HomeMy WebLinkAboutS203 - 3JGBLOFT
BEDROOM #3
BEDROOM #2
BATH #3
12'-0" x 14'-0"
11'-0" x 17'-0"
16'-6" x 11'-0"
CX15 (2/8-5/0)
CX16 (2/8-6/0)2/4‐6/82/6‐6/82‐2/0‐6/8
2/6‐6/8
2/4‐6/8
2/4‐6/82/4‐6/8MECH.
CHASE
W.I.C.
W.I.C.2/4‐7/0 C.O.2/4‐7/0 C.O.CW16 (2/5-6/0)CW16 (2/5-6/0) 2450 FX-100S2450 FX-100S CX15 (2/8-5/0)
DN
CUSTOMER:
PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Wedgewood
Building Co., LLC
317.669.6300
32 First Street NE
Carmel, IN 46032
www.wedgewoodbc.com
Copyright c 2019 Wedgewood Building Co. LLC. 3/13/2019
5:02:44 PM
A12
Wedgewood Building Co.
Spec Residence
Lot 3 Bridgemont @ Jackson's Grant
2ND FLOOR INTERIOR FINISH ABL 1/4" = 1'-0" 1 2ND FLOOR INTERIOR FINISH PLAN Rev.No. Date DescriptionFINISH PLAN NOTES:
1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS
TRADUCCIONES AL ESPAÑOL.
04/04/19
William Hohlt