HomeMy WebLinkAboutS100.1NEXISTING GARAGE
NEW BEDROOM #2
EXISTING STAIRS TO
BASEMENT
GUEST BATHROOM
MASTER BEDROOM
EXISTING BEDROOM #1
MASTER CLOSET
MASTER
BATHROOM
LAUNDRY ROOM
CLO. #6CLO.
#4
DINING ROOM
CLO.
#7
KITCHEN
EXISTING CONCRETE DRIVE
CLO. #5
2X10 CEILING JOIST @ 16" O/C.
NEW JOISTS TO BEAR ON NEW EXTERIOR WALLS
OPENING FOR HVAC CHASE
2-PLY 1-3/4W X 11-7/8"H
HEADER. TOP OF NEW
HEADER TO BE FLUSH WITH
BOTTOM OF EXISTING
CEILING FRAMING
LIVING ROOM
NEW 2X6 CEILING FRAMING IN
EXISTING VENT OPENING
NEW 2X6 CEILING FRAMING
AROUND (2) NEW SKYLIGHT
OPENINGS
EXIST.
CLO.
#1
EXIST
CLO.
#2
CLO. #3
**EXISTING CEILING FRAMING - 2X6 @ 16" O/C**
PERMIT
#1
ISSUE DATE:
2019-01-30
REV:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been prepared
by Case Design & Remodeling solely
for its use and should not be
reproduced or relied upon by any
other parties. Dimensions shown or
scaled are subject to change per
actual job condition and must be
verified. Materials are to be supplied
as specified as equal or standard
when not uniquely specified. Installed
materials may vary in appearance
from drawings. Reference
manufacturer's product data for actual
appearance and specifications.
HENTZ RESIDENCEHOUSE ADDITION &RENOVATION
PETER & MARGARET HENTZ13919 SHELBOURNE ROADCARMEL, INDIANA 46074Approved By:
Date:
S103
Craig Dice
Designer
cdice@caseindy.com
Dave Null
Lead Designer
dnull@caseindy.com
Katie Kramer
Designer
kkramer@caseindy.com
232160199
JOB NUMBER:
FIRST FLOOR CEILING FRAMING PLAN
SCALE: 1/8" = 1'
#2 2019-02-27
#3 2019-03-11
03/22/19
Adam Schriner