HomeMy WebLinkAbout3JGB - Sewer Permit10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco
Residential SANITARY SEWER PERMIT 999913214
Permit Type Final Subdivision Jacksons Grant
Project WO
Project Name
Project Developer
Lift Station
Treatment Plant
Parcel Acreage
EDU in Gallons
ENG22015 Section Number
Jacksons Grant 1 B Lot Number
JG Development Co, LLC Address Number
26 Jacksons Grant Address 2
MIX Street
0.24 City
Local Sewer Charge - District Contribution
Plan Review and Inspection
Application Fee
EDU Fee
Interceptor Fee
Other Fees
Fees Due
Invoice Number
310 Zip Code
Phone Number
1B
3
496
Bridgemont Lane
Carmel
46032
Hamilton
Wedgewood Building Company
317-669-6315
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has: Main ID:
County
0.00
Builder
0.00
150.00
Phone Number
1908.00
Owner
0.00
Phone Number
0.00
862.60t�
2058.00
Occupant
Phone Number
1B
3
496
Bridgemont Lane
Carmel
46032
Hamilton
Wedgewood Building Company
317-669-6315
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has: Main ID:
JG864JG865
Grease Trap Slab Foundation
Grease Interceptor Crawl Space Manhole IDs USMH
JG -864 JG -865 DSMH
Grit Interceptor Basement YES Lid Elevation
859 ✓
858.28
Grinder Station First Floor Elevation
862.60/
862.60t�
Water Service City of Carmel Basement Elevation
852.60 t/
852.60
Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor
3.60
4.32. Ft.
Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by:
Ejector Pump Only
TriC0 currently requires that an W inspection is performed and a Certificate of Compliance is issued prior to occupancy /
sale of a properrty. Please review attached 1/1 Permit.
Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner.
The proper class of cleanout must be installed every 100 feet of lateral pipe measu ain to structure.
The terms of the conditional permit, if any, are listed below. OF.Er'x Grid
r`
Plans have been submitted. M1
All fees have been
No certificate of insurance
No additional permits required.
No manhole core permit required.
The facilitv is not classified as a FOG
By signing below, I attest that I am
Builder / Owner Signature
Printed Name I�aA+: Or --
Approved By
(Notes)
and agree to accept responsibility for all work d ne under this permit.
1 f Phone Number_(7(,3S k�V - a k's c
,e t n
03/25/2019
Permit is vali for O -YEAR from the date issued. Permit valid only with ThCo seal in red ink.
SUMMARY OF LATERAL INSTALLATION REQUIREMENTS
1. Only one building may connect to the sewer main per lateral unless otherwise approved by TriCo.
2. No foundation, Sump, Downspouts or other storm water drains shall be interconnected to TriCo's sanitary sewer
as addressed through our 1/1 Ordinance and I/I Policy found on our website at www.trico.eco.
3. The existing sewer line from the building to the septic tank may only be used if it is located under a building
addition, patio, porch or paved driveway. Air test is required to show if acceptable for re -use. The property owner
shall bear the cost of all testing. The TriCo inspector must be onsite for the duration of the air test.
4. TriCo shall inspect ALL laterals. The owner or contractor shall notify ThCo prior to backfilling the installed lateral.
Final connection shall only be made under direct supervision of a Trico inspector. An inspection must be
scheduled 24 hours in advance of the required inspection. If an inspection fails and a second inspection is needed
or the contractor is not on site for the scheduled inspection, a fee of $100.00 will be assessed and must be paid
prior to the time of the follow up inspection.
5. Septic effluent shall not be pumped out into the sanitary sewer system.
Property owners are hereby advised that the County Board of Health regulates the operation and maintenance of
private sewage disposal (septic) systems. The County Ordinance provides in part that, upon connection to a
public sewer, a septic tank "...shall be abandoned (pumped clean) and filled completely with earthen material or
stone in a safe and sanitary manner." Please contact the appropriate County Board of Health for further
information and to notify the department of the abandonment.
