CHANGE ORDER - FINAL
Change order adjusts quantities to close PO 100474 and finalize the Contract.
Contract Price prior to this Change Order $7,051,577.05
Contract Price will be decreased by this Change Order ($425,662.78)
New Contract Price including this Change Order $6,625,914.27
4th and Range Line/Veterans Way Contract Summary
PO# PO-100472 PO-100473 PO-100473 PO-100473 PO-100474 Adjusted
Contract Price
a'
Project Veterans Way RL&4th RAB 4 SW West Community 6th Street
of Monon Crossing Fund
Original Contract $2,797,315.57 $654,132.69 $501,298.89 $1,000,000.00 $425,662.78 $5,378,409.93
Change Order 1 $1,605,251.69 $6,983,661.62
Change Order 2 $51,521.68 $7,035,183.30
Change Order 3 $52,244.51 $7,087,427.81
Change Order 4 $556,312.82 $7,643,740.63
Change Order5 $61,754.48 $7,705,495.11
Change Order 6 ($52,400.75) ($245,247.64) $7,407,846.72
Change Order 7 ($356,269.67) $7,051,577.05
Change Order 8 ($425;662.78) $7,051,577.05
Adjusted Amount $4,654,132.09 $715,730.93 $256,051.25 $1,000,000.00 $0.00 $6,625,914.27
Amount Remaining $0.00 $0.00 $0.00 $0_00 $0.00 $0.00
r
CITY OF CARMEL
TO: Rieth Riley Construction Co, Inc. CONTRACT CHANGE ORDER NO.: 8(FINAL)
1751 West Minnesota Street DATE: January 7,2019
Indianapolis, IN 46221 PROJECT NAME: 17-ENG-13
CITY REQ.NO.:
CITY PO NO.: 100474
4 ROLE,
CITY PO DATE: 6/1/2017
I. You are directed to make the following changes in this Contract:
Adjust quantities for final change order to contract.
SCHEDULED ADJUSTMENT
ITEM AMOUNT (+)OR( - DAYS
* See detail of items and summary of changed costs in attached Table
TOTAL OF CHANGE ORDER ITEMS -$425,662.78 0 Days
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: _n/a W.D.C.NO.: n/a
Other:_Adjusted quantities to close PO 100474 and finalize the Contract.
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $7,051,577.05
Contract Price will be increased by this Change Order (S425.662.78
New Contract Price including this Change Order $6.625.914.27
Contract Time prior to this Change Order 150 Days 6/19/2018 Completion Date
Net increased resulting from this Change Order 0 Days
Current Contract Time including this Change Order 6/19/2018 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are Recommended The Above Changes Are Accepted Approved
CROSSROAD ENGINEERS Rieth-Riley Construction Co. Inc. James Br • d,Mayor
ENGINEER CONTRACTOR
3417 Sherman Drive 1751 West Minnesota Street ere Cas an,C. ngin
Address Address
Beech Grove, IN 46107 Indianapolis.IN 46221 Mary rk embe
City/State/Zip City/State/Zip
Lori(Wat ember
By: By: ATT T:`
Phone: 317-780-1555 Phone: 574-875-5183
ul.Christine S.Pauley,Clerk-
Date: //7/g0/I Date: �v/ Date: 401,7
17-ENG-13-6th Street SW
CHANGE ORDER#8 TABLE
Item I Original Final
No. Description Unit Unit Price Quantity Original Amount Quantity Final Amount Over-Under
1 Construction Engineering LS S 61.410.00 0.1 S 6.141.00 0 S - S (6.141.00)
- Mobilization and Demobilization LS $ 115.308.95 0.1 $ 11,530.90 0 S - S (11,530.90)
3 Field Office MO S 1.462.85 4.5 $ 6,582.83 0 S , S (6.582.83)
4 Office Equipment MO S 1.375.33 4.5 S 6,188.99 0 S - S (6.188.99)
5 Maintenance of Traffic LS S 31.047.00 0 S - 0 S - S -
6 Clearing of Right of Way LS S 75.455.81 0.1 S 7.545.58 0 S - S (7,545.58)
7 Excavation.Common CYD S 37.51 400 5 15,004.00 0 S - S (15,004.00)
8 Borrow CYD S 0.01 _ 1422 $ 14.22 0 S - S (14.22)
9 SWQCP Preparation and Implementation Level 1 LS S 5,700.00 0.1 $ 570.00 0 S - $ (570.00)
10 Storm Water Quality Management Budget DOL S 1.00 5000 S 5.000.00 0 S • S (5,000.00)
11 Subgrade Treatment IV SYD S 24.48 1195 S 29,253.60 0 S • S (29,253.60)
12 Subgrade Treatment,FB SYD S 11.50 0 S - 0 S - $ -
13 Subgrade Treatment Type❑ SYD S 18.01 _ 226 $ 4,070.26 0 S - S (4,070.26)
14 Structural Backfill,Type I LFT S 16.81 554 S 9,312.74 0 S - S (9.312.74)
15 Compacted Ag regateNo.33 Stone TONS S 23.34 775 $ 18,088.50 0 S - S (18.088.50)
16 Subgrade Treatment(Undistributed) CYD S 65.79 0 S - 0 S - S -
17 Geogrid SYD S 3.57 919 5 3,280.83 0 $ , S (3.280.83)
18 I Asphalt Milling,1.5" SYD S 6.61 0 S - 0 S - S
19 HMA Surface.Type'C,9 5 mm TON S 95.13 0 S - 0 S - S ,
20 HMA Intermediate.Type'C.19.0 mm TON S 70.63 0 S - 0 S - $ -
21 I HMA Intermediate.Type'C',O.G.19.0 mm TON S 66.31 0 S - 0 S - S -
22 I H6L4 Base.Type'C,25.0 mm TON S 67.11 0 S - 0 S - S -
23 HMA Surface.Type'B',9.5 mm TON S 93 21 143 $ 13,329.03 0 S - S (13.329.03)
24 HMA Intermediate.Type'B'.19.0 mm TON S 83 05 217 $ 18,021.85 0 S - S (18.021.85)
25 HMA Base,Type'B',25.0 mm TON S 76.14 134 $ 10,202.76 0 S - S (10202.76)
26 Asphalt for Tack Coat TON S 0.01 0.8 S 0.01 0 S - S (0.01)
27 PCCP.7" SYD S 104.45 0 S - 0 $ - S 28 Sidewalk,Concrete SYD S 41.76 165 S 6.890.40 0 S - S (6.890.40)
29 Curb Ramp.Concrete,Includes Detectable Warning Elements SYD $ 177.19 5.6 $ 992.26 0 S - S (992.26)
30 Concrete Curb,Barrier LET S 14.81 387 $ 5,731.47 0 S - S (5,731.47)
31 Modified Roll Curb LFT S 32.48_ 0 S - 0 5 - S
32 Center Curb.Type D SYD S 165.10_ 0 S - 0 S S -
33 Curb and Gutter.Concrete,Type II LFT S 21.84 699 $ 15,266.16 0 S - S (15266.16)
34 6'Variable Barrier Curb LFT S 60.61 0 S - 0 S - S ,
35 Concrete Band LFT S 115.74 0 S - 0 S - S -
36 PCCP for Approaches.Residential.6" SYD S 74.06 0 S - 0 S - S -
37 PCCP for Approaches,Commercial.9" SYD S 69.91 226 $ 15,799.66 0 S - S (15.799.66)
38 Raised Crosswalk EA S 12.97059 0 S - 0 S - S
