.9. (TAB 404.2J). Operable pads of such hardware shall be 34 inches minimum and 48 inches maximum above the finish floor or ground. 5/8" G. W.B. 3 5/8" METAL STUDS DOOR (REFER TO DOOR SCHEDULE) ALUMINUM FRAME CONT. WOOD BLOCKING 4 DOOR DETAIL-RACO DOOR JAMB 3"=1� 3 5/8" METAL STUDS Bib"G.W.B. ALUMINUM FRAME CONT. WOOD BLOCKING DOOR (REFER TO DOOR SCHEDULE) 3 DOOR DETAIL-RACO DOOR HEAD 3 = I'-0 DOOR (REFER TO DOOR SCHEDULE) 5/8"G.W.B. 3 50 METAL STUDS HOLLOW METAL FRAME, PAINTED FINISH 2 DOOR DETAIL-HM DOOR JAMB 3'= I•-0 5/8" G. W.B. 3 5/8" METAL STUDS HOLLOW METAL FRAME, PAINTED FINISH DOOR (REFER TO DOOR SCHEDULE) RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel 1 DOOR DETAIL-HM DOOR HEAD DATE: 02/13/19 .3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 31 T843.5975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Tel 512.977.0520 Fax 512.977.0384 orsondesign.com L ON ma 00 d O._ wO MIN= Q O O > U O 0 (D a) a0 C U ai E C O � O wvf a O /� yj Z U r Z Vf N Q X o 0 iW L0 STAMP: `"OyytyM\CH ul4ip R(P7jxii 5TE 0 9 v F —' 'O 7 DIA O HI n �yxxxxx` 01.11.19 ISSUE: /L Review Set 01.11.19 DRAWING TITLE: Door Notes, Elevations, and Details JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A600 coPrwicwsers caaor+ Daan AssoaAra Feature Privacy With "OCCUPIED" Indicator Deadbol1�=�Rvith Stopworks functions by ®I 0 r Lever retracts latchbolt from either turn piece title. Deatlbolt thrown or guarded guarded ® byretracted key retraction by key latch` Latanti- � re iredin he required in the event of anti- uan m emergency or inside — — friction � � throwing deal locks outside locksoutside tongue OCCUPIED lever and displays 'OCCUPIED' Symbol plate. Rotating inside lever simultaneously retracts both ®I Cylinder Solid deadbolt and latchbolt and unlocks spindle outside lever. J i Outside — — Two piece lever spindle Inside F Emergency turn lever piece rTurn immi. Occupancy piece indicator Cylinder 11 Coin turn turn DOOR HARDWARE LEGEND ILDOck Frame Ryp.) O COnstruction- efer toFloorPlan for all Type Frame (Typ.) Construction - 'to Floor Plan for Type Note: Unless otherwise noted or dimensioned on plans, provide 6" of space at hinge side of doorframes. 1 TYP. DOOR JAMB DETAIL I•=1'-0 Flush DOOR TYPE LEGEND nn RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City d Camel DATE: 02/13/19 GENERAL NOTES - DOOR & HARDWARE 1 Dour stops to be floor mounted unless otherwise noted in door schedule remarks. Provideblockinginside wall for all wall mounted stops, 2 All new and Rdsling doors to receive building standard lever handles. 3 All existing doors to be repaired for any damaged, scratched orwom areas. 4 NOTUSED. 5 Egress doors shall be readily openable from the egress side without the use of a key, special knowledge or effort. In group A occupancies having an occupant load less man B00, and group B,M & S occupancies, the main exterior doors) are permitted to be equipped with key operated locking devices or deadbolt from the egress side provided that the locking device is readily distinguishable as locked and a readily visible durable sign is posted on the egress side on or adjacent to the door stating "This door to remain unlocked when building is occupied". The sign shall be 1" high letters on a contras I ng boo kground. Refer to 20151 nternational Building Code Section 1010.1.9.3,2.2 )Verify with local building code requirements). 6 H ardware Specifics bons given communica to performace a ntl design intent, Contractor shall coordina to hardware submittal to comply with all building standard styles, finishes and specifications. Substitutions may be allowed uH ass noted otherwise. 7 Con tractor shall coordinate scope for all security devices, conduit power and N nc ran box requirements with security vendor. 8 All access-conholl ed egress doors shall comply with IBC 2015 Section 1010.1.9 and .9. Door hardware supplier shall verify compliance and recommend to Architect any modifications to the door hardware group as required. 9 Ha holes, pulls, latches, locks, and other operable parts on doors and gates shall comply with 1010.1.9. ITAS SID4.2J). Operable parts of such hardware shall be 34 inches minimum and 48 inches maximum above the finish floor or ground. SCHEDULE - DOOR TYPES Door Fmme Hardware Fame Fire Door Number Description Manufacturer W H T Door Type Door Material Door Finish FrameType Material Frame Finish Rating Use Sett Commends 101 Wood Door in Hollow Metal Frame Building Standard 3'-U' 9'-0" 13/4" Flush Door SCWD Building Single Door HM Building — Privacy Door with Indicator 5A Ne cloorand Rome to bepainted P2 Standard Door Frame Standard Lock Frame 103 Wood Door in Hollow Metal Frame Building Standard 3'-0' 9'-0" 13/4" Flush Door SCWD Building Single Door HM Building -- (lone) Salvaged Door Standard Door Frame Standard Frame 104 Wood Door in Hollow Metal Frame Building Standard 3'-0" 9'-0" 13/4" Flush Door SCWD Building Single Door HM Building — (none) Salvaged Door Standard Door Frame Standard Rome 106 Single Wood Half Light Door Marshfield Door/ 3'-0" 7'-0" 11/2" Half Light Door SCWD Buld'ng Single Door AL Building -- )none) Salvaged Door RACO Rome Standard Door Rome Standard Frame SCHEDULE - HARDWARE TYPES P a o Electronic a o o Perimeter Sett 0 Hinge Type Latch/Lock/Pull Set Bolt Type Access Control p Stop Type a Mutes p Closer Holder Seals Bottom Seal Threshold Kickplate Accessories Finish 003 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317.843.5975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Tel 512.977.0520 Fax 512.977.0384 r. arsondesign.com S� LColl ma co 0 Ow_� eO Q O i p Z O O N N U m C .� U > C3 \ o E C Qiiiiiii, a LL � o O _(D wtn O C O z- i N Z U : Z N Q X o 0 W L0 STAMP: `"OTy1vM\CH ut4iii Si xyxpi TE = 9 v F —' 'O 7 DIA O �A7iiigRsiHi n �SVNVNx` 01.11.19 ISSUE: Review Set 01.11.19 DRAWING TITLE: Door Schedule JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A601 CGPYRIGMDIb CARSON DESIGN ASVJOATES rL New or existing window mullion Black neoprene seal adhered to face of mullion and Sill cap at all exposed surfaces adjacent to aluminum channel. Aluminum brake metal channel w/ edges returned (colorto match window framing system). Edge of sill below. Wall construction (refer to floor plan) center on window mullion Note: Provide tight fit where wall is coped around any window sill construction. Wall offset, if required, shall be located to allow access to building services such as blinds, roller shades, HVAC diffusers or return air etc. Coordinate final dimension in field, no less than 8" between the new partition and the exterior wall. 1 TYPICAL WALL ALIGNMENT AT MULLION NO SCUE Existing construction (wall, column wrap, etc.) to remain (typ.) Existing construction (wall, column wrap, etc.) to remain (hp.) Exkting construction Match new wall type with (wall, column wrap, existing wall construction etc.) to remain (hp.) Align face of any new to remain. construction w/ face of Align face of any new adjacent existing 7unless construction w/ lace of Align face of any new construction to remain adjacent existing construction w/ face of unless otherwise indicated. construction to remain adjacent existing n otherwise indicated. construction to remain interior wall Pro Proposed interior wall unlessotherwiseProposed construction, Refer to floor indicated. construction. Refer to Floor plans for wall type. plansiorwall type. 4 TYPICAL WALL ALIGNMENT DETAIL NO SCALE Fire Strobe (where applicable) typical Signage Location. Signs Bode Budding Standard. Signage to include room number, room, name and Braile lettering. Signage shall complywtih notes on Sheet 6" 6" A002 ands applicable standards pp accessibility for e.Cottopsamples / poor to forOwnerand Architect approval 4" ordering. / Switch(es), Cardreaders, Pushbuttons, 1Il1 Muse Thermostats - Multiple switches shall be ganged togetherunderasingle faceplate unless otherwise indicated. r Thermostals shall be located 6" from the L center of the adjacent switch device. In the event of a switch gang larger than shown, adjust thermostat location proportionally. d Doorand hardware asscheduled. E b to \ h Outlets -If within l'-6" horizon}ally of doorjamb, align with switch and/or other \ Notes: I. Provide bled king on studs to align CIL centers of back boxes. 2. Refer to Architectural Specifications or Project Standards sheet for all device and coverplate styles & colors. If applicable, refer to electrical drawings & specifications for additional information. 5 TYPICAL ALIGNMENTS 3/4'= 1'4' RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes e City of Camel (� �1VTl�IlmnrJAaAJ+L DATE: \ 02/13/19 BUILDING NOTES ABBREVIATIONS A.F.F./AFF Above Finished Floor 010000 General Contractor is to request the full set of Contractor Rules and Regulations from the Landlord upon receipt of drawings and become familiar ACT Acoustical Ceiling Pe with additional information pertaining to the building not covered in the drawing set. APPROX. Approximate 010wo The Budding Notes Listed below shall be used for pricing purposes only, and where conflicts arise, they shall be superceded by information provided B.O. Bottom of In the drawings and specifications. The notes represent the Owner/Landlord/Architect's best understanding of existing building components and BLKG Blocking systems and shall be verified in the field by a qualified contractor and any discrepancies shall be brought to the attention of all parties far resolution prior to formal bids are submitted for the scope of work, SOT Bottom 015000 The Contractor shall carefully protect all doers Ito all elevators, mechanical/electrical rooms, stairways, janitorial closets, resimoms, hall doors, etc.) CAB Cabinet walls, carpets, floors, fumiture a no fixtures a no shall repair or replace damaged property without cost to the Owner. Contractor shall maintain a CJ Control Joint weather tight condition to the existing building throughout the construction period. Contractor shall repairany damage caused by construction CL Center Line operations. CMU Concrete Masonry Unit 0192DO The General Contractor will be held responsible formainiaining the integrity of the Building Life Safety System in areas under his construction and COL Column withinhiscordrol. At stairwell doors shall remain closed at all times. Contractors shall comply with all OSHA regulations. In the event that smoke CONC Concrete detectors are covered, this should be coordinated on a dolly basis with Property Management. The job supervisor must ensure that covers are CONST Construction removed and the life safety system is operational at the end of each day. 024100 The Contractor shall notify Landlord 48 hours prior to commencement of dusty work (sheet rock cutting, sanding, extensive brooming, etc.) so CPT Carpet Landlord may a range for additional filtering ca pacify on the affected HVAC equipment, if necessary. Failure to make such notification will result in CT Ceramic ne the Contractor absorbing the costs to return the equipment to proper condition. It will be the responsibility of the General Contractor to supply and CW Cold Water change return air filters during construction, and after construction is complete if air is raw during construction. The Contractor must also provide DET Detail protection for smoke sensing devices in order to prevent contamination of heads and fire system false alarms. if false alarms occur, fines will be DE Drinking Fountain imposed and are due and payable upon receipt to the Landlord. DIM Dimension 024100 Anyand all materials removed and not reused in the construction, except as directed by the Landlord, Shall be disposed of by the Contractor as DP Deep/Depth waste or unwanted materials. The renovator shall fellow all construction waste management requirements established h the Project Notes relateds to redemption and recycling. The ebrsem shall al Fiat a depwasteosited sited In the building ih s trash r sh shall be rs. Damage e freight elevator with Properly Management's DWG Drawing cause byth 1. Connditofoonstrusshall noibedeposiled in theeeeral Contractor. The. Damal Contretorwit ersand/or ponsiadditional hauls E.T.R. Existing to Remain caused by the disposal of construct on debris will be bllletl to the General Contractor. the General Contractor wit be responsible for maintaining EA Each separate hash d umpber to be located in an area desig noted by Property Me mg ement. The Cum Oster a rea shall be kepi clea n and all materials El FS Exiencr Insulation Finish System contained within the dumpster. In the event an area is not kepi clean and in respectable condition, Property Management will cause the area to EJ Expansion Joint be cleaned by building personnel without prior notice to the General Contractor, who will subsequently be billed for the clean up. EL 9evation 087100 cloor sers and smoke kesealshall as finish at raeof dass assemblies, standards. Provide lrallc carry sets, bullhe prate, stops and k-Hersncers Interchangeable cores. ELEv 9evation closers and smoke seals as required at rated assemblies. All rated doors shall carry the appropriate Warnock -Hersey Ivbel, 087150 All keying and re-ke in ofc find ers s hall be coordinated with Landlord or or to work comm ending. Allc ind ers shall be keyed accordingto the EWC 9ectric Water Cooler y g y, y p g yl y EXIST Existing bulltling keying system. 