Loading...
HomeMy WebLinkAboutMilestone/Eng/CO #1 Final/31,427.40/5th Street NE Improvements – Project #18-SW-21 City of Carmel Project 18-SW-21 5th Street NE Improvements Change Order #1, FINAL Local Request scope changes and added work. Contract Price prior to this Change Order $403,390.00 Contract Price will be increased by this Change Order $31,427.40 New Contract Price including this Change Order $434,817.40 Amount Adjusted Contract Cumulative%Change Price from Original Contract Original Contract $403,390.00 $403,390.00 N/A CO1 $31,427.40 $434,817.40 07.7% CITY OF CARMEL TO:Milestone Contractor,LP CONTRACT CHANGE ORDER NO.: 1,FINAL 5950 S.Belmont Ave. DATE:03/29/19 Indianapolis,IN 46217 PROJECT NAME: 5th Street NE Improvements CITY PROJECT NO.:#18-SW-2I CITY PO NO.: #101922 CITY PO DATE: 9/15/18 ‘4,z, I. You are directed to make the following changes in this Contract: 601 Miscellaneous Project scope changes and additional work as directed locally. SCHEDULED ADJUSTMENT ITEM AMOUNT (+1 OR(- )DAYS See Attached $31.427.40 132 * See detail of items and summary of changed costs in attached Table for items 1 through 50 II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order:R.F.P.: n/a W.D.C.NO.: n/a Other: By Request from the City of Carmel • The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $403,390.00 Contract Price will be increased by this Change Order $31,427.40 New Contract Price including this Change Order $434,817.40 Contract Time 60 days plus 132 days due to utility delays 3/27/209 New Completion Date This Change Order is for full and final settlement of all direct,indirect,impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended The Above Changes Are Accepted Approved CROSSROAD ENGINEERS TO: Milestone Contractor,LP & P re '— ENGINEER CONTRACTOR Jame rainard,Mayor 3417 Sherman Drive 5950 S.Belmont Ave. Address Address asht.Cit j tgine eech G ove.IN 4610. Indianapolis,IN 46217 City/Si �. ��� City/State/Zip Mary r- ,Meg er By;�; ��� By: C�a Phone: 3 17-780-1555 Phone: 317-788-6885 Lo s Member Date: Alp /20 Date: 4/1/19 A 'stine S.Pauley"'Clerk-Treasurer ' Date: %7/7//�j PROJECT NAME: 5th Street NE Improvements CONTRACT CHANGE ORDER NO.: 1,FINAL Number Description Unit Unit Price Originaltem Original Amount ntity Actual Final Amount Over/Under 1 Construction Engineering LS $10,000.00 I $ 10,000.00 1 $ 10,000.00 $ - 2 Mobilization and Demobilization LS $20,000.00 I $ 20,000.00 1 $ 20,000.00 $ - 3 Clearing Right of Way LS $15,894.00 1 $ 15,894.00 1 $ 15,894.00 $ - 4 Common Excavation CYS $40.00 615 $ 24,600.00 615 $ 24,600.00 $ - 5 Borrow CYS $70.00 40 $ 2,800.00 40 $ 2,800.00 $ - 6 Storm Water Management Budget DOL $1.00 4634 $ 4,634.00 2373 $ 2,373.00 $ (2,261.00) 7 SWQCP Preparation and LS 1 $ 4,000.00 1 $ 4,000.00 Implementation,Level 1 $4,000.00 $ - 8 Structural Backfill,Type I CYS $50.00 417 $ 20,850.00 541.22 $ 27,061.00 $ 6,211.00 9 Flowable Backfill,Removable CYS $0.00 0 $ - 0 $ - $ - 10 Compacted Aggregate Base,No.53 TON $28.00 543 $ 15,204.00 563.87 $ 15,788.36 $ 584.36 11 Milling Asphalt,Variable Depth SYS $0.00 0 $ - 0 $ - $ - 12 HMA Surface,9.5mm TON $140.00 94 $ 13,160.00 92.93 $ 13,010.20 $ (149.80) 13 HMA Surface,Wedge and Level TON $0.00 0 $ - 0 $ - $ - 14 HMA Intermediate,19.0mm TON $95.00 125 $ 11,875.00 140.09 $ 13,308.55 $ 1,433.55 15 HMA Patching,Full Depth SYS $0.00 0 $ - 0 $ - $ - 16 Topsoil(Undistributed) TON $540.00 2 $ 1,080.00 0 $ - $ (1,080.00) 17 Sidewalk,Concrete,4 in. SYS $50.00 190 $ 9,500.00 320.56 $ 16,028.00 $ 6,528.00 18 Curb Ramp,Concrete SYS $270.00 9 $ 2,430.00 30.56 $ 8,251.20 $ 5,821.20 19 Curb and Gutter,Type II LFT $20.00 1015 $ 20,300.00 1052 $ 21,040.00 $ 740.00 20 PCCP for Approaches,6 in. SYS $125.00 92 $ 11,500.00 126.63 $ 15,828.75 $ 4,328.75 21 Riprap,Revetment TON $95.00 5 $ 475.00 2.9 $ 275.50 $ (199.50) 22 Geotextile for Riprap,Type IA SYS $10.00 7 $ 70.00 7 $ 70.00 $ - 23 Sodding,Nursery SYS $7.50 499 $ 3,742.50 0 $ - $ (3,742.50) 24 Topsoil(Undistributed) CYS $75.00 83 $ 6,225.00 83 $ 6,225.00 $ - 25 12 in.RCP LFT $60.00 272 $ 16,320.00 269 $ 16,140.00 $ (180.00) 26 12 in HDPE LFT $58.00 31 $ 1,798.00 33 $ 1,914.00 $ 116.00 27 15 in.RCP LFT $65.00 153 $ 9,945.00 153 $ 9,945.00 $ - 28 Cap and Fill Existing Pipe LS $2,100.00 1 $ 2,100.00 1 $ 2,100.00 $ - 29 Inlet,Type'A' EA $2,000.00 2 $ 4,000.00 2 $ 4,000.00 $ - 30 Inlet,Type'T EA $2,300.00 2 $ 4,600.00 2 $ 4,600.00 $ - 31 Inlet,Type'M' EA $2,100.00 2 $ 4,200.00 2 $ 4,200.00 $ - 32 Manhole,Type MC' EA $2,600.00 3 $ 7,800.00 3 $ 7,800.00 $ - 33 Pipe End Section,15 in. EA $1,800.00 1 $ 1,800.00 1 $ 1,800.00 $ - 34 SanitaryManhole,Adjust Casting to EA $465.00 3 $ 1,395.00 3 $ 1,395.00 $ - rade 35 Adjust to Grade,Water Valve Box EA $465.00 2 $ 930.00 2 $ 930.00 $ - 36 Remove,Replace and Relocate Hydrant EA $0.00 0 $ - 0 $ - $ - 37 Maintenance of Traffic LS $30,000.00 1 $ 30,000.00 1 $ 30,000.00 $ - 38 Sign,Sheet,Relocate EA $550.00 2 $ 1,100.00 0 $ - $ (1,100.00) 39 Sign,Sheet,Relocate and Furnish EA 1 $ 1,000.00 $ Assembly $1,000.00 0 - $ (1,000.00) 40 Transverse Marking,Thermoplastic, LFT 102 $ 1,275.00 $ 925.00 Crosswalk Line,White,24 in. $12.50 74 $ (350.00) 41 Transverse Marking,Thermoplastic, LFT 21 $ 262.50 $ 250.00 Stop Line,White,24 in. $12.50 20 $ (12.50) 42 Office Equipment EA $4,000.00 1 $ 4,000.00 0 $ - $ (4,000.00) 43 Nyloplast Drain Basin,24 in. EA $2,200.00 1 $ 2,200.00 I $ 2,200.00 $ - 44 Concrete Cap for Street Cut Repair,12 SYS 0 $ - $ in. $0.00 0 $ - 45 HMA,Base,25.0mm TON $90.00 179 $ 16,110.00 199.59 $ 17,963.10 $ 1,853.10 46 Snowplowable Raised Pavement EA 2 $ 2,000.00 $ 2,000.00 Marker,Blue $1,000.00 2 $ - PROJECT NAME: 5th Street NE Improvements CONTRACT CHANGE ORDER NO.: 1,FINAL Number tem Description Unit Unit Price Original Original Amount Qantity nh Final Amount Over/Under 47 Water Main Ductile Iron,6 in. LFT $85.00 507 $ 43,095.00 502 $ 42,670.00 $ (425.00) 48 6 in.Gate Valve EA - $1,600.00 4 $ 6,400.00 6 $ 9,600.00 $ 3,200.00 49 8 in.Connection EA $2,400.00 I $ 2,400.00 1 $ 2,400.00 $ - 50 6 in.Connection EA $2,200.00 2 $ 4,400.00 2 $ 4,400.00 $ - 51 4 in.Connection EA $2,400.00 1 $ 2,400.00 1 S 2,400.00 $ - 52 Short Side Service EA $2,300.00 2 $ 4,600.00 2 $ 4,600.00 S - 53 Valve Retirement EA $535.00 4 $ 2,140.00 4 $ 2,140.00 $ - 54 Hydrant Retirement EA $535.00 1 $ 535.00 1 $ 535.00 $ - 55 8 in.Cut and Cap EA $575.00 1 $ 575.00 1 $ 575.00 $ - 56 6 in.Cut and Cap EA $530.00 2 $ 1,060.00 2 $ 1,060.00 $ - 57 4 in.Cut and Cap EA $510.00 2 $ 1,020.00 2 $ 1,020.00 $ - 58 Fire Hydrant Assembly EA $6,200.00 I $ 6,200.00 1 $ 6,200.00 $ - 59 Fire Hydrant Adjust to Grade EA $2,000.00 1 $ 2,000.00 1 $ 2,000.00 $ - 60 Subgrade Treatment,Type 113 SYS $10.00 1539 $ 15,390.00 1511.85 $ 15,118.50 $ (271.50) 61 CWU Added items and work to LS 0 $ $ 8211.21 - accommodate field conditions $8,211.21 1 $ 8,211.21 62 Chastain Fence Replacement LS $7,172.03 0 $ - I $ 7.172.03 $ 7,172.03 TOTAL OF CHANGE ORDER ITEMS $403,390.00 $434,817.40 $31,427.40 ORIGINAL CONTRACT PRICE $403,390.00 CHANGE ORDER,#1 FINAL $31,427.40 NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS $434,817.40 PROJECT NAME: 5th Street NE Improvements EXHIBIT A You have been directed to make the following changes in this Contract: Item Description Reason For Change No. I Construction Engineering atiiu,ted to balance original quantities versus actual quantities used for original items 2 Mobilization and Demobilization adjusted to balance original quantities versus actual quantities used for original items 3 Clearing Right of Way adjusted to balance original quantities versus actual quantities used for original items 4 Common Excavation adjusted to balance original quantities versus actual quantities used for original items 5 Borrow adjusted to balance original quantities versus actual quantities used for original items 6 Storm Water Management Budget Underrun due to less implemented than initially included in itemized proposal 7 SWQCP Preparation and Implementation,Level 1 adjusted to balance original quantities versus actual quantities used for original items 8 Structural Backfill,Type I Overrun to account for some water main and not utilizing flowable backfill underrun 9 Flowable Backfill,Removable Underrun due to not having to utilize this item at all 10 Compacted Aggregate Base,No.53 Overrun due to added subgrade treatment,MOT and added sidewalk for Bleckwell 1 I Milling Asphalt,Variable Depth Underun due to elimination of partial reconstruction and utilizing total reconstruction 12 HMA Surface,9.5tmm adjusted to balance original quantities versus actual quantities used for original items 13 HMA Surface,Wedge and Level Underun due to elimination of partial reconstruction and utilizing total reconstruction 14 HMA Intermediate,19.0mm adjusted to balance original quantities versus actual quantities used for original items 15 HMA Patching,Full Depth Underun due to elimination of partial reconstruction and utilizing total reconstruction 16 Topsoil(Undistributed) adjusted to balance original quantities versus actual quantities used for original items 17 Sidewalk,Concrete,4 in. Overrun due to added sidewalk for Blackwell Park at City's direction 18 Curb Ramp,Concrete Overrun due to added sidewalk for Blackwell Park at City's direction 19 Curb and Gutter,Type B adjusted to balance original quantities versus actual quantities used for original items 20 PCCP for Approaches,6 in. Overrun due to accommodating field conditions 21 Riprap,Revetment adjusted to balance original quantities versus actual quantities used for original items 22 Geotextile for Riprap,Type IA adjusted to balance original quantities versus actual quantities used for original items 23 Sodding,Nursery Underrun due to utilizing another contract due to timing and acquiring sod 24 Topsoil(Undistributed) adjusted to balance original quantities versus actual quantities used for original items 25 12 in.RCP adjusted to balance original quantities versus actual quantities used for original items 26 12 in HDPE adjusted to balance original quantities versus actual quantities used for original items 27 15 in.RCP adjusted to balance original quantities versus actual quantities used for original items 28 Cap and Fill Existing Pipe adjusted to balance original quantities versus actual quantities used for original items 29 Inlet,Type'A' adjusted to balance original quantities versus actual quantities used for original items 30 Inlet,Type 1r adjusted to balance original quantities versus actual quantities used for original items 31 Inlet,Type ms' adjusted to balance original quantities versus actual