39 Topsoil(Assume 6"Thick) CYD S 52 59 75 5 3,944.25 0 S - S (3.944.25)
40 Sodding,Nursery SYD S 3.50 445 $ 1,557.50 0 S - S (1.557.501
41 Pipe,PVC.Circular.6" LET S 56 73 0 S - 0 5 - S -
42 Pipe.PVC,Circular,10' LET S 34 27 24 5 822 48 0 S - S (822.48)
43 Pipe.PVC.Circular.12' LET S 58.53 0 S - 0 S - S -
44 Pipe.Type 2,Circular,12" LFT S 53.42 361 S 19.284.62 0 S - S (19,284.64
45 Pipe,Type 2,Circular,15° LFT S 60.61 66 S 4,000.26 0 S - $ (4,000.26)
46 Pipe,Type 2,Circular.18" LFT S 64.62_ 64 S 4,135.68 0 5 - S (4,135.68)
47 Pipe.Type 2.Circular.21" LET S 115.23 0 S - 0 S - S -
48 Pipe,Type 2,Circular.24' LET S 137.29 39 $ 5,354.31 0 5 • S (5,354.31)
49 15"Pipe End Section EA S 470.68 0 S - 0 S - S -
50 Mechanical Plug For RCP Pipe EA S 722.49 0 S - 0 S - $ ,
51 Pipe,Type 4.Circular.6" LET S 6.25 479 $ 2,993.75 0 S - S (2.993.75)
52 Pipe,Underdrain Outlet,6" LET S 26.50 0 5 - 0 S - S -
53 Aggregate for Underdrain CYD S 45.10 45 $ 2.029.50 0 S - $ (2.02950)
54 Geotextile for Underdrain SYD S 1.85 431 $ 797.35 0 S - $ (797.35)
55 Inlet B-15 EA S 2,950.35 0 $ - 0 S - S -
56 Inlet,C-I5 EA S 2.961.60 0 S - 0 S - S -
57 Inlet,J-10 EA $ 2,588.71 3 5 7,766.13 0 S - S (7,766.13)
58 Inlet M-10 EA S 2.546.14 3 S 7,638.42 0 S - S (7,638.42)
59 Inlet 1 with casting R-3290-A EA 5 2,716.64 0 S - 0 S - S -
60 Inlet.M with casting R-3290-A EA $ 2,677.59 0 S - 0 $ - S -
61 Inlet E with Casting R-4215-C EA S 2,139.13 1 $ 2.139.13 0 S - S (2.139.13)
62 Nvloplast Inlet EA S 1.414.12 0 S - 0 5 - S ,
63 Manhole,C4 EA S 4,878.83 2 S 9,757.66 0 S - S (9.757 66)
64 Manhole,D4 EA S 6272.73 0 S - 0 S - S -
65 Manhole,C with Casting R-3290-A EA S 5,901.51 0 S - 0 S - S -
66 Contech WQ STR CDS 4 EA S 15.795.92 0 5 - 0 S - S -
67 Contech WQ STR CDS 6 EA $ 27,748.71 1 S 27,748.71 0 S - S (27.748.71)
68 Replace Casting and Adjust to Grade EA S 1,260.28 1 S 1260.28 0 S - S (1,260.28)
69 Adjust Casting to Grade EA S 690.87 I 5 690.87 0 S - S (690.87)
70 Sign Post Square.Type I.Reinf.Anc.Base LFT S 20.00 24 5 480.00 0 S - S (480.00)
71 Relocate Existing Sign EA $ 350.00 0 S - 0 S - S -
72 Decorative Street Sign Assembly EA S 1,600.00 2 S 3,200.00 0 S - S (3200.00)
73 Sign,Sheet,with legend 0.080" SET S 21.00 12.5 $ 262.50 0 S - S (262.30)
74 Sign.Sheet with legend 0.100" SET S 22.00 0 S - 0 S - S -
75 Service Point,II,Modified EA S 1,500.00 0 S - 0 5 - S -
76 Controller Cabinet.PI,Modified EA 5 3200.00 0 S - 0 S - S -
77 Controller Cabinet Foundation,Pl.Modified EA S 1,900.00 0 S - 0 S - S -
17-ENG-13-6th Street SW
CHANGE ORDER#8 TABLE
Item Original
Description Unit Unit Price Original Amount FinalaOven-UnderFinal Amount Ov 'Under
No Quantity Quantity.