104400 Smoke, Heat and Duct Detectors shall match budding standard and be compatible with the existing fire all control system. EXISTG Existing 104400 Audible/Visual Devices shall match the building standard make model and color unless approved by the Landlord. EXP Expansion or Exposed 104400 The General Contractor shall verify the make and model of the existing fire alarm control panel. All work to tie new devices into the existing system EXT Exterior shall be performed by the vendor pre -authorized by the Landlord, F Fabric/Textile 122000 Blinds at exterior windows shall match building standard: Leveler "Rivera "blinds with l"aluminum slats. Finish shall be Mark-L clear anodized. Review FD Roor Drain condltlon of existing blinds with Landlord prior to start of construction activities. HE Fire Extinguisher 211300 Fire sprinkler heads shall match building standard type and finish, as appropriate for similar ceiling types. FEC Fire Extinguisher Cabinet 224000 Water Heaters shall comply with existing building Standard make and model range. Verify in field with Landlord. FIN Finish 230000 Thermostats shall match the existing building standard. FLR Roor 230000 Supplemental air conditioning units (serving areas which exceed the base budding allowable loads) shall be approved by the Landlord, with FT Feet condenser mounted on the roof in location approved by the Landlord, Supplemental AC usage shall be metered with a building standard tenant GA Gauge electric meter. GB Grab Bar 233000 All airterminaldevices shall match the existingbuilding standard make and model Devices shall be installed erbuildin standard details g O g GL Architectural Glass (Art Glass) appropriate fora specific ceiing assembly. GWB Gypsum Wall Board 233000 All supply duclworkwithin insulated ceiling plenums shall be externally insulated sheetmetal with l-inch thickness R 4 fiberglass duct wrap with HDWR Hardware kraH-scrim-foil vapor barierjacket. On ducts over 18" wide, apply weldclips or stickclips to bottom of duct spaced 18" on center each way maximum. Seal all longitudinal a rid transverse seams a rid all punctures caused by weldclips with 2" wide SMAC NA tabled duct tape a nd mastic. HM Hollow Metal 233000 All return ductwork within insulated ceiling plenums shall be internally lined sheet metal with l-inch thickness 1.5 pcf density R-4 fiberglass duct liner. HORIZ Horizontal Airstream surface coating shall contain animmobilized EPA4egisieretl antimicrobial agent so it will not support microbial growth, as tested in HVAC Heating, Ventilation and Air Conditioning accordance with ATSM G21 and G22. Duct liner shall be fastened with stickcli sor weldcli ss aced l8inches on center each way maximum. Just P O P Y HW Hot Water before sections of ductwork are hung, coat end laps of duct liner with insulation cement and hang. JSi Joist 233000 All flexible duct used within insulated ceiling plenums shall be minimum or R4 insulation value, Flex duct shall be factory fabricated assembly JT Joint consisting of a zinc -coated spring steel or spiral aluminum helix, seamless liner shall be CPE film mechanically locked to helix without adhesives, KIT Kitchen Insulation shall be factory wrapped fiberglass blanket, vapor bonier shall be fire retardant reinforced aluminum material. Flex duct shall berated for LAM Laminate 4000 fflm velocity, 6inch w.g, positive working pressure, I inch negative worIang pressure. Flex duct shall be UL class I duct with flame spread of not over 25 and a smoke development rate of not over SD. Where flexible duct length exceeds 72-inches, horizontal support is required. Ducishollbe LAV Lavatory suspended on 36-inch centers with a mini mum 3/4" wide band strap and a minimum 6-inch wide sheet metal protective saddle. Alljointsand LF Laminate Flooring connections of flexible ductshall be made by installing "panduit" straps on innerjackei, sealing outer jacket with 2 wraps of SMACNA approved cut LLH Long Leg Horizontal tape, and installing an additional" panduit" shop overthe duct tape. LLV Long Leg Vertical 233000 All new HVAC equipment shall match existing building standards or receive explicit approval from the Landlord. M Metal 233WO Dampers shall match building standard make and model and shall fail closed and be wtih base buddin fire alarms tem. o g g W M.O. Masonry Opening 233723 General subconbcctoractor of choice update leteasgacted system won which shelf u theLingnew graphic to be actualentered Into Ing Into t Contractor may siern. ze MAS Manufacturer subcontractor of choice to complete associated work, but shall utilize the Lantllortl's vendor for actual uploading into the building's system. ARIAS Masonry 260000 All electrical equipment Ipanelboards, breakers, meters, transformers etc.) shall match existing building standards. MAX Maximum 261000 Electrical and lighting devices shall match existing building standard make, model and color, unless approved explicitly by the Landlord. MB Marker Board 261000 Floor mounted power and data receptacles shall be approved, fire rated assemblies, Wiremold/Legrand models with a minimum of (4) CatSejacks MECH Mechanical and I I /2" conduit, and (2) duplex receptacles. 265100 Fluorescent lamps and ballasts shall match building standard manufacturerand type. MHz Mezzanine MFG Manufacturer MIN Minimum N.I.C. Not in Contract O TOO Out to Out SYMBOL LEGEND C.H. Opposite Hand OD Outside Diameter O OPNG Opening - Keyed Note. Refer to Keyed Note Schedule on some Opp Opposite PL Plastic Laminate 101 - Door PLAM Plastic Laminate PLWD Plywood Room Name PS Projection Screen 101 Room Name, Size and PT Paint R Riser RA Return Air 1��Elevation FEE Reference Sheet REFR Refrigerator A101 RED D Required Section RF Rubber Flooring RO Rough Opening SIM SA Supply Air 1 SC Sealed Concrete A101 Sheet SCHED Schedule Detai SEC Section SIM BE Square Foot 1 0 SIM Similar Sheet SPECS Specifications SS Solid Suface Enlarged Plan or� ST Stone Detai I STD Standard _ _ J STL Steel SUSP Suspended Revision T Tread T.O. Top Of TB Tack Board Elevation TEL Telephone TMPR Tempered Alignment Notation - text may TR Trim (Includes stair heads, nosings, be abbreviated for clanN on transition strips, comer guards, etc.) sheet, or omitted entirely TV Television TrP Typical n Terrazzo UNO Unless Noted Otherwise UR Urinal V.I.F. verify in Field VCT Vinyl Composition Tle VEdT Vertical VT Vinyl Tie VWC Wallcavering W/ With W/o Without WB Wall Base WD Wood WE Wood Flooring WH Water Heater WKP Working Point WP Wall Protection XXXO Indicates finish to be determined XXX-E Indicates existing finish to remain 3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317,843,5975 SOUTHWEST 12301 Research Blvd Bldg IV - Suite 130 Austin, TX 78759 Tel 512.977.0520 Fax 512.977.0384 - arsondesign.com ` L O M O o Oma 611111111111111 Mill Q V O �U o� E W (D a0 C .C2 U O O 0 c a O _ wvf " O /�/� if Z will mil U Fro Z Vf N Q A� Y/ A• V/ V /` 0 O i W STAMP: `"OTytyM\CH utUiii ST�( ° AAvpi E 9 v F 3 DIA O %xOgzgR Hill ET t OAxxA 01.11.19 ISSUE: Review Set 01.11.19 DRAWING TITLE: General Information and Standard Details JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A001 COPYRIGM20I5 CARSON DESIGN ASSOCIATES ACCESSIBILITY GENERAL NOTES BUILDING ELEMENTS NOTE: All conditions are not represented in these d eta its. It is the responsibility of the General Contractor to comply with all a abided l e codes, to include accessibility require me nts. The details shown have been provided as a courtesy. THE FOLLOWING SECTION OF DETAILS PROVIDES INFORMATION ON RESOURCES AND REQUIREMENTS FOR DISABLED ACCESSIBILITY. THE REQUIREMENTS COMBINE MINIMUM REQUIREMENTS OF LOCAL, STATE, AND FEDERAL AGENCIES. CHAPTER 3: BUILDING BLOCKS CHAPTER 4: ACCESSIBLE ROUTE C 3 THE PURPOSE OF THIS SECTION IS TO HELP AVOID INSTALLATION OF MATERIALS ON CA R S O N CONSTRUCTION PROJECTS THAT WOULD LIMIT AC DIVID LI TY. THESCOPE QFTHISSECTIQNISLIMITEDANDTHEINDIVIUALSWQRKING Carpet Pile Ht. Vertical Level Change Beveled Level Change Protruding Objects Accessible Route ON THE PROD ECT SHOW LD FAMI LIAR I ZE THEMSELVES WITH LOCAL ACCESSI BI LI Try STANDAR DS(2009 I CC/ANSI A117,I) AN D AM ERI CAN WITH DI SAB I LI TI ES ACT ACC ESSI BI LI Try GU I DELI N ES 24" 48" 24" DESIGN IJP` N (ADAAG) FO R AD DI TI O NAIL I N FO RMATI ON AN D REQU I REM ENTS. COPI ES OF TH ESE x Sign MAX. MIN. MAX. G S 1G DOCUMENTS MAY BE OBTAINED BY CONTACTING THE FOLLOWING: _$ - 2 g 4"MA%. LEAR WIDT NY AMOUNT 1 p Obstruction , ADAAG: _F = F ASSOCIATES United States Access Board IN N 1331 F Street NW, Suite 1000 �' i° n' '"asMIDWEST Washington, DC 200/1111 9229 Delegates Row Voice: (202) 272-0080 or (800) 872-2253 http://www.access-board.gov/guidelines-and-standards/ - - z CLEAR WIDTH OF AN ACCESSIBLE ROUTE Suite 250 (;� Turning Space - Circular T-Shaped Turn Space �- r Indianapolis, IN 46240 INTERNATIONAL CODE COUNCIL: $ f4 Te1317.843.5979 Fox3l7.843.5975 500 PHONE: JERSEY AVENUE, NW, 6TH FLOOR 60 WALKING PA�LLELTO WALL Om 42"MIN. <2"M j wpsHlNGroN,DCz000l r 6- z o SOUTHWEST PHONE: 888.4422J239 12301 Research Blvd IN. 36"MIN. 36"MIN. Bldg IVSuite130 IN THE EVENT THE INFORMATION ON THE PLAN SHEETS DOES NOT MEETTHE MINIMUM \ _. X 49 X <q8^ Austin, TX 78759 REQUIREMENTS OF THE SECTION, THEN THE INFORMATION SHALL BE PRESENTED TO THE z ie1512.9]70520 Fax 512.977.0384 ARCHITECT FOR CNRIFlCATION PRIOR TO CONSTRUCTION OF SPECIFIC AREA OF WORK. Gratings LONG DIMENSION °j i 180DEGREETURNS f-PREDOMINANT--arsondesigacom OFPERP. TRIO ROUTE DIRECTION OF , r PROTRUDING OBJECTS AND HEAD ROOM IN PEDESTRIAN WAY TRAFFIC WALKS, HALLS, CORRIDORS, PASSAGE WAYS, AISLES INCLUDING UNIFORM FEDERAL ACCESSIBILITY STANDARDS (ADAI OF TRAY EL n -I-I-I-I-I-I-I-� CLASSROOMS, OFFICES, ETC. AND OTHER CIRCULATION SPACES. bidding accordance with avolvin accessibility of or the followingstandardspublic shall be included when �Ij_1'- II- 1'- 1'- II- 1'-'rlj Clear Doorway Width &Depth Vision Panel Heights commercial on projects involving items not conforming or ing to facilities for public accommodation or 12' 36" MIN. 12' commercial facilities. Any items not conforming to these or any other standards, codes, or-,L-I/2"MA%.MIN.I . ordinances shall be brought to the attention of the project architect for his Interpretation, In the event the information listed in this document conflicts with any portion of the work described in GRATING ORIENTATION GRATINGS the Contract Documents, the contractorsholl notifythe Architect in writing, of his need for a U MI ED U MI D 3 N- solutiontoresolvetheconflict. The mounting heights indicated are for items that require Spaces accessibility by disabled individuals. Where two or more items are dropped in one area !mirrors, 0" MAX g,_ 30" q• MA 4" MAX i Clear Floor �r sinks, toilets drinking Iou ntains, unno Is, shelves, telephones, etc.! not all items in area have to be v 2 MI mounted at handicap height Mounting heights of items where more than one is furnished in a _ _ _ _ K 3 " N. particular space shall be determined by the Architect in field. These will not furnished in a particular q$ r ? m DETAIL / VISION PANEL space shall be determined by Architect In field, be Installed at H.C. height Contractor to a coordinate - - - - - - - - - - N POST x X> 12' > 12' ' these installation heightswith othermaterials forneat trammed out and finished appearance. Items ^ `" E HINGED DOOR o for disabled individual use shall be mounted at height indicated for grade level / age level as noted. - - LL m +' M' 36"MIN. 1.DOORS AND OPENINGS > i Change Thresholds ds and Floor Level ChangesatDoorways: POST -MOUNTED PROTRUDING OBJECTS FIGURE 307.3 32"MIN. L (V Changes in level at doors shall not exceed one-half inch jl /2"� in height and