Loading...
HomeMy WebLinkAbout19030089 Right Of Way Permit3 CITY OF CARMEL RIGHT-OF-WAY PERMIT PERMIT NUMBER: 031 mil$_ I In.eering DO; i, TODAY'S DATE: 3 _ ESTIMATED DATE OF WORK: APPLICANT (Person doing the work) / COMPANY:�yu ADDRESS: //��✓t Z }Q PHONE: 6 EMAIL PERMITTC.- 19�U,94tawk u �Qig E-6L411 �Joo�S. I CUSTOMER., s )ADDRESS: IPHOEIE: ADDRESS OF PROJECT: t 10 ; (c• DESCRIPTION OF WORK {check all that apply) ROAD SORE ❑ DRIVEWAY REPLACEMENT CONSTRUCTION E^1TP,ANCE LANE CLOSURE ❑ STREET CUT ROAD CLOSURE ❑ .OTHER (DESCRIPTION: /tCGG�S� I T� G_�r�yka R TYPE OF SUR=ACE CUT (if applicable): "NOTE: OPEN C{IT5 IN PAVEMENT 9EQUIRE BOARD OF PUBLIC WORKS (BPW) APPROVAL* USE OF HEAVY EQUIPMENT YES N0 B DRAWING ATTACHED YES NO "NOTE: ON REVERSE SIDE OF Tl;15 PERMIT, PROVIDE NAtNIES AND CONTACTS OF ALL SUS -CONTRACTORS INVOLVED SURETY BOND. Please see Item #1 of the RIight-of-Way Conditions. BONDING COi,:1PANY: L .- c �/� S;u cac'c e BONDING N7UMRER: L5M f 0 (009 EXPIRATION DATE; �l,Cct �Olot,K, As applicant far this Right -of -Way Permit, 1 understand ❑rnd agree to a!! of the �Cecificotions and condition; listzd on the atercned sheet. h, licar.t's Signature} (Print Name) P£RMITGRA.NTED BY: (city Official) COMMENTS: S—Lf DATE !SSUED: �1� / REPAIR WORK INSPECTED AND APPROVED 1 hav2 inspec,ed the repair of the above right-of-way and find it to be completely satis=actory. (City Inspector) (Date Released)