78 Handhole,Lighting EA S 800.00 1 S 800.00 0 S - S (800.00)
79 Wire,44 Copper in Plastic Duct in Trench.4 PC LFT S 14.00 I60 S 2,2240.00 0 S - S (2,240 00)
80 Conduit,Steel,Galvanized,2' LFT S 16.00_ 118 S 1,888.00 0 S - S (1.888.00)
81 Wire.04 Copper in Plastic Duct 4 PC LET S 8.00 118 S 944.00 0 S - S (944 00)
82 Lighting Foundation,18"Diameter,Concrete,with Ground EA S 850.00 3 S 2,550.00 0 S - S (2.550.00)
83 Light Pole.15'Height-Ornamental EA S 5,900.00 3 S 17,700.00. 0 S - S (17.700.00)
84 j Lighting Foundation-30"Diameter,Concrete,with Ground EA S 1,400.00 0 S - 0 S - S -
85 Light Pole,30'Height With 8'Ann EA S 7.700.00 0 S - 0 S - S -
86 Handhole-Communications EA S 1.300.00 0 S - 0 S - S -
87 Handhole,3'Diameter.Communications EA S 2.500.00 0 S - 0 S - S -
88 I 4'x4h4'•Split Communications Box EA S 6.000.00 0 S - 0 S - S -
89 I Communication Duct Bank LFT S 105.00 0 S - 0 S - S -
90 4"Innerrduct with 3 a 1-I,'2'Innerducts LFT S 16.00 0 S - 0 S - S -
91 4"PVC.Schedule SO LFT 5 15.00 0 S - 0 S - S -
92 Trans.Mrk,Thermo.Solid White,Crosswalk,White.24' LFT S 12.00_ 48 S 576.00 0 S - S (576.00)
93 Trans.Mrk.Thermo.Stop Bar,24' LFT S 12.00 23 S 276.00 0 S - S (276.001
94 Line.Thermo.Solid,Yellow,4" LFT S 200 612 $ 1,224.00 0 S - S (1.224.00)
95 Line.Thermo,Solid,Yellow.8" LFT S 4.00 0 S - 0 S - S -
96 I Line.Thermo.Solid.White,4" LET S 2.00 306 S 612.00 0 S - S (612.00)
97 Line.Thermo,Solid,White.6" LFT S 3.00 0 S - 0 S - S -
98 Line,Theme.Solid Blue.4' LFT S 20.00 0 S - 0 S - S -
99 Line.Thermo,Dotted,White,4' LFT S 2.00 0 S - 0 5 S -
100 Line,Thermo,Dotted White,8" LFI' S 4.00_ 0 S - 0 S - S -
101 Trans.Mrk.Thermo Yield White,3',Shark Teeth.Yield Line LFT S 15.00 0 S - 0 S - S -
102 Transverse Marking,Thermoplastic.Pedestrian Crossing EA S 150.00 0 S - 0 S - S -
103 Lane Indication Arrow,White-Thermoplastinc,Transverse Marking EA S 1 50.00 0 5 - 0 S - S -
104 Handicap Sign EA S 500.00 I S 500.00 0 S - S (500.00)
105 Handicap Emblem(Painted) EA S 250.00 I S 250.00 0 S - S (250.00)
106 Snowplowable Raised Pavement Marker.Blue EA S 250.00 0 S - 0 S - S -
107 Snowplowable Raised Pavement Marker,Yellow EA 5 82.40 0 S - 0 S - S -
108 Building Demolition LS S 25,000.00 0 S - 0 S - S -
109 Sanitary Sewer Manhole,Type I EA S 10.280 33 0 S - 0 S - S -
110 15'PVC-SDR-26 Sanitary Main LFT S 83.I 0 S - 0 S - S
111 Compacted Aggregate Backfill,Sanitary Main LFT S 39.57_ 0 S - 0 S - S -
112 Clean Sanitary Manhole,Rotate and Adjust Casting to Grade EA S 1,497.88 1 S 1,497.88 0 S - S (1.497.88)
113 Core Existing Manhole EA S 1,469.91 0 S - 0 S - S -
114 6"PVC Sanitary Lateral LET S , 77 33 0 S - 0 S - S -
115 8"PVC Sanitary Lateral LFT S 85.53 0 S - 0 S - S -
116 Compacted Aggregate Backfrll,Sanitary Sewer Lateral LFT S 30.53 0 S - 0 S - 5 -
117 Sanitary Sewer Cleanout,Type❑ EA S 524.70 0 S - 0 S - S -
118 12"D.L Water Main LFT S 90.22 392 S 35.366.24 0 S - S (35,36624)
119 Compacted Aggregate BackfilL Watermain LFT S 18.74 392 S 7,346.08 0 S - 5 (7.346.08)
120 Complete Fire Hydrant Assembly EA S 5.488.65 0 S - 0 S - S -
121 6'Tapping Valve and Saddle EA S 5,360.49 0 S - 0 S - S -
122 122"Tapping Valve and Saddle EA S 7.165.43 0 S - 0 S - S -
123 12"Gate Valve EA S 3.055.10 2 $ 6,110.20 0 S - S (6.110.201
124 8"Gate Valve EA S 1.611.39 0 S - 0 S - S -
125 4"Gate Valve EA S 1,173.66 0 S - 0 S - S -
126 12"Connections EA S 3.505.85 1 $ 3.505.85 0 S - S (3.505 85)
127 8"Connections EA S 3,529.50_ 0 S - 0 S - S -
128 4"Connections EA S 3.217.44 0 S - 0 S - 5 -
129 Longside Services EA S 2,397.00 0 S - 0 S - S -
130 Shonside Services EA S 1.175.63 0 S - 0 S - S -
131 2"Blow Off Assembly EA S 1.775.83 0 S - 0 S - S -
132 Replace Meter Pit(Undistributed) EA S 3,453.97 0 S - 0 S - S -
133 Line Stop 12"(Undistributed) EA S 8,341.77 0 S - 0 S - S -
134 Line Stop 8"(Undistributed) EA S 6.041.77 0 S - 0 S - S -
135 Line Stop 6"(Undistributed) EA S 5,741.77 0 S - 0 S - S -
136 Team Insena Valve 12'(Undistributed) EA S 18,841.77 0 5 - 0 S - S •
137 Team Inserta Valve 8'(Undistributed) EA S 10,541.77 0 S - 0 S - S -
138 Team lnserta Valve 6'(Undistributed) EA S 9.141.77_ 0 S - 0 S - S -
139 Valve Retirement EA S 1.009.06 0 S - 0 S - S -
140 Hydrant Retirement EA S 1.149.72_ 0 S - 0 _ S - S -
141 12"Concrete Cap for Waterman SYD S 44.27 0 S - 0 S - S -
142 Flowable Fill For Watennain CYD S 87.72 0 S - 0 5 - S -
143 Duke Energy Transmission Duct Bank LET S 424.34 0 S - 0 S - S -
144 12'x 6'x 7'Electric Manhole Vault EA S 33,465.72 0 S - 0 S - S -
145 Duke Energy Distribtuion Duct Bank LET S 343.22 0 S - 0 5 - S -
146 Cured-In-Place Conduit Spot Repair LET S 100.00 0 S - 0 S - S -
147 Trash Enclosure EA S 11,929.29 1 S 11.929.29 0 S • S (11.929.29)
148 Trench Drain LET S 312.33 28 S 8,745.24 0 S - S (8,745 24)
149 Archway Relocation LS S 239,237 56 0 S - 0 S S -
150 Manhole.C-10 - EA S 3,460.78 2 S 6,921.56 0 S - S (6.921.56)
TOTAL OF CHANGE ORDER ITEMS S (425.662.781
ORIGINAL CONTRACT PRICE S 7,051.577.05
17-ENG13-6th Street SW
CHANGE ORDER#8 TABLE
Rem
No. al
Description i C rut Unit Price Original Original Amount Quantity
Final Amount Over/Under
CHANGE ORDER#8 S (425,662.781
NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS S 6,625,914.27
17-ENG13-6TH STREET SW
EXHIBIT A
You have been directed to make the following changes in this Contract;
Item
No Description Reason For Change
1 Construction Engineering Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
2 Mobilization and Demobilization Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
3 Field Office Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
4 Office Equipment Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
6 Clearing of Right of Way Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
7 Excavation,Common Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
8 Borrow Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
9 SWQCP Preparation and Implementation Level 1 Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
10 Storm Water Quality Management Budget Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
11 Subgrade Treatment,IV Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
13 Subgrade Treatment Type II Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
14 Structural Backfill,Type 1 Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
15 Compacted Aggregate No.53 Stone Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
17 Geogrid Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
23 HMA Surface,Type'9',9.5 ram Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
24 HMA Intermediate,Type'8',19.0 mm Adjusted quantities to balance original contract quantities due to the project being removed front the contract.
25 HMA Base.Type'B',25.0 mm Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
26 Asphalt for Tack Coat Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
28 Sidewalk,Concrete Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
29 Curb Ramp,Concrete,Includes Detectable Warning Elements Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
30 Concrete Curb,Barrier Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
33 Curb and Gutter,Concrete,Type II Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
37 PCCP for Approaches,Commercial,9" Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