shall be beveled _ _ _ _ _ _ _ _ _ _ _ _ with a slope no greater than 1:2. (ICC/ANSI AI 17.1. Section 303) J SLIDING DOOR E O O B.DOOR HARDWARE L - - - J •� 0. `O Handles, pulls, latches, locks, and otheroperating devices on tloors shall have a shape that is x O � CLEAR FLOOR SPACE FRONTAPPROACH PARALLEL APPROACH ¢ L easy to grasp with one hand and does not require tight grasping, tight pinching, or twisting to i >r Z operate. The force required to activate door hardware shall be no greaterthan five as. Mounting Heights O 0 Acceptable designs include lever- operated mechanisms, push -type mechanisms, and Ushaped handles. When sliding doors are fully open, operating hardware shall be exposed and usable Clear Floors aces in Alcoves 3Q" GLAZING PANEL (no farm both sides. Doors to hazardous areas such as loading platforms, bollerrooms, mechanical p 32"MIN. viewing permitted }� U O and electrical rooms, stage, and other areas that might be dangerous to a blind person, shall be x FORWARD AND SIDE REACH MOUNTING MAXIMUM DOORWAY DEPTH through door) V^, made identifiable to the touch by a textured surface on the door handle, pull, or other operating 30 HEIGHT FOR SHELVES & DISPENSERS (TO FOLDING DOOR hardware. This textured surface may be made by knurling car roughening (no tape plowed). Such CONTROL DEVICE) SWITCHES AND textured surfaces shall not be provided for emergency exit doors or any doors other than those to CONTROLS AND TELEPHONES (MAXIMUM •U > hazardous areas. (ICC/ANSI At 17.1, Section 404.2.6) - TO TOP DEVICE)Q C. DOOR CLOSER AGE HIGH LOW 6 C f a door has a closer, then the sweep period of the closer shall be adjusted so that from an - MAXIMUM MINIMUM //FI� C) open position of: (a) 90 degrees, the time required to move the door to a position of 12 degrees from 32" MIN. E y/ O the latch is 5 seconds minimum. CCC/ANSI At 17.1, Section 404.2.7.1) - Ages 3 & 4 36" MAX. 20' MIN. Li D.DOOR OPENING FORCE x O wN The maximum force for pushing or pulling open a doorshall complywith this paragraph. For E Ages 5-8 40' MAX. 18" MIN. BARN DOOR hinged doors, the force shall be applied perpendicular to the door at the door opener or30 O /1 O L inches from the hinged sid e, whit never is further fro m the hinge. For sl iding or folding doors, o Ages 9-12 44"MAX. 16"MIN. L w- t the force shall be applied parallel to the door at the door pull or latch. _will U(1)Intedor hinged doorsshall notexceed 5.0Ib j22.2N maximum. ole-L - M ADULT REF. REF. Maneuvering Clearances at Door N N Q Z (2)Sliding doors or folding doors, and interiorhinged doorsshall notrequire a force DIAGRAMS DIAGRAMS exceeding 5.0 (22.2N maxmum. UNOBSTRUCTED FORWARD d (3)Fire tloors may to adjusted to meet the minimum opening force allowed bythe O REACH LIMB PULL SIDE IS"MIN. PUSH SIDE q� ` sO governing t17.,authority coon applicable building code. NOTE: ,�,y- EoL / W (ICC/ANSI At 17.1, Section 404.2.8) I.X IS LESS THAN OR THAN TO NOTE: 2.IFXIS GREATER THAN IS", THEN AN r �r � AsI.X IS LESS THAN OR EQUAL TO 24. + I 2.CONTROI$ AND OPERATING MECHANISMS ADDITIONAL MANEUVERING CLEARANCE OF IF X IS GREATER THAN 24, THEN AN A.AII controls and devices having general use mechanical or electrical operating mechanisms 2.12" SHALL BE PROVIDED AS SHOWN BELOW SE - _ which are expected to be operable by occupants, visitors, or other users of a building or ADDITIONAL MANEUVERING CLEARANCE OF 6" % 30'. 10' TO 2 " 10" MAX. 30' e v facility, shall comply with this subsection, Such mechanisms may include, but are not SHALL BE PROVIDED AS SHOWN BELOW limited to, thermostats, light switches, alarm activating units, ventilators, electrical outlets, STAMP: paper towel dispensers, etc. (1)Clear Floor Space: ,y--� NOTE: FRONTAPPROACXA clear floor \tlOnnnpUlZ7 wheelchairshaa bece fhat allows a povidedatalll oofolls,disspensers, or parallel approach receptacles,person nd otherrgd COMPLY WITH THE FRONT ALL DOORS IN ALCOVE ALL X=12" IF DOOR HAS BOTH A CLOSER NOTE SLIDING AND FOLDING DOORS `15H ��� v operable equipment The space shall neverbe less than an area 30 x 48 inches. 'r u Q APPROACHES CLEARANCES AND ALATCH (2)Height: , x FRONT APPROACHES - SWINGING DOORS = 9 - The highest operable partof anycontrol, dispenser, receptacle, and otheroperable a = = 5 equipmentshall be no higher from the floor than height indicated on attached v - i m - F sketches fa forward and side approach exceptwhere theuse of special equipment "v ? PULL SIDE PUSH SIDE 54"MIN. dictates otherwise. Electrical and communications systems receptacles on walls - X .S \O` shall be mounted no less than fifteen inches (15" ) above the floor. _ �'xXi 4RCHITEC XF (3)Operation: - - - L�:, M N 2' MIN r - - - - - �xIIIlI1111111110\\0\ Controls and operating mechanisms shall be operable with one hand and shall not L - - - MAXIMUM SIDE REACH HIGH AND LOW require fight grasping, pinching, or severe twisting of the wrist The force required = ? OVER OBSTRUCTION SIDE REACH LIMITS r 4" M ito activate controls shall be no greaterthan 5 all Hand operated meterng faucets shall Ea 01.11.19 remain open for 10 seconds minimum. ISSUE: A 3.SIGNAGE Review Set 01.11.19 A. W herever signage is used for emergency information or general circulation directions or FRONT APPROACH for the identification of rooms and spaces, at least one unit of signalshall be provided PARALLEL APPROACH NOTE: NOTE: SLIDE SIDE APPROACH for each function and each room or space that's identified. I.X=36"MIN. IF Y=60" Y=48" MIN. IF DOOR HAS BOTH A SLIDING AND FOLDING DOORS (1)Character Proportion: 2.X = 42" MIN.IF Y = 54" LATCH AND A CLOSER Letters and numbers on signs shall have a width -to -height ratio between 3:5 and I:1, ITEMS WITHIN DASHED HINGE SIDE APPROACHES - SWINGING DOORS and a stroke width -to -height ratio between 1:5 and 1:10, using an uppercose'X"for Knee and Toe Clearances LINE ARE WITHIN REACH measurement. (2)Color Contrast CLEAR FLOOR OR PULL SIDE % % PUSH SIDE Characters and symbols shall have controstwith theirbackground. r - - GROUND (3)Tactile Characters and Symbols: SPACE SHALL EXTEND NO 4" MIN 24" MIN. Characters, symbols, or pictographs on signs required to be tactile, shall be raised MORE THAN 25 in. UNDER r I /32 in. minimum. Letters and numbers shall be Sans Serif characters: shall beat ? IL THE OBSTRUCTION17- 25' 25' MAX. least rda nc high, but parag be no higherthan 2 in.; antlshall be proportioned in♦ accordance with subparagraph 3.A.1 above.(4)Mcunting Height and Location: pRoom identification signsshal be mounted on the walI surface on the latch (strke)side of doorsshall be 60in. (60") above the finish floortothe centerline ofthe sign - - - and 8 in. (8") max. from the outside edge of the door frame. PLAN PLAN (5) Braille shall be positioned below the corresponding text in accordance with 48" LATCH SIDE APPROACH Sections 703.3 and 703.4 _ NOTE: NOTE: SNDING AND FOLDING DOORS MAXIMUM FORWARD REACH Y = 54" MIN. IF DOOR HAS CLOSER Y = 48" MIN. IF DOOR HAS CLOSER MIN. OVER AN OBSTRUCTION (SECTION) HINGE SIDE APPROACHES - SWINGING DOORS im NOTE DRAWING TITLE: Proportions of International z I.WHENx<-20°,THEN YSHALLBE48°MAX. 20091CC/ANSI Al 17.1 Symbol of Accessibility 2. WHEN X IS>2CKTO 25", THEN Y SHALL BE 44"MAX. i 60"MIN. a i ) 48" MIN. _ _ _ _ _ _ NOTE: CLEAR FLOOR SURFACES _ - AT MANEUVERING CLEARANCES IEE SHALL BE LEVEL WITH NO HEIGHT TRANSITIONS OR SLOPES. RELEASED FOR CONSTRUCTION a � _ a (EXCEPTIONS: THRESHOLDS AT JOB NO. 11840930 EXTERIOR DOORS THAT ARE ACCEPTABLE BY STATE AND DATE: 01.11.19 pR' �6s Subject to compliance with all regulations Ica _2 FEDERALAGENaEs). SHEET NUMBER: of State and Inca! Codes 6" MAX. 11" MIN. SECTION SECTION /r/� City dCamel w 002 TOE CLEARANCES KNEE CLEARANCES wV9lWbat __________ TI0.R� 7W0 HINGED DOORS IN SERIES cwrrzlpwmis arsw+oalcr+asuaua \1tt e DATE: 02/13/19 BUILDING ELEMENTS NOTE: All conditions are not represented in these details. It is the responsibility of the General Contractor to comply with all applicable codes, to include accessibility requirements. The details shown have been provided as a courtesy. CHAPTER b: PLUMBING ELEMENTS AND FACILITIES I CHAPTER 9: BUILT-IN ELEMENTS .3 Grab Bars Mirrors I I/ " I I /4" to T' GRABBAR E 5 v a FIE2 t MIRRORABOVE FU ILL. LENGTH LAVATORY OR MIRROR COUNTERTOP Water Closets and Toilet Compartments WHEELCHAIR AMBULATORY ACCESSIBLE ACCESSIBLE WATER CLOSETS WATER CLOSETS (Required if total toilet + urinal fixture count is greater than 6) TOILET COMPARTMENT CLEARANCES _ 4' 4 "MIN. Toe Clearance requ red / at front and ONE side EXCEPTION: Toe clearance not required at front partition if 62' depth at Wall Hung WC or 65" depth at Floor Mounted WC. Toe Clearance not required at side addition if 66"clear width is provided. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel ((�� �vm�ilanrk\p�sL DATE: 02/13/19 Clear � Floor Space tl 56" MIN. At cult Wall Hung W 59" MIN. At Adult Floor Mounte WC and all Children's WC Provide maneuvering clearances to Seating, Furnishings and Tables, as per 305 for a Forward Approach. Knee and toe clearances complying with 306 shall be provided. 17-25° MAX. of Toe Clec IF built-in Dining or Work Surface is within Accessible Route, provide end panel as a required for Protruding Objects mmm °'Z �26"Min. &30"Max. where Dashed Line represents Dining Dining and Work Surfaces are minimum Knee Cl earance primarily for Children's Use requirements, as per 306.3 6 MAX. NOTE: Reference 904 for all DINING SURFACES AND WORK requirements of Check -Out Aisles SURFACES HEIGHT REQU IREMENTS and Service Counters CLOSET CLEARANCE GRAB BAR, FLUSH CONTROLS &SEAT HEIGHT REQUIREMENTS 60" MIN. - 39oi"l" Grab Bar (Typ.) NOTE: The required clearance around the water closet shall be permitted to overlap the 54" Min. water closet, associated grab bars, dispensers, 24" 12" 7 7earand sanitary napkin disposal units, coat hooks, 21'M Xq2"Min. __ _� MIN. MIN. shelves, accessible routes, clear floor space clearances required at other fixtures, and rr a Floor the turning space. No other futures or rehansfer Space obstructions shall be located within the 16"-IB" J required water closet clearance (INCLUDING LAVATORIES(. Lavatories may overlap the _ required clearance at water closets at private Side Wall Flush Back Wall residential dwelling units ONLY, Controls Door Location Doors at Toilet Compartments to comply with 404 (excluding latch side approach clearance width required which shall be as shown in the diagram to the left(. Doors shall be self closing, with a door pull complying with 404.2.7 placed on both sides of the door, near the latch. Door may not swing into the required minimum Clear Floor Space. Coats and Shelves (if provided) shall be installed within Reach Ranges as specified in 308. AMBULATORY ACCESSIBLE TOILET COMPARTMENT CLEARANCES 4 II 4T' MIN. EO" MIN. LAVATORY SINK ~Partition LInside Stall w Required toe 5 p E clearance at front w 4 r and ONE side partition URINALS 13112'Min. 131/2" Min. NOTE: Provide NOTE o Clear Floor Space complying with K Forward Approach (305) acceuble Orin IS Wall Hung Type Stall Type Hot water and drain pipes under lavatories and handicap accessible sinks shall be installed crotherwise configured 17"MIN,& to protect against contact. 