6. Acceptable Pipe Materials:
PVC PIPE: SDR 35 or SDR 26, ASTM D3034, SIX INCH PIPE
PVC PRESSURE RATED PIPE: SDR 21, ASTM D2241, SIX INCH PIPE
RESTRAINED JOINT PVC PIPE (DIRECTIONAL DRILL): Yelomine SDR 21,
ASTM D2241, SIX INCH PIPE (use only per approval of the District Engineer)
GASKETED JOINTS: ASTM D3212, FITTINGS: SDR26 OR BETTER
FERNCO OR SIMILAR FLEXIBLE COUPLINGS ARE TYPICALLY NOT ALLOWED WITHOUT APPROVAL
OF TRICO'S ENGINEER.
DUCTILE IRON MECHANICAL COUPLING WITH PROPER FITTINGS, INDIANA SEAL SHEAR GUARD,
AND/OR SDR 26 GASKETED REPAIR SLEEVES (Allowed)
PRIVATE GRINDER PUMPS ACCEPTABLE PIPE MATERIAL:
IF CONNECTING INTO A LOW PRESSURE FORCE MAIN-
TriCo must be contacted for explanation of allowable pumps and pump requirements
1.25" HDPE DR11 IPS (TYP.) connections are to be made with (Polypropylene or Stainless Steel),
Compression Fittings or Electrofusion
ALL PUMP CONNECTIONS:
Pumps located more than T perpendicular to or run longitudinally along the building for more than T shall have a
cleanout installed and the pipe shall be transitioned to 6" SDR 35 pipe for connection into the pump station.
CLEAN OUTS ARE TO BE LOCATED NO MORE THAN THREE FEET FROM THE FOUNDATION AND FOR
GRAVITY LATERALS NO MORE THAN 100 FEET APART (please see Clean Out Details Type 2 and Type 3 for
multiple cleanout installation requirements).
CLEAN OUT CAP REQUIREMENTS: 6" PVC Threaded Caps
7. BEDDING - Use Number 8 crushed stone or Number 8 fractured face aggregate Number 8 stone backfill
material is to be placed from 6 inches below to 12 inches above the pipe The trench should be a minimum of 18
inches wide (six inches on both sides of the pipe).
Contractors must lay 10 Gauge Solid Tone Wire the entire length of the lateral. The wire is to be placed on top of
the lateral. After the TriCo inspector has verified the placement of the wire, bedding is required to be placed on
top.
8. All splicing of tone wire shall be reconnected using either a 3M splice kit model DBR/Y-6, King Innovation
Dryconn Direct Bury Lug Aqua catalog # 90220, or TriCo Engineer approved equal.
9. Laterals shall be installed no closer than 20 feet from water wells unless PVC pressure grade pipe is used,
meeting SDR 21 and ASTM D2241 requirements. Any proposed installation requiring pressure pipe must be
reviewed and accepted by TdCo and TriCo's Engineer prior to installation.
10. Where a transition is made between SDR 35 pipe and pressure grade SDR 21 pipe, a ductile iron gasketed
mechanical couplings must be used.
11. Laterals must terminate within 3 feet of the building unless the conditions in item #3 above are met. Glued pipe is
NOT allowed outside three feet of building foundation walls.
12. All exteriors structures and piping are subject to be tested and/or televised upon TriCo's discretion.
Examples of structures that may be included are manholes, grit interceptors, pump pits, grease interceptors, etc.
13. Additional information on TriCo standards and specifications may be obtained from our website at www.trico.eco
or our office during business hours of 7:30 a.m. to 4:00 p.m. Monday through Friday
14. Call before you dig. IUPPS 1-800-382-5544, 48 hours prior to digging.
Trico Regional Sewer Utility
10701 North College Avenue Suite A
Indianapolis, Indiana 46280
Phone (317)-844-9200 Fax (317)-844-9203
Revised 08/07/2018
Colleen Byrnes
From: Ryan Hartman
Sent: Thursday, February 14, 2019 4:15 PM
To: Ryan Hartman
Subject: TriCo Sanitary Sewer Specification Update
To whom it may concern,
TriCo is in the process of rewriting lateral specification as we are finding too many unacceptable changes being made in
the field. If your sanitary sewer lateral does not line up with the approved plot plans TriCo will fail the Inspection. TriCo
asks that plot plans get revised, submitted and re -stamped for approval prior to an inspection.
