Loading...
HomeMy WebLinkAboutBuilding Permit p2BUILDING PERMIT INFORMATION_ Carmel-c:lay Township Department of Commuzaity Deveioi mazat CARMEL ZONING ORDINANCE 2-160, SECTION 29.4.2(3): THE BUILDING COMMIS- SIONER (DIRECTOR, DEPT. OF COMMUNITY DEVELOPMENT OR STAFF) SHALL APPROVE OR DENY THE IMPROVEMENT LOCATION PERMIT (BUILDING PERMIT) WITHIN FIVE (5) WORKING DAYS OF THE RECEIPT OF THE WRITTEN APPLICATION FORM AND ACCOMPANYING MATERIALS. THE IMPROVEMENT LOCATION PERMIT (BUILDING PERMIT) SHALL BE ISSUED WHEN THE PROPOSED STRUCTURE, IMPROVEMENT OR USE AND ITS LOCATION CONFORM IN ALL RESPECTS TO THIS ORDINANCE. The following must be received by the Department of Community Develop- ment before any bui.loing or remodeling permit can be reviewed or issued by staff. 11 A completed Improvement Location Permit (Building Permit) application. 2. Two (2) complete sets of construction plans. In compliance with the State Energy Code, must list R -values on walls, ceilings, etc. If a commercial construction, plans must be stamped,:: by the I:diana State Department Of Fire Prevention & Building Safety. Indicate total height of build- ing or. plans. 3. A copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton Western Utilities, whichever applies), or septic permit (Hamilton County Health Department). 4. One (1) copy of plot plan from subdivision development plan 5. Three (3) copies of a site plan or plot plan showing the Eollowing REQUIRED information (can be obtained from the landowner or developer): --Lot drawn to scale -- all dintensions --Scala and north arrow --All roads, alleys, rights-of-way, etc.. --All other utilities and drainage rights-of-way and easements --Any applicable flood plain area --Building pad elevation and lot corner elevations --All accessory buildings -- existing or proposed --All sidewalks and driveways --Sewer and water lines, septic system and well location --Drainage flow arrows --All drainage swales and subsurface facilities (retention/ detention areas, etc.) --Dimensional cross sections of all drainage swales --Sump pump (sump pump pits) showing discharge locations --Geothermal heat pump discharge locations Drainage Swales: All required drainage swales must be shown on the plot plan and constructed in all subdivisions prior to the Department of Community Development performing a final inspec- tion of any structure per plans on file or per the following: Constructed swales shall be a minimum of 1'6" deep with side slopes of not less than 4 to 1. If this information is not submitted, it will extend the time it takes to get n approved building permit. I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETE!.Y AND ACCURATELY ON THE ATTACHED PLOT OR SITE PLAN AS SUBMITTED WITT' t BUILDING PERMIT APPLICATION TO THE CARMEL-CLAY DEPARTMENT OF COMMUNI - DEVELOPMENT. / / SIGNATURE: /� / /{ PHONE: ADDRESS;- _ 7/_V -Z T NAME OF I'LUMriNG CCNSTRACTOR (If applicable): VALID - ATF FLUMB':`,G LICENSE NUMBER: