HomeMy WebLinkAboutCLAY CORNER 4 - CC004 (AS DESIGNED)IECC 2009 Performance Compliance
Property
1571 LASH ST
CARMEL, IN 46032
CCO04 (AS DESIGNED)
CLAY CORNER 4
Organization
TSI Energy Solutions
Matthew Timmons
Builder
LENNAR HOMES
Design
Heating
Cooling
Water Heating
SubTotal - Used to determine compliance
Lights & Appliances
Onsite generation
Total
Inspection Status
Results are projected
Annual Energy Cost
IECC 2009 Performance
$1,702
$264
$380
$2,346
$909
$0
$3,254
Requirements
C4405.3
Performance -based compliance passes by 0.4%
402.4.1.2
Air Leakage Testing
402.5
Area -weighted average fenestration SHGC
402.5
Area -weighted average fenestration U-Factor
40322
Duct. Testing
C4
Mandatory Checklist
Mandatory code requirements that are not
checked by Ekotrope must be met.
R4052
Duct Insulation
CTSI
Energy Solutions
As Designed
51,730
5228
5380
$2,337
S909
SO
$3,246
Air sealing is 5.DD ACH at 5D Pa. It must not exceed 7.DD ACH at 50 Pa.
Design exceeds requirements for IECC 2009 Performance compliance by 0.4%.
As a 3rd party extension of the code jurisdiction utilizing these reports, I certify that this energy code compliance document has been created in accordance with the requirements of
Chapter 4 of the adopted International Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certify that the building design described herein is consistent with
the building plans, specifications, and other calculations submitted with the permit application. If rating is Confirmed, I certify that the address referenced above has been
inspected/tested and that the mandatory provisions of the IECC have been installed to meet or exceed the intent of the IECC orwill be verified as such by another party.
Name: Matthew Timmons
Organization: TSI Energy Solutions
Signature:
Date:
217119 at 9:04 AM
Ekotrope RATER - Version 3.1.0.2105
IECC 2009 Performance compliance results calculated usinq Ekotropes energy algorithm; which is a RESNET Accredited HERS Ratinq Tool.
1.571 LASH ST
CARMEL, IN 46032
LENNAR HOMES
Ceiling Attic, R-38
Above Grade Walls R-16
Foundation Walls R-11
Framed Floor NIA
Slab R-0.0 Perimeter, R-0.0 Under
Infiltration 5 ACH50
Window U-Value: 0.33, SHGC: 0.28
Building Features
Duct Supply R-10.0, Return R-10.0
Duct Leakage to Outside 260.0 CFM @ 25Pa
Total Duct Leakage 416.0 CFM @ 25Pa
Heating Furnace • Natural Gas • 95.5 AFUE
Cooling Air Conditioner • Electric • 13 SEER
Water Heating Water Heater • Electric • 0.93 Energy Factor
As a 3rd party extension of the code jurisdiction utilizing these reports, I certify that this energy code compliance document has been created in accordance with the requirements of
Chapter 4 of the adopted International Energy Conservation Code based on Climate Zone 5. It rating is Projected, I certify that the building design described herein is consistent with the
building plans, specifications. and other calculations submitted with the permit application. If rating is Confirmed, I certify that the address referenced above has been inspected/tested and
that the mandatory provisions of the I ECC have been installed to meet or exceed the intent of the IECC or will be verified as such by another party.
Name: Matthew Timmons Signature:
Organization: TSI Energy Solutions
Date: 217f19 at 9:04 AM
Ekotrope RATER - Version 3.1.0.2105
No version of this software has been reviewed or approved by ICC or its affiliates.
The 2009 International Energy Conservation Code is a registered trademark of the International Code Council. Inc. ('ICC').
This software is a RESIN ETAccredited HERS Rating Tool.
Energy Code Inspection Checklist
Property
1571 LASH ST
CARMEL, IN 46032
CC004 (AS DESIGNED)
CLAY CORNER 4
General Building Information
Conditioned Area (sq ft)
Conditioned Volume (cubic ft)
Insulated Shell Area (sq ft)
Organization
TSI Energy Solutions
Matthew Timmons
Builder
LENNAR HOMES
5,213
45,982
9,580
Inspection Status
Results are projected
C-M,
Energy Solutions
The building energy model in Ekotrope reflects the building assemblies and energy features listed below. Sometimes energy
features will change in the field from what has been modeled. The inspection process should identity any changes and ensure
that the home continues to meet the applicable energy code.
Slab
] Name: BSMT (2,139 s.f.)
R-0 perimeter insulation, R-0 under slab insulation.
Framed Floor
None Present
Foundation Wall
] Name: CONDIAMB (Exterior Perimeter [ft]: 197, Height Above Grade [ft]: 1, Depth Below Grade [ft]: 8)
R: 11.00
Feet from top of wall to top of insulation: 0, Feet from top of wall to bottom of insulation: 4
]l Name: CONDIGAR (Exterior Perimeter [ft]: 20, Height Above Grade [ft]: 1, Depth Below Grade [ft]: 8)
R: 11.00
Feet from top of wall to top of insulation: 0, Feet from top of wall to bottom of insulation: 4
Alcove Grade Wall
El Name: COND/AMB 2X4 (2,413 s.f.)
R-3 continuous insulation, R-13 cavity insulation
Insulation Grade: I
El Name: CONDIGAR (180 s.f.)
R-0 continuous insulation, R-13 cavity insulation
Insulation Grade: I
]l Name: CONDfATTIC (408 s.f.)
R-3 continuous insulation, R-13 cavity insulation
Insulation Grade: I
Energy Code Inspection Checklist
Property
1571 LASH ST
CARMEL, IN 46032
CCO04 (AS DESIGNED)
CLAY CORNER 4
Rim Joist
Name: RIM CONDIAMB (197 s.f.)
R: 13.575
Organization
TSI Energy Solutions
Matthew Timmons
Builder
LENNAR HOMES
Name: BAND CONDIAMB (67 s.f.)
R: 13.575
Name: CONDIGAR (26 s.f.)
R: 10.876
Name: CONDIATTIC (64 s.f.)
R: 13.575
Roof
El Name: SECOND (2,139 s.f.)
R-27.55 continuous insulation, R-10.15 cavity insulation
Insulation Grade: I
Opaque Door
Name: FRONT (24 s.f.)
U: 0.182
Name: GARAGE (18 s.f.)
U: 0.182
Glazing
Inspection Status
Results are projected
El Name: FRONT (120 s.f.), U: 9.336, SHGC: 9.28, Orientation: SOUTH
11 Name: BACK (90 s.f.), U: a.33a, SHGC: a.28, Orientation: NORTH
11 Name: LEFT SIDE (93 s.f.), U: a.336, SHGC: a.28, Orientation: WEST
11 Name: LEFT SIDE GD (29 s.f.), U: 9.339, SHGC: 6.28, Orientation: WEST
C",
Energy Solutions
2
Energy Code Inspection Checklist
C-M
Energy Solutions
Property Organization
1571 LASH ST TSI Energy Solutions
CARMEL, IN 46032 Matthew Timmons Inspection Status
Results are projected
CC004 (AS DESIGNED) Builder
CLAY CORNER 4 LENNAR HOMES
E] Name: BSMT (32 s.f.), U: 0.330, SHGC: 0.28, Orientation: WEST
E] Name: RIGHT SIDE (73 s.f.), U: 0.330, SHGC: 0.28, Orientation: EAST
E] Name: BSMT (16 s.f.), U: 0.330, SHGC: 0.28, Orientation: EAST
Skylight
None Present
Mechanical Ventilation
None Present
Mechanical Equipment
U Fuel -fired air distribution • Natural Gas • 100% Heating Load @ 95.5 AFUE
0 Air conditioner • Electric • 100% Cooling Load @ 13 SEER
Water Heating • Electric • 100% Hot Water Load @ 0.93 Energy Factor
Air Leakage Control
ElTest Status: Blower -door tested
House is air -sealed as to achieve 3,832 CFM50 (5.00 ACH50) or less at final blower -door test.