25" MAX. TO EDGE I ]" Min. Dashed Line represents minimum OF TOE CLEARANCE 25" Ma Knee Clearance requirements, PARALLEL APPROACH IS as per 306.3 PERMITTED FOR LAVATORIES z ----tMIN AND SINKS USED PRIMARILY i i O BY CH I LD REN AGE 5 AND UNDER. tr f` z F NOTE: Provide 24"6" Line represents Clear Floor clearance to bottom of MAX. Space r Space requirements, as per 305 sink/apron and 31"to top COUNTER MOUNTED SINK rim of sink for Lavatories PLAN and Sinks used primarily by children aged 6-12 MOUNTING HEIGHTS FOR WATER CLOSETS SERVING AGES 3 THROUGH 12 GRADE LEVEL/AGE WC CENTERLINE TOILET SEAT HEIGHT GRAB BAR HEIGHT DISPENSER HEIGHT Ayes 3 and 12, II"-12' 18"-20, 14' Ages 5 and 12"-15' 12"-IS' 20"-25' 14"-17' Ayes 9 and 12 15"-18" 15"-17' 25"-27' 17' 19' ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Te13 V.843,5979 Fax 317,843.5975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Tel 512977.0520 Fax 512.977.0384 -orsondesign.com LC CA ma .i ,O � Q NOO v o a Z � O V _ /a� W TA V /�� W m C I>Y .C) U N > E�^I, W O � C) N O wtn U. ° O = C O s n v QU o X ND W rn STAMP: `"OTy1TM\CH Ul4iii �( ��0'k�EGISTE 9 v F —' DIA .S H`p� 9]]xxgRUi E`yxp0 01.11.19 ISSUE: Review Set 01.11.19 DRAWING TITLE: 2009 ICC/ANSI Al 17.1 Plumbing & Built -In Elements JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A003 CG%RIGMIDIS CPRgJ DESIGN ACIJOPiES LIFE SAFETY LEGEND 2 FIRST FLOOR - OVERALL PLAN (FOR REFERENCE ONLY)------------------J 1. Applicable Codes 2014 Indiana Building Code (2012 International Building Code with Indiana Amendments) 2014 Indiana Fire Code (2012 International Fire Code with Indiana Amendments) 2013 Americans with Disabilities Act Accessible Guidelines ADAAG) fa Buildings and FacYiHes 2011 American National Standards Institute Accessible and Usable Buildings and Facilities Standard (ANSI At 17.1-2009) 2009 Indiana Electrical Code (2008 NEC with Amendments) 2014 Indiana Mechanical Code (20121MC with State Amendments) 2012 Indiana Plumbing Code (20061PC with State Amendments) 2010 Indiana Energy Conservation Code (6751AC 194) consisting of ASHRAE Standard 90.1 (2007 with State Amendments) 2. Summary Notes Number of Stories- 1 This project does not change the Use or Occupancy of the existing space. Height of Builtling- I Total Area of Building- 100171 RELEASED FOR CONSTRUCTION CES Subject to compliance with all regulations Islanae of State and Local Codes veen Exits City d Camel o-o DATE: 02/13/19 Exit Route From Suite / Room CODE - OCCUPANCY CLASSIFICATION & LOADS, PER SPACE CODE - CONSTRUCTION TYPE CODE - TRAVEL DISTANCES PROVIDED Deal E E. } - Will ' mmm , Area A Restrooms E1-1052 ® LLA 1081 SF ftiftift � E El ' Area B lift' Vestibule E1-1000 E 72 SF lIT b Area C Brea krm. E1-1050 1384 SF 1 LIFE SAFETY PLAN 1116" =10 PLAN SR iI �ll ExitSign 4 P Emergency Wall Pack EXIT 7 Point of Egress FEC Fire Extinguisher Cabinet Overall Diagonal Distance wr_ e e wr_ Max Dead End Distance e e e e e Mox Trovel Distance Common Path of Travel ■ Indicates area not in contract. Refer to floor plans for additional information. Note: See construction drawing sheets and specifications for full extent of project scope Note: All existing paths of egress remain unchanged in this project unless noted otherwise. .3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.8435979 Fax 317.8435975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Tel 512.977.0520 Fax 512.977.0384 r. arsondesign.com CCq 0 0w_} � eO a O i p z O 00 V 1- 0 _ a a)MID 4).a a0 C U > a� � a O _o 'cn Ll 0 O C WillZ U € Z Vf Vf Q a� a� x o 0 iW LO STAMP: `"OTytyM\CH ut4iii �( ° vyvpi ��0-k�ryGI5TE = 9 v F -' 'O DIA O Hi n �TxNxxx` 01.11.19 ISSUE: /L Review Set 01.11.19 DRAWING TITLE: Code Information JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A011 cull Dean AssoaArss GENERAL NOTES & REFERENCE SPECIFICATIONS GENERAL NOTES & REFERENCE SPECIFICATIONS GENERAL NOTES & REFERENCE SPECIFICATIONS A. General I . It is the Building Owners and/or Tenant's responsibility to review and check the construction documents prior to construction and verify any and all locations, sizes, quo ntities and ecific materials used in con�nctionwith the Building Owner's and or Tenant'ss special ud mentla out, use or function. q P 1 9 / P q P Y 2. These contract documents do not attempt to instruct the Contractor in the specific details of their trade. 3. Work in accordance with the quality standards of the trade and installed in compliance, as a minimum standard, to a pplicable Local, State, Federal codes and Manufacturer's recommendations. 4. Work is warranted satisfactory, in materials and workmanship, for a minimum period of one (1) year or for the customary period of warranty or as stipulated for the trade, craft or product whichever is longer. 5. The drawings indicate the general scope of the project in terms of architectural design concept, dimensions of the building and majorarchitectural elements. As scope documents, the drawings do not Indicate or describe all the work required for full performance and completion of the requirements of the contract documents. On the basis of the general scope indicated or described, the Contractor shall tumtsh all items required for the proper execution and completion of the Work. 6. Commencing work by a Contractor constitutes acceptance of the conditions and surface concerned. If such conditions or surfaces are unacceptable, the Owner and Architect shall be notified immediately and work should cease until the unacceptable conditions can be remedied. 7. Itemsnoted "N.I.C"(Not in Contract), "By Owner/Temnfor"Existing" shall not be included in the contract. Provisions shall be made by the respective trades to allow for the installation or preservation of the items noted All finishes of floors, bases, wainscots, walls and ceiil ngs behind under antl/or over these items shall be included in the General Contract unless otherwise indicated. S. The coordination of materials, labor and worlana nshtp is the sole responsibility of the Contractor- to INCLUDE items furnished by Tenant for Contractor Installation. 9. Dimensions are taken from the face of masonry walls, column centerlines, finish face of existing walls antl/or stud face of new walls unless otherwise indicated. 10 Do not scale drawings. Refer to dimensions illustrated on drawings. Notify the Architect of discrepancies or for clarification. 11. Contractor shall order and schedule delivery of materials in ample time to avoid delays in construction. The contractor shall notify the Owner, Tenant and Architect within seven (7) doys of contract award if any item is found to be unavailable or have a long lead time. 12. Cc nfrador shall provide subco nfrador with complete Architecture and Engineering Drawings. The Contact stall notify Architect or Engineer of any conflicts or discrepancies prior to bid date for resolution. B. Building Rules I The Contractor is responsible for obtaining a current copy of the Building Rules antl Regulations from the Building Owner or Property Manager. Compliance with the Building Rules and Regulations shall be maintained throughout the duration of this project. 2. The contractor shall coordinate with the building owner and/or property manager access to the space on all ongoing cc nst uction work. Disruptive or potentially hazardous construction activities shall be coordinated to occur after normal business hours to minimize the disturbance to building occupants. The contractor shall review project phasing and detailed construction schedule plans with Building Owner, Property Manager and Architect prior to bid and start of construction. 3. The Contractor shall coordinate Whine Building Owner and/ or Property Manager for delivery to the space of all building materials, and shall arrange for the usage of the appropriately designated elevator. The Contractor shall coordinate such deliveries in a manner which poses no hazard to any personnel within or around the building and construction site, 4. Transport hash, rubbish and debris from the site and legally dispose of some, The manner of removal must be confirmed with the Building Owner and as allowed by City and State regulations. C. Bidding 1. The Contractor is responsible for obtaining a clarification from the Architect prior to bid submittal and/or start of construction with regard to any question regarding the contract documents, existing conditions or design intent. 2. The Contractors bid is based on providing specified items. Substitutions are considered only under the following circumstances: 1.) The specified item is accompanied by the words "equal to'. Reference to makes, brands, models, et. is to side blish type and quality d esired. 2.) The item is shown to have a prohibitively l ong lead time. 3.) An item of equal appearance and equal or greater quality to the specified item can be provided at an substantial savings to the Tenant. 3. Contractor a Supplier Requests for Substitutions of specifietl items shall be submiLed in writing accompanied by the alternative product information to the Architect for approval. Substitution Requests shall be submitted no later than five (5) working days prior to the bid date. Substitutions shall not sacrifice quality, appearance or function. It is incumbent on the Contractor or Supplier io provide adequate information io determine if the substitute is of equal quality io the product specified. 4. Bids submitted with Substitutions that are not formally submitted and approved as equal prior to the bid date shall not be increased if the substituted material is rejected during the submittal process. D. Permitting 1. The contractor is responsible for contacting local building officials and inspectors for permits and inspections. Advise the Architect immediately of any discrepancies. 2. This set of Architectural drawings and any Incorporated Consultant drawings are intended for permitting only. If Consultant drawings are not included in the set of drawings, the Contractor is responsible for obtaining all required Structural, Mechanical, Eectrlcal, Plumbing and Fire Protection design and permits. E. Scheduling 1. The contractor shall provide a complete project schedule indicating milestone Pates and critical path. The schedule shall be updated and dislrbuted upon any change to critical path, or at each project meeting. 2. The Contractor shall be responsible for advising the Tenant and Architect of all long lead items that may adversely affect the project schedule and shall, upon request from the Tenant or Architect, submit order confirmations and delivery dates for such items. F. Submittals 1. Shop drawings shall establish actual tletail of all manufactured or fabricated items, Indicate proper relation to adjoining work, amplify design details of installations in proper relation to physical spaces and incorporate minor changes of design or construction to suit the actual conditions. 2. No portion of work requiring submission of a shop drawing, product data, samples shall commence until the submittal has been approved by the Architect, All such carillons of the work shall be in accordance with the approved submittals. 3. Shop drawings, product data and/ or samples shall be provided on all items noted and shall not be limited to lighting fixtures, plumbing fixtures, contractor furnished equipment, toilet accessories, doors, frames, hardware, furniture, specialty equipment, and all interior finishes Including but not limited to flooring finishes (i.e. carpet, vinyl etc.) wall finishes Lfe. paint, vinyl wall coverings, etc.) and calling finishes (Le. ceiling tile, paint, etc.) shall be provided to ensure that the specified products are furnished and Installed in accordance with the design intent. The manufacturer or construction of any pieces of equipment, device or other item for which shop drawings, product data and/ or samples are required to be famished, shall not commence prior to complete processing and approval of the submittal. Refer to Finish Legend and Notes on Sheet A241 for specific submittal requirements. 4. Reviewed shop drawings and schedules prepared by others shall not be construed to be pad of the contract documents. The Architect assumes no responsibility, for drawings, schedules and/or specifications for work on the project prepared or accomplished by others, 5. Contractor shall allow for five (5) working days for the Architect and Consultants to the Architect to review submittals. 6. Product data and drawings may be submitted in electronic format. Product samples must be submitted as an actual product sample or the ORIGINAL copy of a product brochure (no scanned or copied product brochures for selecting finish colors will be accepted). G. Project Close -Out 1. The Contractor shall instruct the Tenant or Tenant's Representative in the proper use and maintenance of the equipment furnished or installed by their facials) . 2. The Contractor shall maintain all printed instructions, manuals and warranties that are provided with equipment and materials used or installed. Instructions, manuals and warranties to be delivered to the Owner at the time of Substantial Completion. 3. The Contractor shall provide a thorough construction cleanup prior to Tenant taking occupancy of any space. Cleanup shall include, but not be limited to cleaning all surfaces and vacuuming antl cleaning all carpeting, window treatments and glass surfaces. All protective films, tags, and labels or other markings shall be removed from material fixtures antl equipment. Clean him, outlet and switch plates. Clean plumbing fixtures to a sanitary condition. Clean all light lenses. H. Demolition/Existing Conditions 1. Contractor shall be responsible for field verification of all dimensions and job conditions via to starting construction unless otherwise Ind acted. Notify the Architect of any discrepancies prior to proceeding with demolition. 