39 Topsoil(Assume 6"Thick) Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
40 Sodding,Nursery Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
42 Pipe,PVC,Circular,10' Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
44 Pipe,Type 2,Circular,12' Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
45 Pipe,Type 2,Circular,15' Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
46 Pipe,Type 2,Circular,18' Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
48 Pipe,Type 2,Circular,24' Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
51 Pipe,Type 4,Circular,6" Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
53 Aggregate for Underdrain Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
54 Geotextile for Underdrain Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
57 Inlet,Ylo Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
58 Inlet,M-10 Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
61 Inlet.E with Casting R-4215-C Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
63 Manhole,C4 Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
67 Contech WQ STR,CDS 6 Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
68 Replace Casting and Adjust to Grade Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
69 Adjust Casting to Grade Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
70 Sign Post,Square,Type 1,Reinf.Anc.Base Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
72 Decorative Street Sign Assembly Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
73 Sign,Sheet,with legend 0.080" Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
78 Hartdhole,Lighting Adjusted quantities to balance original contract quantities due to the project being removed from the contract
79 Wire,014 Copper in Plastic Duct In Trench,41/C Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
80 Conduit,Steel,Galvanized,2" Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
81 Wire,44 Copper in Plastic Duct,41/C Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
82 Lighting Foundation,18"Diameter,Concrete,with Ground Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
83 Light Pole,15'Height,Ornamental Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
92 Trans.Mrk,Thermo,Solid White,Crosswalk,White,24" Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
93 Trans.Mrk,Thermo,Stop Bar.24" Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
94 Line,Thermo,Solid,yellow,4" Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
96 Line,Thermo,Solid,White,4" Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
104 Handicap Sign Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
105 Handicap Emblem(Painted) Adjusted quantities to balance original contract quantities due to the project being removed from the contract
112 Clean Sanitary Manhole,Rotate and Adjust Casting to Grade Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
118 12"D.I.Water Main Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
119 Compacted Aggregate Backfill,Watermain Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
123 12"Gate Valve Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
126 12"Connections Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
147 Trash Enclosure Adjusted quantities to balance original contract quantities due to the project being removed front the contract.
148 Trench Drain Adjusted quantities to balance original contract quantities due to the project being removed from the contract.
150 Manhole,C-10 Adjusted quantities to balance original contract quantities due to the project being removed from the contract.