Infiltration Requirements for IECC in Climate Zone 5
2009 IECC Infiltration limit for the design home is 7 ACH50.
2012 IECC Infiltration limit for the design home is 3 ACH50.
2015 IECC Infiltration limit for the design home is 3 ACH50.
3
Energy Code Inspection Checklist
Property
1571 LASH ST
CARMEL, IN 46032
CC004 (AS DESIGNED)
CLAY CORNER 4
Duct Leakage
Duct System 1
Organization
TSI Energy Solutions
Matthew Timmons
Builder
LENNAR HOMES
Inspection Status
Results are projected
NOT entirely within conditioned space, testing required
Tested Post -Construction
Leakage to Outdoors is specified in Ekotrope at 260.0 CFM @ 25Pa
Total Duct Leakage is specified in Ekotrope at 416.0 CFM @ 25Pa
Duct Leakage Code Requirements for IECC
2009 IECC:
Postconstruction Leakage Test: Duct Leakage to Outdoors <= 8 CFM25 / 100 sq ft CFA.
Rough in Test with AHU: Total Duct Leakage <= 6 CFM25 / 100 sq ft CFA.
Rough in Test without AHU: Total Duct Leakage <= 4 CFM25 / 100 sq ft CFA.
2012 IECC and 2015 IECC Prescriptive Path:
Postconstruction Leakage Test: Total Duct Leakage <= 4 CFM25 / 100 sq ft CFA.
Rough in Test with AHU: Total Duct Leakage <= 4 CFM25 / 100 sq ft CFA.
Rough in Test without AHU: Total Duct Leakage <= 3 CFM25 / 100 sq ft CFA.
2015 Performance Path (Cost Compliance):
C",
Energy Solutions
Leakage testing is required UNLESS all ducts and air handlers are located entirely within the thermal envelope.
There is no pass/fail threshold for duct leakage on the performance path.
Project Notes
5N5
4
Building Summary
C-M
Energy Solutions
Property Organization
1571 LASH ST TSI Energy Solutions
CARMEL, IN 46032 Matthew Timmons
Inspection Status
CCO04 [AS DESIGNED] Builder Results are projected
CLAY CORNER 4 LENNAR HOMES
General Building Information
Number Of Bedrooms 4
Number Of Floors 2
Conditioned Floor Area [sq. ft.] 5:213
Unconditioned, attached garage? Yes
Conditioned Volume [cu. ft.] 45;982
Total Units in Building 1
Residence Type Single family detached
Model PENNINGTON (C)
Community CLAY CORNER 4
Climate Zone 5A
Basement Wall
Name Library Type Height Above Grade Depth Below Grade Perimeter Location Enclosing
CONDIAMB R-11 Draped, Oft 1 8 197 Exposed Exterior Conditioned Space
CONDIGAR R-11 Draped, Oft 1 8 20 Exposed Exterior Conditioned Space
Basement Wall Library List
Name Feet From Wall Tap To Insulation Feet From Wall Top Tb Insulation Is Fully Insulated R-value
Tap Bottom
R-11 Draped, Oft 0 4 No 11.00
Name Library Type Perimeter Floor Grade Carpet R Exposed Surface Area Location Enclosing
Masonry Area
BSMT Uninsulated 217 Below Grade ❑ ❑ 2.139.0 sq. R. Exposed Exterior Conditioned
Space
Slab Library List
Name Wall C
Uninsulated Wood Frame / Other No ❑ 0 D 0.00
1
Building Summary
Property
Organization
1571 LASH ST
TSI Energy Solutions
CARMEL, IN 46032
Matthew Timmons
CCO04 [AS DESIGNED]
Builder
CLAY CORNER 4
LENNAR HOMES
Framed Floor
Framed Floor Library List
Inspection Status
Results are projected
C-M,
Energy Solutions
Rim Joist
i
Name
Library Type
Surface Area
Location
BAND CONDIAMB
G1 R-13, R-3.0
67.0 sq.ft.
Exposed Exterior
CONDIATTIC
G1 R-13, R-3.0
64.0 sq. ft.