quantities used for original items 32 Manhole,Type'C' adjusted to balance original quantities versus actual quantities used for original items 33 Pipe End Section,15 in. adjusted to balance original quantities versus actual quantities used for original items 34 Sanitary Manhole,Adjust Casting to Grade adjusted to balance original quantities versus actual quantities used for original items 35 Adjust to Grade,Water Valve Box adjusted to balance original quantities versus actual quantities used for original items 36 Remove,Replace and Relocate Hydrant adjusted to balance original quantities versus actual quantities used for original items 37 Maintenance of Traffic adjusted to balance original quantities versus actual quantities used for original items 38 Sign,Sheet,Relocate adjusted to balance original quantities versus actual quantities used for original items 39 Sign,Sheet,Relocate and Furnish Assembly adjusted to balance original quantities versus actual quantities used for original items 40 Transverse Marking,Thermoplastic,Crosswalk Line,White,24 in. adjusted to balance original quantities versus actual quantities used for original items 41 Transverse Marking,Thermoplastic,Stop Line.White.24 in. adjusted to balance original quantities versus actual quantities used for original items 42 Office Equipment Underrun due to not having to utilize this item at all 43 Nyloplast Drain Basin,24 in. adjusted to balance original quantities versus actual quantities used for original items 44 Concrete Cap for Street Cut Repair,12 in. adjusted to balance original quantities versus actual quantities used for original items 45 HMA,Base,25.0mm adjusted to balance original quantities versus actual quantities used for original items 46 Snowplowable Raised Pavement Marker,Blue adjusted to balance original quantities versus actual quantities used for original items 47 Water Main Ductile Iron,6 in. adjusted to balance original quantities versus actual quantities used for original items 48 6 in.Gate Valve Overrun due to Cannel Water Utility field changes 49 8 in.Connection adjusted to balance original quantities versus actual quantities used for original items 50 6 in.Connection adjusted to balance original quantities versus actual quantities used for original items 51 4 in.Connection adjusted to balance original quantities versus actual quantities used for original items 52 Short Side Service adjusted to balance original quantities versus actual quantities used for original items 53 Valve Retirement adjusted to balance original quantities versus actual quantities used for original items 54 Hydrant Retirement adjusted to balance original quantities versus actual quantities used for original items 55 8 in.Cut and Cap adjusted to balance original quantities versus actual quantities used for original items PROJECT NAME: 5th Street NE Improvements EXHIBIT A You have been directed to make the following changes in this Contract: Item No Description Reason For Change 56 6 in.Cut and Cap adjusted to balance original quantities versus actual quantities used for original items 57 4 in.Cut and Cap adjusted to balance original quantities versus actual quantities used for original items 58 Fire Hydrant Assembly adjusted to balance original quantities versus actual quantities used for original items 59 Fire Hydrant Adjust to Grade adjusted to balance original quantities versus actual quantities used for original items 60 Subgrade Treatment,Type 1B adjusted to balance original quantities versus actual quantities used for original