The following additional requirements are effective Immediately:
1. Laterals less than 5' deep shall be at least 24" from the property line. Laterals less than 7' deep shall be at least
36" from the property line. Where the lateral runs in close proximity to the property line the property corners
must be staked prior to Inspection.
2. Laterals running parallel to a structure shall be at least 36" from the face of a crawl space or slab on grade
foundation and 60" from the face of a basement foundation wall.
3. Ancillary structures (e.g. window wells) and other utilities shall not be placed over or near the lateral. The above
spacing requirements apply with respect to the ancillary structure's foundation depth.
4. Trico may adjust requirements where future access to the lateral may be obstructed by other utilities. The
permit holder should call to discuss further if he/she believes this could bean Issue.
Ryan Hartman, District Engineer
TriCo Regional Sewer Utility
10701 North College Avenue, Suite A, Indianapolis, Indiana 46280
Phone 317-844-9200 • Direct 317-660-6604 • Website www.trico.eco • Email ryan.hartman()
Clay Township Regional Waste District is now TriCo Regional Sewer Utility. New Name Same Great Utilit
TriCo Regional Sewer Utility
10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco
Residential 1 & 1 Permit Ordinance 12-08-08
Lateral Location
Address Number
Address 2
Street
City
State
Zip Code
Subdivision
Section Number
Lot Number
Permit Information
_ Owner/Occupant Information
496 Owner
Facility Features and Addition Information
Slab Foundation
Crawl Space
Basement
Cleanout
Ejector Pump
Sump Pump
Grinder Station
Program Specifications
Owner Address if Different
Address Number
Address 2
Street
City ...
State
Zip Code
Builder Information
Builder Wedgewood Building Company
Phone Number 317-669-6315
First Name
Bridgemont Lane
Last Name
Carmel
Phone Number
IN
Mobile Number
46032
Fax Number
Jacksons Grant
Email Address
1B
3
Facility Features and Addition Information
Slab Foundation
Crawl Space
Basement
Cleanout
Ejector Pump
Sump Pump
Grinder Station
Program Specifications
Owner Address if Different
Address Number
Address 2
Street
City ...
State
Zip Code
Builder Information
Builder Wedgewood Building Company
Phone Number 317-669-6315
City of Carmel
Ejector Pump Only
JG864-JG865
26 Jacksons Grant
■ This program requires prior to the sale/occupance of a property that the property owner/builder notify TriCo and
schedule an inspection. The inspection will verify that:
• Downspouts are not connected to the sanitary sewer
• The sump pump is not connected to the sanitary sewer
• Cleanout caps are in place and watertight
■ No yard drains are connected to the sanitary sewer
■ There are no sinkholes or other indications that the sewer lateral is leaking
• 5 Ton or greater HVAC units do not dishcarge condenstion to the sanitary sewer.
■ If deficiencies are found, the property owner will be notified and must make corrections immediately. The property
owner will need to schedule a follow up inspection. If a certificate of compliance is not issued within 30 days of the
change in ownership, a sewer surcharge_ of $20 per month will be assessed and added to the sewer bill.
Owner/ Occupant Signature: k\k\ VLk 4 N Date:
Approved By: �,,,T e ►.��.�n,e Date: 3, 2z —1 7669
Square Footage
Water Type
YES
Basement Status
YES
Main ID
YES
Lift Station
YES
City of Carmel
Ejector Pump Only
JG864-JG865
26 Jacksons Grant
■ This program requires prior to the sale/occupance of a property that the property owner/builder notify TriCo and
schedule an inspection. The inspection will verify that:
• Downspouts are not connected to the sanitary sewer
• The sump pump is not connected to the sanitary sewer
• Cleanout caps are in place and watertight
■ No yard drains are connected to the sanitary sewer
■ There are no sinkholes or other indications that the sewer lateral is leaking
• 5 Ton or greater HVAC units do not dishcarge condenstion to the sanitary sewer.
■ If deficiencies are found, the property owner will be notified and must make corrections immediately. The property
owner will need to schedule a follow up inspection. If a certificate of compliance is not issued within 30 days of the
change in ownership, a sewer surcharge_ of $20 per month will be assessed and added to the sewer bill.
Owner/ Occupant Signature: k\k\ VLk 4 N Date:
Approved By: �,,,T e ►.��.�n,e Date: 3, 2z —1 7669