HomeMy WebLinkAboutS003 - 223JGB RevisedFURN.EJECT. SUMP
SLAB RECESSED 4"
WHWS
2/6‐6/8
2/0‐6/82/6‐6/82/8‐6/8
2/8‐6/8
2/8‐6/8
MECHANICAL
ROOM
W.I.C.
BEDROOM 4
BATH 4
GAME ROOM
WET BAR
MEDIA ROOM
PARTIALLY
FINISHED
STORAGE
MECH BULKHEAD
2/8‐5/0 CO2/8‐6/8 CO42" VAN.
CXW14 (3/0-4/0)
CSW14 (3/0-4/0)
CXW14 (3/0-4/0)
16'-5" X 16'-4"
15'-4" X 14'-8"
15'-4" X 11'-0"
18'-0" X 12'-0"
17'-4" X 11'-5"36" H. BAR TOP OPEN UNDER
19'-9" X 34'-9"
POURED RETAINING WALL W/ BRICK FACE
& LIMESTONE CAP
DRYWALL @ WALLS & CLG. PER SPECs
DROPPED BULKHEAD
ROUGH-
IN SINK
CUSTOMER:
PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Wedgewood
Building Co., LLC
317.669.6300
32 First Street NE
Carmel, IN 46032
www.wedgewoodbc.com
Copyright c 2015 Wedgewood Building Co. LLC. 4/3/2019
1:30:39 PM
A8
The DeFelippis Residence
223JG Defelippis
223 Bridgemont @ Jackson's Grant
LOWER LEVEL INTERIOR FINISH SBS 1/4" = 1'-0"1 1 - LOWER LEVEL INTERIOR FINISH PLAN Rev.No. Date Description1 04/03/19 PLAN REV'SFINISH PLAN NOTES:
1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL.
By Andrew Lund at 1:31 pm, Apr 03, 2019
04/08/19
Mike Sheeks