items 61 CWU Added items and work to accommodate field conditions Changes implemented at Cannel Water Utility request 62 Chastain Fence Replacement Agreement between the City and the property owner to reset fence at project cost Milestone FAHq March 12, 2019 City of Carmel Contract: 18-SW-21 Attn: Lance Stahley Re: Change Order—Jenny Chastain Property Fence Installation Extra Work Mr. Stahley; Milestone is submitting the attached information for payment for the work its subcontractor will be performing. Hittle Construction Inc. will be installing permanent fencing for the property owned by Jenny Chastain. The contract originally only included work to remove the existing fence. Attached to this letter is the breakdown and quote information for the work that will be done by Hittle Construction Inc.. The total cost is expected to be$7,172.03 and Milestone is requesting a change order in this amount on the contract. If you need further information or have any questions about the above pricing feel free to contact me. Sincerely, MILESTONE CONTRACTORS, L.P. Chad Scott General Superintendent Milestone Contractors,L.P. • Equal Opportunity Employer • P.O. Box 421459 Indianapolis, IN 46242-1459(317)788-6885 fax(317)788-1098 F '�', a Milestone Contractors, L.P. Extra Work Pricinq Summary Project No:18-SW-21 Date Requested:3/12/19 Date Submitted:3/12/19 Description of Work: Notes: Hittle Construction Inc.will be installing new fence to match the fence that was removed under the original contract. Reason for Extra Work: Original Contract Only included Fence removal Has Work Already Been Completed? No When: Week of 3/18/2019 MCLP Project No. 181026 Cost Activity Code: 99950-820 All calculations and markups represent the application of INDOT Standard Specification 109.05 Extra Work and Force Account Work 0 Quantity: LFT Labor: Cost= $ - Markup% 20% $ - Total $ - Equipment: Cost= $ - Markup% 12% $ - Total $ - Materials: Cost= $ - Markup% 12% $ - Total $ - Subcontract: Cost= $ 6,825.00 Markup% 10% $ 300.00 Markup% 7% Total $ 7,125.00 Trucking: Cost= $ - Markup% 12% $ - Total $ - $ 6,825.00 $ 300.00 $ 7,125.00 Insurance&Bond Cost= $ 42.75 Markup% 10% $ 4.28 Total $ 47.03 Total $ 7,172.03 Unit Price Extra Days Requested Hittle Construction Inc. 17466 Washington Street Estimate Westfield, IN 46074-8725 Date Estimate# 2/21/2019 5471 Name/Address Milestone Project Chastain Residence Description Qty Cost Total Install 157'of 42"-48"cedar picket fence along side yard of 1 4,945.00 4,945.00 property. Fence will consist of 4x4 treated posts,2x4 cedar stringers and 1x4 dog ear pickets. All posts will be set in concrete footings with dirt cleaned up and hauled away. Panels will be installed in galv 2x4 hangers for removable sections.All gates will be supplied by homeowner. Trim on top of posts will match existing fence and pineapple caps added. Prime and paint all new fence material white. One coat of primer I 1,880.00 1,880.00 and one coat of finish paint. Chastain Residence 511 2nd Avenue NE Carmel,IN Total $6,825.00 Phone# Fax# 317-896-9073 317-896-3238 CITY OF CARMEL ENGINEERING DEPARTMENT Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 04/01/19 Re: C.O.#1-FINAL-5th Street NE Improvements Project#18-SW-21 Doug, please find attached 1 original of same change order for project #18-SW-21 5th Street NE Improvements. Please review&initial for the next BPW Meeting. Change Order #1 FINAL- Original Contract Amount: $403,390.00 Increase: $31,427.40 New Contract Amount: $434,817.40 Thank you, Lisa Scott • Page 1