2. Notify Architect of any deviations in Architectural drawings from existing conditions observed on site. Dimensions of existing conditions are provided as a courtesy, and must be verified on site prior to bidding antl fabrication. 3. The Contractor shall be responsible for verifying all existing work to remain and determining the suite biltty for repair and/or reconditioning to match and blend with new materials and components. Contractor shall obtain the Building Owner's antl/oYTenont's approval of the scope and limit of existing work to remain prior to starting construction. No change orders shall be accepted for completed work that do not conform to the standard established prior to the start of construction. 4. The Contractor shall provide protection for all existing conditions to remain and all building common areas outside the scope of work that maybe affected by the Contractor's work. The Contractor shall be responsible for all damage to such areas caused by the execution of this scope of work, and damage shall be repaired at the Contractors expense. 5. The Contractor shall be responsible for repairing and refinishing walls of adjacent suites outside the scope of work that are affected by the requirements of the work (e.g. level of finish on new demising walls, patching of carpet or calling where affected by a new demisting wall). Specific requirements shall be coordinated with the Building Owner and the annotations noted in these documents. 6. The contractor shall verify existing conditions to determine if leveling or patching of the existing floor slab is requiretl - either because the surface of the slab is not within required tolerances for tnstallatton of new work (Including, but not limited to, operable parttttons and frameless glass assemblies), or because resurfacing is required for installation of specified finish - use a self -leveling cementitious topping equal to Ardex Inc. K-15, installed as per the Manufacturer Installation instructions. 7. The Contractor shall be responsible for testing moisture content of all slabs prior to flooring installation. If testing results are outside the tolerance of specified flooring materials, Contractor shall provide appropriate, approved mittgatton measures. S. The Contractor shall NOT perform any work affecting the structural tntegrtty of the building without the approval of the Building Owner or Building Owner's Representative. 9. Make all demolition clean and complete, in a manner suitable to accept new finishes and/or surfaces. Continuous surfaces shall be prepared to the nearest tntersectton. Refer to architectural floor plan, finish plan and details for the application of new materials. 10, Demolition shall be done without damage to existing conditions to remain, Where such damage occurs - patch, repair, or restore walls, floors, ceilings, etc, to match existing adjacent conditions. 11. Prior to beginning demolition, dust control barriers shall be constructed to prevent the spread of dust into the surrounding areas. 12, Contractor is responsible for the coordination of demolition items prior to the start of condition work, 13. Contractor shall identify, unused salvaged items shall be turned over such material to the Building Owner or stored in a designated area by the Building Owner. 14. Per the Building Owner's directions, materials identified to be relocated shall be cleaned and placed in storage until materials are ready to be reinstalled. If an Item is damaged during demolition or relocation, it shall be repaired or replaced with a new item approved by the Building Owner at no expense to the Building Owner, 15, Remove existing construction, items and finishes made obsolete by, or in conflict with new construction. Coordinate with Architectural floor plans and related details. 16. Contractor shall maintain CLEAR EXIT ROUTES during construction to ensure public safety per all code and jurisdiction having authority requirements. 17. Contractor shall remove dirt, dust, and debris on a dolly basis. 18. ALL roof mounted equipment must be installed in locations and manner designated by the Building Engineer. Building Owner MUST provide approvals for roof mounted equipment. 19. The Contractor shall remove all adhesive, plaster, and other surface materials from existing ceilings, floors, walls, and columns where scheduled to be exposed, such that it leaves a clean finished appearance. RELEASED FOR CONSTRUCTION ngstructureabove,Contractorshallremoveallexlsttnghangers,attachments, and other Terms fixed tothe ontrador shall return the existing suspended ceiling system to remain to like new condition. This shall include Subject to compliance with all regulations Il associated assemblies as well as replacement of damaged ceiling panels. of State and local Codes ire not used or do not meet current building codes shall be patched and repaired to match adjacent slab or City of Camel y, (� �1 �r,�1gRpi .r element(s) may be salvaged from areas outside of the Limits of the Project Scope and incorporated into he Building Owner uNess otherwise Indicated. DATE: 02/13/19 24. Existing Cover Plates at Floor Clean Outs (FC Os) shall be cleaned of adhesive, plaster, and other surface materials. Notify Architect of FCC conditions installed at planned Conference Rooms, Meeting Rooms, or Reception/Lobbies. FCOs to be accessible by Building Maintenance (carpet file provides concealed yet accessible condition). 25. Walls arountl vertical plumbing pipes with Clean Outs (COs) shall provide access to CO via escutcheon plate or access panel. Notify Architect of all locations prior to installation. 26, Remove existing power, telephone, and data lines and conduit not in use to meet local electrical code requirements, Contractor shall Identify power, telephone, data lines sewing other Building tenants that may ass thou hthe tenants ace. if an such lines are discovered, the contractor shall notify the P 9 9 P 9 P Architect in writing. Notify Landlord or Tenant of loose or abandoned telephone, data lines eta Coordinate with Landlord or Tenant for additional inshu<tion for removal. 27. Make safe a be ndoned electrical conduits. Remove willingback to source at electrical devices a be nd onedb wall removal or an other new construction. Y Y 28. Check with Building Owner prior to terminating abandoned plumbing at entry to tenant space per code and jurisdiction having authority requirements. 29. No structural or load -bearing construction shall be demolished or damaged as a result of this project unless specifically noted otherwise on the drawings. Protect all existing structural members during demolition and construction. Brace and shore construction as required for structural integrity of all assemblies at all times. The contractor shall verify in the field prior to demolition that all items noted to be deco d[shed are not structural. Contact Architect immediately if the contractors in the field suspect that an item noted for demdition appears to be structural or otherwise load -bearing. Beware of structural columns and or beams that may be concealed behind finishes that are noted for removal. Exercise caution when demolishing building finishes or partitions. The contractor is solely responsible for inadvertent damage to the building structural system. . Specifications - General 1. The make and model numbers specified are preferred or minimum standards. Other equipment may be considered, if proven equal through a Substitution Request, 2. Fixtures, equipment, finishes and materials shall be installed per the Manufacturer's specifications, recommendations and suggested Ind fact Ions per code and jurisdiction having authority requirements for proposed concl ns. 3. Contra der is responsible to verify the location of any structural elements embedded in the slab such as poll -tension cables and reinforcing and other items through x-ray imaging prior to any anchoring, drilling, floor coring, or cutting, of slab that exceeds 112" in depth from the bottom surface of the slab. Contact building management prior to imaging, 4. No suspended slab cores or slab cuts shall cut or penetrate any structural beam or joist. If any new slab core of slab cut is planned within 2 core diameters of 6" of any observable, or previous, or new slab core, or cut, even if patched the Cc nfrador shall provide a letter to the Architect from a structural engineer licensed in the project jurisdiction certifying that the new core or cut will not negatively impact the adequacy of the existing floor structure in any way. This applies to any holes left by demolition activities or discovered existing holes or cores, I. Specifications - Division 05 Metals I. Stud walls shall be secured to the concrete floor and ceiling or floor/roof consrudton above uNess otherwise indicated. Coordinate locations of expansion/co ntel joints with the Architect prior to installation for compliance with design intent. Provide expansion/control joints in the gypsum wall board walls over 30'-0" in length per the manufacturer's recommendations, 2. Stud or moso my walls extending from floor to roof/floor structure above must provide for a minimum of 2" vertical roof/floor deflection. 3. Provide metal or fire ratedo nt treated wood blocking in new antl existing walls for all wall supported items. At all existing walls, patch antl repair wall finish to match adjacent wall surface as required following the installation of blocking. 4. Joints and penetrations of fire rated assemblies to be sealed with approved U.L. listed "F" and ' systems. Submit product data and installation information prior to installation for Architect's approval. Label/identify fire rated partitions for future reference on each side of wall above ceiling, concealed from view. Note the UL assembly designation with 6" red stenciled letters. 5. Hinge side of finish door jamb in metal stud walls shall typically be located 6" from adjacent wall or meet accessibility standards for push and pull side of door unless otherwise indicated. 6. Metal gauge for partitions shall be 20 Gauge minimum unless noted or required otherwise by span limn wind loading and deflection requirements. Metal studs at fire rated partitions shall be 20 gauge minimum unless noted or required otherwise by span limn wind loading and deflection requirements. Contractor shall Install metal stud framing and all associated assemblies per recommendations of Clark Detrick Bug ding Systems or other manufacturer recommendations for conditions present on project. Contractor shall notify Architect on or to order and erection of stud framing regarding discrepancies with span limits, wind loading and deflection requirements. NI wall assemblies shall be braced laterally to deck as required for structural integrity of all assemblies. 7. Metal stud framing shall conform to ASTM C 754. I nstall 35/8" metal studs at maximum 16" O.C. u Aess otherwise noted. B. At partitions scheduled to receive ceramic tie - Metal studs shall be 3-5/8' 20 gauge minimum spaced at 16" on center maximum. If wall assembly does not extend to deck install lateral bracing each way at 32" O.C. minimum. provide substrate as per file manufacturer instructions. C. Specifications - Division 06 Wood and Plastics 1. Provide concealed blocking in wall as required to support millwork, coat hooks, toilet accessories,monitors, miscellaneous specialties specialty equipment, antl any other items requiring concealed support. Cencealed blocking shall be Fire Retardant Treated IFRT), or 10 gauge steel plate to comply with Building Type requirements. 2. Millwork to be Architectural Woodwork Institute (AWL CUSTOM GRADE, with proper substrate and filler panels provided. 3. Coordinate equipment openings and clearances required with openings and clearances provitletl in millwork. NOTE: ADA Height countertop must be maintained at Kitchen, Break Room, and Coffee Bar counters. Verify required depth and width of upper cabinets form crowave oven (if applicable) as provided by Owner, 4. Contractor is responsible for the field verification of all dimensions, rough openings, and job conditions prior to fabrication of any work shown or noted in the drawings. Contractor must coordinate with Architect arty discrepancies between what is shown or noted in these drawings and actual field vent led conditions. 5. Unless otherwise noted in drawings, countertops must be continuous. Countertops without backsplashes shall be scribed to the wall as noted on sections and details. 