Attic
CONDIGAR
G1 R-13, OSB
20.0 sq.ft.
Exposed Exterior
RIM CONDIAMB
G1 R-13, R-3.0
197.0 sq.ft.
Exposed Exterior
Rim Joist Library List
Name
R-value
G1 R-13, OSB
10.876
G1 R-13, R-3.0
13.575
Location
ONDIAMB 2X4
G1 R-13 BATT, R-3.0
Medium
2,413.0 sq. P[.
Exposed Exterior
CONDIATTIC
G1 R-13 BATT, R-3.0
Medium
408.0 sq. P[.
Attic
CONDIGAR
G1 R-13 Gar Walls
Medium
180.0 sq. ft.
Unconditioned, attached garage
2
Building Summary
C-M
Energy Solutions
Property Organization
1571 LASH ST TSI Energy Solutions
CARMEL, IN 46032 Matthew Timmons
Inspection Status
CCO04 [AS DESIGNED] Builder Results are projected
CLAY CORNER 4 LENNAR HOMES
brary List
Name R-value
G1 R-13 BATT, R-3.0 15.12
G1 R-13 Gar Walls 11.141
Glazing
Name Library Type Wall Assignment Basement Wall Overhang Depth Overhang Ft Te Overhang Ft Te Orientation Surface Area
Assignment Top Bottom
BACK 11-.33, SHGG28 CONDIAMB 2X4 ❑ 0 ❑ North 90.0 sq. R
BSMT 11-.33, SHGG28 CONDIAMB 0 0 ❑ West 32.0 sq. R
BSMT 11-.33, SHGG28 CONDIAMB 2X4 0 0 ❑ East 16.0 sq. R
FRONT 11-.33, SHGG28 CONDIAMB 2X4 0 0 ❑ South 1200.sq. ft.
LEFT SIDE U-.33, SHGG28 CONDIAMB 2X4 0 0 0 West 93.0 sq. R
LEFT SIDE GD U-.33, SHGG28 CONDIAMB 2X4 0 0 0 West 20.0 sq. R
RIGHT SIDE U-.33, SHGG28 CONDIAMB 2X4 0 0 0 East 73.0 sq. R
Glazing Library Li
Name Shgc U factor
I1-33, SHGC-28 028 0.330
Skylight
None Present
Skylight Library List
None Present
3
Building Summary
Property
Organization
1571 LASH ST
TSI Energy Solutions
CARMEL, IN 46032
Matthew Timmons
CCO04 [AS DESIGNED]
Builder
CLAY CORNER 4
LENNAR HOMES
Opaque Door
Name
FRONT Fiberglass Door CONDIAMB 2X4
GARAGE Fiberglass Door CONDIGAR
Opaque Door Library List
i
Name LI -factor
IFiberglass Door 0.182
C-M,
Energy Solutions
Inspection Status
Results are projected
0.9 0.75 Medium 24.0 sq. ft Exposed Exterior
0.9 0.75 Medium 18.0 sq. fL Exposed Exterior
Roof Insulation
Name Library Type Attic Exterior Area Clay or Concrete Roof Surface Color
P.f.] Tiles
SECOND R-3S Blown_ GR1 2.139 No Medium
Roof Insulation Library List
Name Has Radiant Barrier
'•0 .a l No
Whole House Infiltratio
Infiltration Measurement Type
5 ACH at 50 Pa Blower -door tested
t:
Mechanical Ventilation
None Present
RAalue
38268
4
SurfaceArea Location
2,139.0 sq. ft Attic
M
Building Summary
Property
1571 LASH ST
CARMEL, IN 46032
CCO04 [AS DESIGNED]
CLAY CORNER 4
Lighting
I % Interior Fluorescent
Lighting
Gnsite Generation
Organization
TSI Energy Solutions
Matthew Timmons
Builder
LENNAR HOMES
Inspection Status
Results are projected
C-M,
Energy Solutions
100 0 100 0 100
Onsite Generation Library List
None Present
Solar Generation
None Present
Solar Generation Library List
None Present
Conditioning Equipment
Name Library Type Heating Percent Load
Air conditioner CA13NA042 0%
Fuel -fired air 9155A4206OS17 100%
distribution
Water Heating RE350" 0%
Cooling Percent Load Hot Water Percent Load
100%
❑%
0%
0%
❑% 100%
Building Summary
Property Organization
1571 LASH ST TSI Energy Solutions
CARMEL, IN 46032 Matthew Timmons
Inspection Status
CCO04 [AS DESIGNED]
Builder Results are projected
CLAY CORNER 4
LENNAR HOMES
Equipment Type: 9155A42060SI
Fuel Type
Natural Gas
Distribution Type
Forced Air
Motor Type
PSG (Single Speed)
Heating Efficiency
95.5 AFUE
Heating Capacity [kBtulh]
58
Use default EAE
No
EAE [kWh]
636
rributi
nt Type: CA13NA042
ypeiencycity [kBtulh]
quipment Type: RE350*
Fuel Type
Distribution Type
Hot Water Efficiency
Tank Capacity {gal.]