6. Anchor millwork to built-in blocking or directly attached to substrate. Secure to grounds, slra pping and blocking with counter -sunk concealed fasteners and blind nailing, as required for a complete installation. 7. Standing or conning him pieces to be plain sawn ho redwood Grade I lum ber to meet AWI requirements for Premium Grade, B. Iflailed millwork shall be plumb, level, time and straight with no distortions. Shim as requiretl using concealed shims. 9. The method of manufacturing, fabricating and installing millwork and equipment and its structural components defined in the Contract Documents is representative and indicates design intent only. If the materials, details or dimensional properties are at variance with the Contractors or manufacturers recommendations, alternate details will be considered for review when shop drawings are submitted in accordance with the Contract Documents, It shall be the responsibility of the Contractor to guarantee that the millwork and equipment will have the proper support, slabi lity and foull are performance. -. Specifications - Division 07 Thermal and Moisture Protection 1. Where the exterior envelope of the building is to be removed or modified, the Co nfrador shall maintain weathedight conditions throughout demolition and new cc nstmction activities. 2. Any penetrations through the existing roof must be completed by a subconfracor that has been approved by the Building Owner - to maintain any and all existing roof warranties. 3. Any damage to existing air barrier systems, waterproofing membranes, window sub sills, flashing, sealant, roofing membranes and thermal and moisture protection a t the building shell MUST be restored to "Fee new" condition to maintain water -tightness. N offy La ndlord and Architect in writing a nd locum ant all "as Found" damage and damage caused during the demolition process, All work associatetl with exterior roofing shall be performed by authorized contractor which maintains all associated existing warranty conditions. 4. Submit manufacturers data and literature for any and all products to be provided, where applicable. N. Specifications- Division 08 Doors antl Windows I. Doors, frames, antl hardware installed as per the manufacturer's instructions to provide a successful installation. 2. Provide "Building Stantlartl" doors antl frames, as per Building Rules", where applicable. If no manufacturers listed provide Marshfield doors antl Frameworks Type 1 frames. Glazing installed in doors and frames shall be tempered to corm ply with ASTMB C1048 & IBC Section 2406.4. 3. Prow de "Builtling Standard" door hardware, as per 'Bug ding Rules", where applicable or Grade 1 door hartlware. If no manufacturers listed provitle Schla ge or Falcon. Door hardware shall comply with American with Disabilities Act, National Fire Protection Association IN EPA) NFPA 80: Standard for Fire Doors and Windows. NFPA 101 Life Safety Code, NFPA 105 Smoke- and Draft -Control Door Assemblies. V ERI FY mortise vs. cylindrical hardware on all conditions. Panic hardware shall comply with 20151 BC section I010.1.I0. Panic Hardware called for shall be listed under ULIOC & UL305. 4. Glass Entry Systems shall be as per "Building Rules", where applicable. If no me nufadurer is listed contact building Property Manager Provide glazing tempered as per ASTM C1048. Special attention shall be given to panic devices and card readers at all -glass entry systems, to comply with all Local and State codes. 5. Before final completion, adjust hartlware so that doors operate property. Test antl atljust hardware for quiet, smooth Reaction, free of sticking, binding, or rattling. Adjust closers for proper, smooth operation per accesstbtltty, guildel Ines. All Tenant Entry doors to receive a door closer and dead bolt: unless tenant will be Installing a security card reader system then only a door closer is required. 6. Verify keying requirements with Tenant. Furnish 2 keys per lock with a maximum of 8 keys per keyed alike set. At final completion, property tag and identify keys and deliver to Tenant. Keying requirements shall comply with applicable Building Rules & Regulations. 7. Install tempered glass with no exposed tong marks or me nufadurer's labels. Glass shall have chamfered and polished edges. Cut prior to tend pertng to maintain tolerance / joints plus or minus III6". Provide required accessories Including but not limited to glen ng tape, neoprene setting blocks, neoprene spacer shims and silicone apple rd. Install per GANA stantlartls for the type of system specified antl IBC Section 2406, Remove all non -permanent labels, Floor to ceiling tempered glazing to have "anti -walk Lou decal mounted between 24" and 60" A.F.F. V. Specifications - Division 09 General 1. Finishes are to be installed per manufacturers recommended methods and tnstuctons, using suggested products and materials to provide a successful Installation for proposed conditions. 2. The Contractor shall advise the Architect of locations of changes in dye lots, batches or similar color shifts. 3. Where dissimilar floormaterials meet, they shall do so under the centedtne of a door unless otherwise Indicated. if a change of material or elevation would cause exposed unfinished surfaces, a transition strip of suitable malenal shall be installed, 4. Contractor shall fumtsh a minimum of three (3) 12" x 12" square samples of each scheduled ftntsh for review by the Architect. The Architect shall retain two (2) samples of finishes for record, and return a minimum of one (1) sample to Contractor. Finish materials ordered or installed without a reviewed submittal are done so at the Contractor's risk. 5. Interior finishes in rooms and chapped spaces shall have a flame spread classification of III (76-200 tunnel test) and a smoke density of no greater than 450 (Class C). Finishes in corridors or exit access enclosures shall comply with code required limits based upon building type, user group and presence of sprinkler systems. 6. Materials exposed within plenum spaces designed to allow air movement and function as pad of the air distribution system are required to be noncombustible or shall have a flame spread Index less than 25 and a smoke developed Index less than 50 when tested In accordance with ASTM E 84, All cam bustible materials located within these plenum spaces shall be enclosed to noncombustible mated at (5/8" gypsum wall board) unless otherwise Indicated. Refer to mechanical drawings for air distribution system design and details. D. Specifications - Division 09 Gypsum Board I. Gypsum board tnslallatton shall conform to ASTM C840, the recomm endattons of the Gypsum Association, the specific recommendations of the me nufadurer, and the requirements of the UL Fire Resistance Directory (at fire rated padttons). At gypsum board to be 518" thick unless otherwise noted. 2. Installation of metal framing for intenor gypsum board shall conform to ASTM C754, 3. Provide comer beads at drywall exterior comers not receiving millwork wraps. 4. Provide cementitious backer board in lieu of gypsum board to wet areas. 5. At areas where existing partitions are indicated to remain - repair and prepare existing gypsum board surface to accept new finish. Quality of repaired and prepared surface of existing partition shall be equal to that of newly constructed partitions. 6. Ftre+ated Partitions FtrsLrated partitions shall conform to UL design number Indicated. Refer to UL Fire Resistance Directory- Volume I (latest edition) for additional tnfonmatton. 7. Fire+ated Partitions: Mechanical, Electrical, and Plumbing penetrations in fire -rated partitions shall be sealed at their perimeter with approved fire+ated sealant. 8. Sound -rated Partitions: Sound -rated partitions shall conform to ASTM E497, Standard Practice for Installing Sound Isolating Lightweight Partitions. 9. Sound -rated Partitions: Mechanical, Electrical, and Plumbing penetrations in sound -rated partitions shall be sealed of their perimeter with approved fire+ated sealant. 10. Provide bracing to structure above at tloors located in ceiling height partitions, I I, Gypsum board shall be Installed and finished to within 1 /4' of floor slab, 12. Gypsum board panel joints and joints to existing construction shall be taped, bedded in joint compound, and sanded smooth with no visible joints. Edgetrtm, comer beads, and pre formed reveals shall be bedded injoini compound and sanded smooth with no visiblejoints. Provide proper backing for all reveals as recommended bYmanufacturer. 13. In areas to have ceilings open to structure, and where existing gypsum board walls and plaster bulkheads and columns are scheduled to remain, extend and finish gypsum board or plaster to underside of structure. 14, Provide sliphack assemblies at the to of all tleck-het height aditions to allow for 2" simciural deflection, P 9 P 15. Provide level five (5) Gypsum Board finish behind specialty wall finishes as recommended by Manufacturer's installation guidelines. P. Specifications - Division 09 ire 1. Tile installation, rout and seder recommended the manufacturer shall be per manufacturer's recommended methods andinstruction, using 9 P 9 manufacturers recommended representative materials to understood desgnInt Installationproposedojectconditions,denufying is shall apprduothe materials contained In to P P manufacturer's representative outlining the understood design intent specific to this project and identifying the appropriate materials contained in the submittal. 2. Tile shall be manufactured in compliance with Standard Grade Requirements of ANSI AT 37.1 3. Installation of file shall be in compliance with requirements set forth in Handbook for Ceramic Tie Installation: Room, Cement Mortar Bert -TCA F121; Walls, Thinset Portland Cement Mortar- TCA W 243: Shower Walls, Thinset latex Portland Cement Mortar- TCA W244/9415: Shower Receptors, Thinset latex Portland Cement Mortar- TCA 3415; Expansion Joints, TCA EJ771. 4. Drain covers to be flush with top of file surface. Adjust drain body or provide spacer and longer screws. 5. Provide extra materials equal to 2%of each type, color, and size of file from some production run as installed materials. Package extra materials and legibly label each package with name of manufacturer, materials name, pattern, color, size, and installation area. 6. Provide appropriate trim tiles to match field file at base conditions, inside corners, outside corners, and wainscot caps. 7. Provide Solid Surface (Silestone) thresholds, shaped to provide comfortable transition between ceramic file or other floor finishes, profile to be shaped to meet ADA requirements. Provide WHITE, honed finish with ASTM C2421 Abrasive Resistance (12 He Minimum), S. Thinset mortar shall comply with ANSI AT 18.4. Cement molar shall comply with ANSI A108.1 A. Grout shall comply with ANSI AT 18.6. Place mortar on properly prepared substrate, as per manufacturers Instruction. Follow Instructions for protection, curing, sealing, and cleaning of file and grout. 9. At tiled showers, provide field constructed shower liner with appropriate waterproofing extended up adjacent walls, equal to SCHLUTER SYSTEMS KERDI system. Install as per manufacturer's instructions. Special care is to be taken around shower drain, inside comers, and all penetrations through the waterproofing system, 10. Refer to Finish Legend for scheduled and specified products. Q. Specifications - Division 09 Acoustical Ceilings I. Installation to be as per manufacturer's recommended methods and tnstmdton, using recommended products and materials to provide a successful Installation. 2. At existing ceilings: replace components that are discolored or damaged in any way, in a manner that results in grid system showing no evidence of replacement work. 3. Provide "Builtling Stance rd" acoustical ceilings as per " Bug ding Rules", where applicable, uNess otherwise noted. If no manufacturer builtling stantlartls are listed, provid a Armstrong DUN E It 1772 with exposed Tee Grid. Match C ailing Grid and ire in l Ike kind per room. No exceptions. R. Specifications - Division 09 Resilient Flooring I. Installation to be as per manufacturer's recommended methods and instruction, using recommended products and materials to provide a successful Installation. Roaring and any top coatings shall be slip resistant per TAS 302.1. 2. Contractor responsible for preparation and construction required. 3. Refer to Finish Legend for schedul art and specified products. 4. Desig In intent is for flooring transitions to match color of adjacent floor surface. Su emit sand pies to Architect for an proval. 5. Provide resilient cove base at resilient flooring locations, Contractor shall use inside and outside comers and end slops for all areas specified Use roll goods any. No seam shall occur within 6" of an outside corner. 6. No seams of resilient flooring shall occur within 6'-0" of any water supply or sink i. Specifications - Division 09 Carpet I. Installation to be as per manufacturer's recommended methods and Instruction, using recommended products and materials to provide a successful Installation. 2. Refer to Finish Legend for scheduled and specified products. 3. Provide resilient base at carpet flooring locations. C ontrador s hall use inside and outside comers a nil end stops for all areas specified. Use roll goods only. No seam shall occur within 6" of an outside comer. 4. Design intent is for flooring transitions to match color of adjacent floor surface. Submit samples to Architect for approval. 5. Provide adequate protection of flooring tluring construction. Clean as per manufacturers instructions. T. Specifications- Division 09 Stretched Fabric Panel Systems 1. Installation to be as per me nufadurer's recommended methods and instruction, using recommended products and materials to provide a successful Installation. 2. Refer to Finish Legend for scheduled and specified products. U. Specifications - Division 09 Painting 1. Installation to be as per me nufaduar's recommended methods and instruction, using recommended products and materials to provide a successful Installation. 2. Refer to Finish Legend for scheduled and specified products. 3. In ceiling areas scheduled to be exposed to the existing structure, items installed above the height of the light fixtures, including (but not limited to) ductwork, sprinkler system, conduit, and slmclural slab, shall be pointed with drywall paint colored according to the finishes schedule, If no specific finish is listed the Contractor shall include a dark gray, matte finish in pricing and coordinate final color with the Architect odor to installation. V. Specifications - Division 10 Specialties I. O parable partitions to be as desig noted in a anitedural drawings and installed as per the manufacturer's instructions, where appltcabl e. if structural support is not included in plans, Contractor to allow for required structure to support specified pa dition. 2. Provide code minimum required signage, to match Building Standard. Where no existing Building Stantlartl, a compliance with Building Standard is not required, assume fully ADA compliant sig hedge as manufactured by Bed Signage Systems IF h. if 800.235.2378). W. S Pecifications: Division 11 Equipment I. Projection Screens to be as designated in architectural drawings antl install eel as per the manufacturers instructions antl details provided. Coordinate Installation with ceiling grid, sprinkler piping, eledrical, mechanical, and all other trades with work in the area. 2. Contractor shall verify requirements for"extra ore p' with ceiling heights and Tenant AV requirements. K. Specifications: Division 12 Furnishings 1. Verify with Landlord or Building Representative If window bllnds are required. If required Contractor to verify existing and provide window blinds at all exterior windows. 2. Verify with Landlord or Building Representative if shades are required, If allowed Co nfrador to provide window shades as desig noted in architectural drawings. Shades to be as specified in Miscellaneous Equipment Schedule and are to be installed as per the me nufadurer's instructions. Coordinate power and switching requirements with electrical drawings, when provided. Y. Specifications: Division 22 & 23 Mechanical 1. Refer to Mechanical Drawings ( WHEN PROVIDED) for complete mechanical specifications. 2. If Mechanical and Plumbing Consultant plains aren't [nine set of drawings, the ARCHITECTURAL drawings that reference plumbing and mechanical devices or equipment are intended to provide general information re: the placement of these items. It is the responsibility, of the mechanical and plumbing subcontractors to provide a complete working installation in accordance with all State and Local applicable codes. 3. Coordinate placement of HVAC diffusers, return air grilles, and thermostats with Architect prior to installation. 4. Plumbing fixtures shall comply with the Indiana Bull ding Code, ICC/ANSI 117J - 2003, the Americans with Disabilities Act accessibility guidelines (ADAG 2010) and all requirements set forth by jurisdictions having authority, 5. Faucets shall comply with Accessibility Standards and ADAAG requirements. Lever -operated, push -type and electronically controlled mechanisms are acceptable unless otherwise indicated. 6. Hot water and drain pipes under lavatories and accessible sinks shall be installed or otherwise configured to voted against contact. 7. Furnish and install plumbing fall as shown. The plumbing fixtures and toilet seats shall be white unless otherwise indicated. Exposed piping and supply fittings shall be chrome elated uNass otherwise indicated. All wall penetrations shall be fitted with chromium plated escutcheons. Escutcheons shall be fixed to the wall in a bed of sealant or secured by mechanical method. B. Verify and provide all plumbing required for all equipment for a complete working installation. Verify exact locations. 9. Clean, heat and test piping systems in accordance with local codes and building standards. 10. Perform or balancing tests and provide a complete report for all devices and air handling units affecting the scope of work for this Project. The report shall be reviewed by the MEP engineer of Record and by the Landlord, and all cefictenctes corrected. Defictenctes outside the scope of work of the Project shall be fully tlocumentetl antl brought to the attention of the Landlord for review antl correction, 7. Specifications: Division 26 Bectrical 1. Refer to Electrical Drawings (WHEN PROVIDED) for corn plate electrical specifications. 2. If Electrical Consultant plans arenf in the set of drawings, the ARCHITECTURAL drawings that reference electrical devices or equipment are Intended to provide general information re: the placement of these items. It is the responsibility of the eledrical subcontractor to provide a complete working Installation In accordance with all State and Local applicable codes 3. Contractor to verify and coordinate placement of lighting with other trades p1ruclural, HVAC, electrical, plumbing, sprinkler, etc.). Consult manufacturer if alternate housings are required. 4. Verify and provide power and data connections for equipment for a complete working Installation. Verify exact locations. 5. Provide Ground Fault Circuit Interrupt (GFCI) electrical outlets at areas adjacent to sinks or wet areas as required by code and jurisdiction having authority requirements. 6. Verify fixture option with Architect prior to installatto n. Substitutions shall be approved by Architect prior to acceptance of bides and Installation. 7. Contractor shall verify with FgMing manufacturer any special requirements (i.e. venting, positioning, etc.) of scheduled fixture types for all Installattons. & Submit fixture cut sheets to Architect fa review and approval. 9. Provide exit, night antl emergency wall pack lights as required by cod and jurisdiction having authority requirements. Coordinate placement with Building Rules, Architect and Engineer prior to Installation. 10. AT MI NOR RENOVATION INSTALLATIONS: Outlets and switches to match extsttng devices Installed on site. VERIFY and provide devices called out to Building Standards, where applicable. 11. AT MAJOR RENOVATION INSTALLATIONS: Replace any exlsttng outlets and switches with DECORA PLUS to WHITE color. VERIFY and provide devices called out to Building Standards, where applicable, 12. AT NEW CONSTRUCTION/FIRST GENERATION INSTALLATIONS: Outlets and switches to be DECORA PLUS in WHITE color. VERIFY and provide devices called out in Building Standards, where applicable. 13. Verify color of specialty receptacles or devices with Architect during submittals. 14. Where applicable, Contractor shall provide electrical subcontractor with complete architectural and engineering drawings. The Contractor shall notify Architect and Engineer of any discrepancies or conflicts prior to bid date for resolution. 15. Floor poke-thm devices in hard surface floors shall be provided with a completely flush closure plate. Floor poke-thru devices in carpet floor shall have an ADA compliant bezel him unless noted otherwise. At devices shall carry an appropriate UL listed fire rating and be installed per UL approved details for penetrations through fire rated assemblies. 16, Devices shall be provided WITHOUT visible manufacturer logos or names, 17, In ceiling areas scheduled to be exposed to the existing structure, electrical wiring shall be Installed in rigid metal conduit tight to structure. Rigid conduit shall run parallel or perpendicular to primary building structure. 18. In ceiling areas scheduled to be exposed to the existing structure, data/telecom/AV cabling shall be neatly bundled and supported tight to structure. Any additional slack shall be coaled and located within concealed calling areas. 19. The Architect shall approve all electrical, lighting and cabling layouts to calling areas scheduled to be exposed to the existing structure. 3 :ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317,843.5979 Fax 317.843.5975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Tel 512 977,0520 Fax 512,977,0384 o arsondesign.com � " C E MIDO O o O .i Q V O i p � Z i O ,^ U V a) MC3 a) i C = .a U > C) � C 6 � E ^^,, W C O 0 01 ell O iiiiiiiiiiin w vf I.L _ O O ii L O U L Lw1min w�mill Z U t ZO Il N .� W ^^,, X ND f \\ LLJ STAMP: 01.11.19 ISSUE: 0 Review Set 01.11.19 DRAWING TITLE: Project Standards JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A021 COPYRIGiff N 5 CA60N DESIGN ACOOR5 GENERAL NOTES - DEMOLITION RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes e City of Camel (� �1VTl��lmnrJAaAz+L DATE: \ 02/13/19 DEMOLITION PLAN 1/8._1.-0 A PLAN A. REFER TO GENERAL NOTES AND REFER ENCESPEC I FICATIONS IN AO SERIES SHEETS FOR SPECIFICATIONS REGARDING DEMOLIti ON AND EXISTING CONDITIONS. B. Dashed lines Indicate existing items to be removed unless otherwise Indicated. Contractor shall be responsible fa the off site disposal of all demolition items. C. Following above -ceiling demolition activity, the Contractor shall return the existing suspendeded ceiling system to remain to its original condition if applicable. 