Hot Water Capacity [kBtulh]
Recovery Efficiency
Electric
Forced Air
PSG (Single Speed)
13 SEER
40
Electric
Hydronic Delivery
0.93 Energy Factor
50
15.4
0.98
C-M,
Energy Solutions
Building Summary
Property
Organization
1571 LASH ST
TSI Energy Solutions
CARMEL, IN 46032
Matthew Timmons
Inspection Status
CCO04 [AS DESIGNED]
Builder Results are projected
CLAY CORNER 4
LENNAR HOMES
Distribution System
Distribution Type
Forced Air
Heating Equipment
Fuel-f red air distribution
Cooling Equipment
Air conditioner
Sq. Feet Served
5213
# Return Grilles
5
Supply Duct R Value
10
Return Duct R Value
10
Supply Duct Area [sq. ft.]
1407.51
Return Duct Area [sq. ft_]
1303.25
Duct Leakage to Outdoors (CFM25)
2.60
Total Leakage
416
Total Leakage Duct Test Conditions
Post -Construction
Use Default Flow Rate
Yes
Duct t
Duct Location
Conditioned Space
Percent Supply Area
50
Percent Return Area
50
Duct 2
Duct Location
Attic (well vented; under insulation)
Percent Supply Area
50
Percent Return Area
50
Duct 3
Duct Location
Conditioned Space
Percent Supply Area
❑
Percent Return Area
❑
Duct 4
Duct Location
Conditioned Space
Percent Supply Area
0
Percent Return Area
0
Duct 5
Duct Location
Conditioned Space
Percent Supply Area
❑
Percent Return Area
❑
Duct 6
Duct Location
Conditioned Space
Percent Supply Area
0
Percent Return Area
0
Ceiling Fan
'
Has Ceiling Fan
No
Cfm Per Watt
101
Water Distribution
Water Fixture Type
Standard
Use Default Hot Water Pipe Length
No
Hot Water Pipe Length [ft]
65
At Least R3 Pipe Insulation?
No
Hot Water Recirculation System?
No
Recirculation System Pipe Loop Length [ft]
34
Drain Water Heat Recovery?
No
C-M,
Energy Solutions
Building Summary
Property
1571 LASH ST
CARMEL, IN 46032
CCO04 [AS DESIGNED]
CLAY CORNER 4
Fuel Type
Cef
Field Utilization
lothes Washer
Label Energy Rating
Electric Rate
Annual Gas Cost
Gas Rate
Capacity
I mef
Appliances and Controls
Programmable thermostat?
Dishwasher Size
Dishwasher Efficiency
Range/Oven Fuel
Convection Oven?
Induction Range?
Refrigerator Consumption
F5NMM
5
Organization
TSI Energy Solutions
Matthew Timmons
Inspection Status
Builder Results are projected
LENNAR HOMES
Electric
Timer Controls
704 kWh/Year
0.0nWh
$23.00
$0.581Therm
2.874
❑.33053
Yes
Standard
270 kWh
Natural Gas
No
No
709 kWh/Year
C-M,
Energy Solutions
,