1b1s shall Include repair to the ceiling grid and replacement of damaged ceiling tiles if applicable. D. Refer to Demolition Plan for additional notes and demoltaoninfoamataon. E. Dimensions shown for existing construction to be demolished are approximate and are Intended to give a general scope of work to be removed a temporarily removed to accomodate new construction. Coordanatedemolataonwakwathdesagnantentof new construction to provide adequate area for this work. F. If applicable, refer to structural, mechanical, electrical, and plumbing documents for additional demolition information. G. Remove and reinstall all equipment a construction on walls receiving new finishes. Coordinate with architectural finish plan and/or schedule. H. Contractor shall verify any ductwork, piping orconduit penetrations through existing wall construction. If penetrations occur where items are to be removed, opening shall be filled flush with the same material as the surrounding wall. The contractor shall maintain the integrity of rated wall construction. J. the Contractor shall verify floor elevations on either side of walls being removed. Floors shall be patched and filled with leveling compound where required fora level floor contlition. K. Coniracershall remove existing floor finishes as palpated bras required for new construction work. Remove floor finish adhesive and prepare slab as required to receive new finish. DEMOLITION LEGEND Refer to general demolition notes for ad bitionaI information, Indicates existing partitions to be removed. ndicafes existing partitions to remain. ==-z— Dashed lines indicate portion of existing partition to be removed for future construction. See floor plan for required usage. Indicates existing door/frame/hardware to be wwwww�a II removed (or door& sidelight if indicated as such). Note: Door systems may be re -used. Coordinate with ' Building Owner possible door re-uae. Use only best condition doors for this purpose. Refer to floor plans fa possible new location. Indicates existing door/frame/hardware to remain, _ Indicates existing light future to be removed. Note: Fixture may be re -used. Refer to reflected ceiling plan L ---- J for possible new location use only best condition fixtures fa this purpose. Futures must be cleaned and inspected pnor to re -installation. Indicates existing diffuser(s) to be removed. ¢_y Coordinate with HVACcontractor far possible re- use and/or locations of required new HVAC equipment. ----'i----i---- Indicates existing 2X4 ceiling grid to be removed. t____a____ 1---_ I Indicates area not icontract. Refer to floor plans for additional information. O KEYED NOTES - DEMOLITION DO Remove existing door, frame and hardware. Salvage for re -use or inventory. D2 Remove existing wall. Repair and patch to receive new finishes. D3 Remove countertop, backsplash, sinkand mayors. Plumbing to be relocated for sinks per Sheet A211 D4 Remove portion of wall for new door. D5 Remove panted-overwallcovenng. Repairand patch to receive new finishes. D6 Remove floor tile, file base and wall tile. Repair and patch to receive new finishes. D7 Remove hand dryers. Salvage forreuse. D8 Remove foal efs/urinals, partitions antl accessories. D9 Remove wall mounted shelf and minor. Salvage for reuse. DILI Remove all wall -mounted equipment fire alarm box, mailbox, Knox Box, phone and cardreader), and salvage for resuse. Coordinate with Owner to ensure consistent monitoring 1lroughout renovation. Dl1 Remove existing wall<overang and vinyl base, repair and patch as required to receive new finishes. Remove existing corner guards and salvage for reinstallation an some locations. D12 Remove existing wallcoverang,flooring, wall base and comerguords. Repair and patch to receive new finishes. D13 Remove existing floating to this point. D14 Remove existing casework, counterl and sink. Cap plumbing. D15 Remove existing flooring and wall base. Repair and patch to receive new finishes. .3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317.843.5975 SOUTHWEST 12301 Research Blvd Bldg IV - Suite 130 Austin, TX 78759 Tel 512.977.0520 Fax 512.977.0384 - arsondesign.com L ON ma co 0 O._ •O Mill V i ? O O E W =0 W a0 C .0 U E A� O 0 ° N O _W U.0 O =Qeiiiiiii, Z U -C Z t/f N Q X o 0 iW LO STAMP: `"OTv1yM\CH urUiii ST�( ° xxxpi E 9 v F —' 'O / DIA O Hill n �Txxxxx` 01.11.19 ISSUE: A Review Set 01.11.19 DRAWING TITLE: Demolition Plan JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A201 COPYRIGM'NR CAa0N DESIGNA GATES GENERAL NOTES - DEMOLITION RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes e City of Camel (� �1VTl�llmnrJAa�+L DATE: \ 02/13/19 1 DEMOLITION RCP PLAN 1/S'=1-0 PLAN A. REFER TO GENERAL NOTES AND REFERENCE SPECIFICATIONS IN AO SERIES SHEETS FOR SPECIFICATIONS REGARDING DEMOLITION AND EXISTING CONDITIONS. B. Dashed lines indicate existing items to be removed unless otherwise indicated. Contractor shall be responsible for the off site disposal of all demolition items. C. Following above -ceiling demolition activity, the Contra ctor sha ll return the existing suspendeded ceiling system to remain to its original condition if applicable. This shall Include repair to the ceiling grid and replacement of damaged ceiling tiles if applicable. D. Refer to Demolition Plan for additional notes and demoltion information. E. Dimensions shown for existing construction to be demolished are approximate and are Intended to give a general scope of work to be removed or temporarily removed to accomodate new construction. Coordinate demolition work with design intent of new construction to provide adequate area for this work. F. If applicable, referto structural, mechanical, electrical, and plumbing documents for additional demolition information. G. Remove and reinstall all equipment or construction on walls receiving new finishes. Coordinate with architectural finish plan and/or schedule. H. Contractor shall verify any ductwork, piping or conduit penetrations through existing wall construction. If penetrations occur where items are to be removed, opening shall be filled flush with the some material as the surrounding wall. The contractor shall maintain the integrity of rated wall construction. J. The Contractor sha ll verify floor elevations on either side of wo Its being removed. Floors shall be patched and filled with leveling compound where required for a Ievel floor condition. K. Contractor shall remove existing floor finishes as indicated or as required for new construction work. Remove floor finish adhesive and prepare slab as required to receive new finish. DEMOLITION RCP LEGEND Note: All Items shown wlI be existing to remain unless noted otherwise. er &isting Building Standard it l connoted exit l ight to remain. Solid area denotes direction of faceplate. Existing Building Standard 2x2 fluorescent light El fixture to remain. O Existing Recessed Downright Fixture to remain. 0 Existing Recessed Downright Fixture to remain. Existing Building Standard 2x4 fluorescent light fixture to remain. Indicates existing light fixture to be removed. Note: Fixture may be reused. Refer to reflected ceiling plan O for possible new location use only best condition ----i fixtures for this purpose. Futures must be cleaned and inspected prior to re -installation. F-� Indicates existing diffuser(5) to be removed. oi Coordinate with HVAC contractor for possible re- use and/or locations of required new HVAC "--"' equipment. Indicates existing 2X4 ceiling grid to be removed. _r _Y Indicates existing ceiling grid to be remain. ■ Indicates area not in contract. Refer to floor plans for additional information. KEYED NOTES - DEMOLITION RCP DIRT aiidIng suspended ceiling grid to remain. Repair and patch grid as necessary to receive new ceiling tile. DR2 Remove ceiling tiles and 2x4 light fixtures. DR3 Repair and patch where Lektrievers are removed. .3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317,843,5975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Tel S12977.0520 Fax 512.977.0384 -orsondesign.com L Oma M CD O p Z O O E 0 N 70 N U a0 C .2) U E A� W O 0 L N N O 'vf ° O � C 0 mill U z Vf N Q 1= i W L0 STAMP: ``xOTy1TM\CH ut4iii �( ° yxvpi STE 9 v F -' 'O� 7 DIA O ,Ax 4RuHI- n oTxxxxx` 01.11.19 ISSUE: /\. Review Set 01.11.19 DRAWING TITLE: Demolition RCP Plan JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A202 coPreiGM D15 CAaON DESIGN ASSOaRB Sound soft insulation above ceiling. Extend 2'-0' min. each side of wall. Suspended acoustical ceiling file - refer to room finish schedule. Spacer as required, fyp Continuous acoustical to pe, fyp USG or Eq. 200E Metal T' Trim continuous, floated -in, typical. Metal fop track channel, continuous, install fasteners at 2'-0' o.c., max Suspended acoustical ceiling file - referto room finish schedule. Spaceras required, fyp Continuous acoustical tape, typ USG or Eq. 200E Metal 1' Trim continuous, floated -in, typical. Metal fop track channel, continuous, install fasteners at 2'-0" o.c., max Refer to wal l type Refer to wall type schedule for wall schedule for wall GI construction. G construction. Framed to ceiling grid. Framed to ceiling Insulate ceiling 2-0' (mina grid each side of wall TOP OF WALL CONDITION DETAILS R-1 v RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes CiityGF Carneed �VT�t�D*�41WML DATE: \ 02/13/19 1 CONSTRUCTION FLOOR PLAN SCHEDULE - WALL TYPES Wall Construction Top of Wall Construction Wall type Sbd Ske Insalalbn Fire Rating U.L. or G.A. R Description Code Description M3 U- 3 5/9 No -- Metal studs ® 16" O.C. with (I) layer 5/9 gypsum board each side G Framed to ceiling grid M3S 0- 3 519 Yes Metal studs B 16" O.C. with (1) layer 5/8" gypsum board each side GI Framed to ceiling grid, Insulate ceiling 2'-0" (min.) each side of wall 13 PLAN GENERAL NOTES - CONSTRUCTION A. REFER TO GENERAL NOTES AND REFERENCE SPECIFICATONS ON SHEETA001&A021 FOR SPECIFICATONS REGARDING NEW CONSTRUCTION AND FINISHES. B. Referto Reflected Ceiling Plans Sheet A221 for ceiling heights unless otherwise indicated. C. Referto Electrical Location Plans Sheet A231 far atltlitional Miscellaneous Specialties Equipment items that may not be indicated on this sheet. D. Refer to Finish Plan and Finish Notes Sheet A241 for wall base type and ceiling types. E. Refer to top of wall condition details, this sheet, for additional information regarding wall heights and termination. F. Provide air -tight acoustical and/or fire -rated sealant around perimeter of all wall types with acoustical insulation. G. All joints and penetrations of fire rated assemblies to be sealed with approved U.L. listed "F' antl'T'systems, Submit product data and installation information prior io installation for Architects approval. Label/identify fire rated pavilions for future reference on each side of wall above ceiling, concealed from view. Note the UL assembly designation with 6" red stenciled letters H. Dimensions are taken from the face of masonry walls, column centerlines, finish face of existing walls and/or stud face of new walls unless otherwise indicated. J. Verify all critical dimensions within and/or related to the existing building. Dimensions and conditions indicated were determined by visual survey and/or information from existing drawings. K. +/- Dimension is equal to verify in field L. Plans are not to be scaled for finish or wall information. Contraclorto contact Architect for any questions or clarifications on plan dimensions. M. Walls behind and directly adjacent to all toilet room fixtures (lavatories, toilets and urinals) shall have a smooth, hard, non-absorbant surface. Partitions in these areas shall be constructed with cement board or moisture resistant gypsum board in lieu of gypsum wall board and/or finished with an epoxy paint, Toilet room accessories (grab bars, toilet paper dispensers, eic.) in these areas shall be installed and sealed to prevent moisture penetration. N. Provide tile backer board at locations to receive wall tile. Refer to the Finish Plan sheet A241 for locations, P. Contractor shall verify the size and location of all required mechanical pads and wall openings. PLAN LEGEND Existing Shell of Building Structure Existing Partition to Type Remain 2=2 112" Stud Sae 3=35/8"Stud Sae New Partition - Non -Insulated ua 6=6'Sfud Ste New Partition Insulated (See Standard Top of Wall Condition Details) Demising Padifion G=Gdd Coordinate level of finish outside GI=Gdd / Insulation Tenant space with Owner +6=+6 Above Grid D=Framed to Deck Above New Fire Rated Partition, R=Fire Rated OI Hour Fire Rated Construction Key Note ® New Fire Rated Partition, 2 Hour Fire Rated O�Miscellaneous Specialty Item ■ andEquipmentrefer to Indicates area not in Miscellaneous Specialties and contract. Refer to Equipment Schedule floor plans for additional information. 101 Door- Refer to Door Schedule KEYED NOTES - CONSTRUCTION Cl Infill wall to match adjacent construction where wall was removed. C2 Install salvaged door, frame and hardware. C3 Install new toilets antl toilet partitions in Women Restroom. Install new toilets, toilet partitions, urinals and urinal screens in Men's Reslroom. C4 Install salvaged shelf. C5 Install owner provided full length mirror. C6 Mount (3) satin stainless steel hooks of 5-0" AFF antl mount (1) at 3-6" AFF. Space hooks 8" apad C7 Install new 2'-6" w x 3'-0" h access panel at 1-3 AFF. AFF. Paint to match wall. C8 Install new bond dryer of ADA height. Refer to Elevation Ion Sheet A501 for details. C9 Install powered door openers at 3'-0' AFF io center, C10 Install owner provided locked dropbox. CII Install wall -mounted telephone. Coordinate with owner. C12 See Key Note E4 on sheet A231 for reinstallation information. C13 Reinstall corner guards salvaged during demolition in former locations. .3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317,843,5975 SOUTHWEST 12301 Research Blvd Bldg IV - Suite 130 Austin, TX 78759 Tel 512977.0520 Fax 512.977.0384 orsondesign.com L L ma O._ wO will Q O ,C O O (, E W (D 00 C IX .� U > O O _W4. � wvf U. =0 C O J U 7 Vf N Q i W STAMP: ytyM\CH uf4iii �( ° yyxpi STE 9 v F —' xxx 4RuHI11110 n �TVNvvv` 01.11.19 ISSUE: /� Review Set 01.11.19 DRAWING TITLE: Construction Floor Plan JOB NO. 11840930 DATE: 01.11.19 SHEET NUMBER: A211 GMIDI5 GRON DESIGN AC Q iES